QUOTE(BRE @ Jan 12 2024, 09:26 AM)
Serasi construction will be completed eariler than scheduled or will stick to d schedule?
*
we are confident it will be on schedule, or slightly ahead...

n definitely ahead of your HDA/SPA timeline
ericyong
post Jan 12 2024, 01:04 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


QUOTE(pooh88 @ Jan 12 2024, 11:27 AM)
Bossku by 2027 can complete the Serasi?  bruce.gif  sweat.gif  whistling.gif
*
my contract until q1 2026 only worrr....
ericyong
post Jan 18 2024, 09:47 AM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


QUOTE(BRE @ Jan 13 2024, 11:50 AM)
Means must complete by Q1 2026?😬
*
that one is my contract; whether developer want to VP same time anot up to them lor... but then if complete who dont want to VP right? hehe
ericyong
post Jan 18 2024, 09:48 AM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


user posted image
user posted image
ericyong
post Jan 22 2024, 01:39 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


QUOTE(BRE @ Jan 22 2024, 07:56 AM)
Boss, when is d construction for the carpark n facility building going to start?

Any reason why construction for block 2 is ahead of block 1 even though d latter block was launched 1st?
*
car park side going to go full swing soon.

hehe that time block2 foundation completed earlier, so go ahead first
ericyong
post Feb 1 2024, 09:59 AM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


user posted image
user posted image
ericyong
post Feb 1 2024, 09:59 AM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


if i post everyday later you all say the project not moving
ericyong
post Feb 26 2024, 09:17 AM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


user posted image
ericyong
post Mar 19 2024, 01:50 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


QUOTE(jojolicia @ Mar 16 2024, 03:55 PM)
Eric kor busy with SV3 dy
*
hehehe sorry sorry for the delay.... had to send drone for service, kena rain that day...

user posted image
ericyong
post Mar 19 2024, 01:53 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


user posted image
ericyong
post Mar 19 2024, 01:55 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


Block 2 now completing Level 30...

Block 1 at Level 21

Block 3 at Level 24

ericyong
post Mar 19 2024, 01:57 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


QUOTE(BRE @ Mar 15 2024, 11:29 PM)
Will reach 31 soon another 3 months? Super fast this crest builder🤟
*
no need to wait 3 months.... already almost there for block 2.

come end next month reach rooftop for block 2
ericyong
post Apr 4 2024, 04:00 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


QUOTE(BRE @ Apr 4 2024, 07:54 AM)
👍pls ensure quality is Tkk as well😄
*
quality will be good for sure....

btw, what is TKK
ericyong
post Apr 18 2024, 11:11 AM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


car park works will be last to come up as it is not on critical path, plus it affects the logistics. but dont worry - it is only 7 storeys, very fast it'll come up already
ericyong
post Apr 18 2024, 11:11 AM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


QUOTE(BRE @ Apr 16 2024, 01:22 PM)
Serasi start painting liao. Boss eric, how come still under construction but so fast start painting external walls?
*
base coat mar... dont worry warranty not affected
ericyong
post Apr 18 2024, 03:32 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


QUOTE(BRE @ Apr 18 2024, 01:03 PM)
Tot base coat painting will only start after construction in completed? Any reason why start painting now?
*
the works on the area completed already, so can start painting.
ericyong
post Apr 19 2024, 09:30 AM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


QUOTE(BRE @ Apr 19 2024, 07:51 AM)
Upper floors construction ongoing, wouldnt it affect d painting below?
*
minimal wet trades above - so doesnt affect already lorrrr
ericyong
post Apr 22 2024, 10:16 AM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


user posted image
user posted image


This post has been edited by ericyong: Apr 22 2024, 10:16 AM
ericyong
post Apr 27 2024, 04:32 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


huh? why suddenly want to kiss me?
ericyong
post May 7 2024, 01:13 PM

On my way
****
Junior Member
529 posts

Joined: Mar 2009


user posted image