Outline ·
[ Standard ] ·
Linear+
Home solar 4 months in.
|
bleeper
|
Jun 21 2025, 08:20 AM
|
|
QUOTE(backspace66 @ Jun 21 2025, 07:45 AM) We are not talking about peak ac output in KW , we are talking about the electricity generation (kwh) , mine also got clipped sometime as i see the panel generate exactly at the max kw ac output of the inverter But his calculation of 7.45x 3.5 =26.075 is impossible since max also is 5.5kw x 3.5 hours right?
|
|
|
|
|
|
bleeper
|
Jun 21 2025, 08:26 AM
|
|
QUOTE(LiMcZ @ Jun 21 2025, 07:41 AM) Isit? Mine indeed is single phase The sales said maximum 12 panel, So I had been conned ? If you check your seda certificate it will show declared capacity is 5kwac
|
|
|
|
|
|
bleeper
|
Jun 21 2025, 11:07 AM
|
|
QUOTE(LiMcZ @ Jun 21 2025, 10:08 AM) yea, from SEDA is 5kwac, means maxmum i can get is 5.5kwp ? so 5.5 x 3.5 = 19.5? Not necessary. Maximum you can get at any moment is up to 5.5kwac. But throughout the day it fluctuates depending on cloudy weather or not. You need to check your generation graph on the inverter app to see the actual generation. Mine is 7.2kwp single phase. Very hot and clear sunny day (rarely) can go up to 35kwh on that day. Lowest if rainy day in selangor like yesterday only 12-14kwh. Average around 24-28kwh/ day in a month for me. Sample of the graph below: This post has been edited by bleeper: Jun 21 2025, 11:10 AM
|
|
|
|
|
|
bleeper
|
Jun 25 2025, 09:19 AM
|
|
QUOTE(LiMcZ @ Jun 24 2025, 07:30 AM) I using the fox cloud 2.0 app String inverter from pathgreen Mine also does not show self consumption as they need to install another meter to monitor this. Usually those 3 phase one will include the meter for free. If single phase need pay additional if want to install the meter.
|
|
|
|
|
|
bleeper
|
Sep 13 2025, 07:28 PM
|
|
QUOTE(flyingkick @ Sep 13 2025, 03:29 PM) Just received my TNB bill. The Jumlah Penggunaan(kwh) is referring to my import from TNB only, or import + energy consumed from solar panel before any export? Your import only. TNB won’t know how mich your own consumption before export.
|
|
|
|
|