Renovations RECOMMENDATION FOR TNB CONTRACTOR - 3 PHASE

views
     
TSJapBoyRockS
post Jun 15 2022, 05:28 PM, updated 4y ago

Getting Started
**
Junior Member
204 posts

Joined: Oct 2008
From: Subang Jaya


Hi!

Just wondering if anyone done a 3 phase conversion before for terrace recently?

Any reliable wiring TNB contractor to recommend? SUBANG JAYA area. Thanks!

This post has been edited by JapBoyRockS: Jun 15 2022, 05:29 PM
bobowyc
post Jun 15 2022, 06:00 PM

You are who you are.
******
Senior Member
1,921 posts

Joined: Apr 2013
From: Petaling Jaya


First you can check at TNB website. They have their list of certified contractors. I used one from their website. I chose the 5 star one though xD
mini orchard
post Jun 15 2022, 06:25 PM

10k Club
********
All Stars
14,511 posts

Joined: Sep 2017
QUOTE(JapBoyRockS @ Jun 15 2022, 05:28 PM)
Hi!

Just wondering if anyone done a 3 phase conversion before for terrace recently?

Any reliable wiring TNB contractor to recommend? SUBANG JAYA area. Thanks!
*
TNB has a list of approved contractors.
TSJapBoyRockS
post Jun 15 2022, 06:42 PM

Getting Started
**
Junior Member
204 posts

Joined: Oct 2008
From: Subang Jaya


QUOTE(bobowyc @ Jun 15 2022, 06:00 PM)
First you can check at TNB website. They have their list of certified contractors. I used one from their website. I chose the 5 star one though xD
*
thanks! how much for the whole process yeah? if you dont mind
bobowyc
post Jun 15 2022, 10:52 PM

You are who you are.
******
Senior Member
1,921 posts

Joined: Apr 2013
From: Petaling Jaya


QUOTE(JapBoyRockS @ Jun 15 2022, 06:42 PM)
thanks! how much for the whole process yeah? if you dont mind
*
Roughly RM5k for the new TNB board, submission etc. Not inclusive if you need to pull new wiring from TNB pole, nearest pole, or new pole in front of your house. And also if your DB is 3phase ready or not, if its still single phase need to change to 3 phase board also, additional charges all there. A new pole I heard was roughly RM5k also.
TSJapBoyRockS
post Jun 16 2022, 03:31 PM

Getting Started
**
Junior Member
204 posts

Joined: Oct 2008
From: Subang Jaya


QUOTE(bobowyc @ Jun 15 2022, 10:52 PM)
Roughly RM5k for the new TNB board, submission etc. Not inclusive if you need to pull new wiring from TNB pole, nearest pole, or new pole in front of your house. And also if your DB is 3phase ready or not, if its still single phase need to change to 3 phase board also, additional charges all there. A new pole I heard was roughly RM5k also.
*
wow! thanks for the info. Really appreciate it. called a few places and they refuse to give me an indicative quote. only told me the cost for submitting to TNB is RM1000.
the rest they have to come by and have a look
bobowyc
post Jun 16 2022, 07:16 PM

You are who you are.
******
Senior Member
1,921 posts

Joined: Apr 2013
From: Petaling Jaya


QUOTE(JapBoyRockS @ Jun 16 2022, 03:31 PM)
wow! thanks for the info. Really appreciate it. called a few places and they refuse to give me an indicative quote. only told me the cost for submitting to TNB is RM1000.
the rest they have to come by and have a look
*
My guy charged me RM500 for the TNB guys to go over and check and quote. It'll take time though.. My guy said need wait a few months. lol Rm1k a bit pricey though. But usually they need to go over and check/inspect before giving a quote, better get a few different quotes to confirm and compare prices.
jolmy
post Jun 16 2022, 10:04 PM

Meow
******
Senior Member
1,182 posts

Joined: Jan 2003


QUOTE(JapBoyRockS @ Jun 16 2022, 03:31 PM)
wow! thanks for the info. Really appreciate it. called a few places and they refuse to give me an indicative quote. only told me the cost for submitting to TNB is RM1000.
the rest they have to come by and have a look
*
I did mine last year when I renovate and also did rewiring for the entire terrace house. In this case I used my electrical contractor. However, as my contractor is not under TNB panel, then he will arrange for a "TNB runner" to submit the application & liaise with TNB regarding this.

Indicative Cost:
1) 3-phase meter board with 3x 63A cut-out fuse & neutral connector : RM900

2) TNB runner fee : RM1,100

3) TNB connection fee : RM300 (for terrace house, tap directly from the supply line running across the row of houses, this should be what you need to pay. Expect to pay more if require relocation of cables, pulling new cables from pole, or even erecting poles)

4) 3-phase Distributiion Box (DB) with Main Switch MCB, RCCB & set of MCBs (the cost varies depending on brand, size, and whether you will have more than 1 DB) - in my case RM1,800 (rather huge 4-row DB)

Rewiring is not required as your electrician is supposed to do load-balancing by assigning circuits to the 3 phases (red, yellow, blue phases) - e.g. if you have 6 air-conds, ideally 2 air-conds on each phase, same goes for lighting points, water heater, sockets, etc. Get your electrician to quote you as there may be manpower charges for this.

However, if you plan to rewire the entire house, expect to spend an additional RM10,000 or more, depending on the number of points you wish to have.

In my case, the process took around a month.

This post has been edited by jolmy: Jun 16 2022, 10:05 PM
TSJapBoyRockS
post Jul 28 2022, 06:32 PM

Getting Started
**
Junior Member
204 posts

Joined: Oct 2008
From: Subang Jaya


QUOTE(jolmy @ Jun 16 2022, 10:04 PM)
I did mine last year when I renovate and also did rewiring for the entire terrace house. In this case I used my electrical contractor. However, as my contractor is not under TNB panel, then he will arrange for a "TNB runner" to submit the application & liaise with TNB regarding this.

Indicative Cost:
1) 3-phase meter board with 3x 63A cut-out fuse & neutral connector : RM900

2) TNB runner fee : RM1,100

3) TNB connection fee : RM300 (for terrace house, tap directly from the supply line running across the row of houses, this should be what you need to pay. Expect to pay more if require relocation of cables, pulling new cables from pole, or even erecting poles)

4) 3-phase Distributiion Box (DB) with Main Switch MCB, RCCB & set of MCBs (the cost varies depending on brand, size, and whether you will have more than 1 DB) - in my case RM1,800 (rather huge 4-row DB)

Rewiring is not required as your electrician is supposed to do load-balancing by assigning circuits to the 3 phases (red, yellow, blue phases) - e.g. if you have 6 air-conds, ideally 2 air-conds on each phase, same goes for lighting points, water heater, sockets, etc. Get your electrician to quote you as there may be manpower charges for this.

However, if you plan to rewire the entire house, expect to spend an additional RM10,000 or more, depending on the number of points you wish to have.

In my case, the process took around a month.
*
Thank you! sorry for the absence, was busy with work..

anyways just an update, they told me

1) TNB runner fee: RM1000

2) TNB reconnection fee: about RM2000, mine require to dig 2 houses and lay the cable... and then tar back the road

3) DB = My contractor provided.

4) 3-phase meter board with 3x 63A cut-out fuse & neutral connector : nobody said anything about this yet

Now lets see how long is it gonna take...
jolmy
post Jul 29 2022, 11:05 AM

Meow
******
Senior Member
1,182 posts

Joined: Jan 2003


QUOTE(JapBoyRockS @ Jul 28 2022, 06:32 PM)
Thank you! sorry for the absence, was busy with work..

anyways just an update, they told me

3) DB = My contractor provided.

4)  3-phase meter board with 3x 63A cut-out fuse & neutral connector : nobody said anything about this yet

Now lets see how long is it gonna take...
*
No. 3 is owned by you, hence your contractor would have included this in the cost you need to pay to him

No. 4 is actually owned by TNB, but you need to pay for this as well, from my understanding. Not sure if this has been included in your charges for No. 2.

madasis
post Feb 24 2023, 04:59 PM

New Member
*
Newbie
5 posts

Joined: Dec 2012
Hi everyone, can share which contractor you used in the end for 3 phase upgrade process? I would like to reach out to them for my home project.

The TNB list of contractors is not helpful as some say do projects only and some never reply. The system doesn't work.
thenazek
post Feb 24 2023, 05:25 PM

On my way
****
Junior Member
566 posts

Joined: Oct 2012


Hey, my company Carput Technologies does electrical works and EV charging.

We are based in Bandar Sunway. Hit me up if you are interested.
LDP
post Mar 1 2023, 11:31 AM

On my way
****
Junior Member
632 posts

Joined: Sep 2011
Hi guys, Just piggyback on this thread...Do I need 3 phase wiring for charging my car or is single phase dah cukup ?
tinkai2
post Jul 8 2023, 03:56 PM

New Member
*
Junior Member
9 posts

Joined: Dec 2010


QUOTE(LDP @ Mar 1 2023, 11:31 AM)
Hi guys, Just piggyback on this thread...Do I need 3 phase wiring for charging my car or is single phase dah cukup ?
*
Kineta checked my one phase , drawing 60A when all air cond , heaters etc turned on. So have to upgrade to 3 phase. This post is.very informative. Thks

joshgm_119
post Jul 19 2023, 05:02 PM

Getting Started
**
Junior Member
203 posts

Joined: Aug 2009
From: Klang Valley


QUOTE(tinkai2 @ Jul 8 2023, 03:56 PM)
Kineta checked my one phase , drawing 60A when all air cond , heaters etc turned on. So have to upgrade to 3 phase. This post is.very informative. Thks
*
Curious did Kineta do the upgrade to 3 phase? Or did TNB contractor do the upgrade then Kineta only did the charger installation?
inferno75
post Jul 26 2023, 01:19 PM

Getting Started
**
Junior Member
102 posts

Joined: Mar 2005
QUOTE(JapBoyRockS @ Jul 28 2022, 06:32 PM)
Thank you! sorry for the absence, was busy with work..

anyways just an update, they told me

1) TNB runner fee: RM1000

2) TNB reconnection fee: about RM2000, mine require to dig 2 houses and lay the cable... and then tar back the road

3) DB = My contractor provided.

4)  3-phase meter board with 3x 63A cut-out fuse & neutral connector : nobody said anything about this yet

Now lets see how long is it gonna take...
*
Hi, mind to PM me your TNB contractor?

I search in TNB but was forwarded a lot of contractors from ST. Then when I call some of them, they are like blur and not sure what is your work scope.


wilxom
post Dec 27 2023, 03:34 PM

New Member
*
Junior Member
14 posts

Joined: Dec 2011


QUOTE(jolmy @ Jun 16 2022, 10:04 PM)
I did mine last year when I renovate and also did rewiring for the entire terrace house. In this case I used my electrical contractor. However, as my contractor is not under TNB panel, then he will arrange for a "TNB runner" to submit the application & liaise with TNB regarding this.

Indicative Cost:
1) 3-phase meter board with 3x 63A cut-out fuse & neutral connector : RM900

2) TNB runner fee : RM1,100

3) TNB connection fee : RM300 (for terrace house, tap directly from the supply line running across the row of houses, this should be what you need to pay. Expect to pay more if require relocation of cables, pulling new cables from pole, or even erecting poles)

4) 3-phase Distributiion Box (DB) with Main Switch MCB, RCCB & set of MCBs (the cost varies depending on brand, size, and whether you will have more than 1 DB) - in my case RM1,800 (rather huge 4-row DB)

Rewiring is not required as your electrician is supposed to do load-balancing by assigning circuits to the 3 phases (red, yellow, blue phases) - e.g. if you have 6 air-conds, ideally 2 air-conds on each phase, same goes for lighting points, water heater, sockets, etc. Get your electrician to quote you as there may be manpower charges for this.

However, if you plan to rewire the entire house, expect to spend an additional RM10,000 or more, depending on the number of points you wish to have.

In my case, the process took around a month.
*
Hi, can you share with me your electrical man. Prefer one dragon service instead of different people doing it. Besides that, called most of TNB listing, they are not interested in small project. Thanks 🙏
wos
post Jun 14 2025, 10:02 PM

Enthusiast
*****
Senior Member
908 posts

Joined: Jan 2005
From: USJ


QUOTE(jolmy @ Jun 16 2022, 10:04 PM)
I did mine last year when I renovate and also did rewiring for the entire terrace house. In this case I used my electrical contractor. However, as my contractor is not under TNB panel, then he will arrange for a "TNB runner" to submit the application & liaise with TNB regarding this.

Indicative Cost:
1) 3-phase meter board with 3x 63A cut-out fuse & neutral connector : RM900

2) TNB runner fee : RM1,100

3) TNB connection fee : RM300 (for terrace house, tap directly from the supply line running across the row of houses, this should be what you need to pay. Expect to pay more if require relocation of cables, pulling new cables from pole, or even erecting poles)

4) 3-phase Distributiion Box (DB) with Main Switch MCB, RCCB & set of MCBs (the cost varies depending on brand, size, and whether you will have more than 1 DB) - in my case RM1,800 (rather huge 4-row DB)

Rewiring is not required as your electrician is supposed to do load-balancing by assigning circuits to the 3 phases (red, yellow, blue phases) - e.g. if you have 6 air-conds, ideally 2 air-conds on each phase, same goes for lighting points, water heater, sockets, etc. Get your electrician to quote you as there may be manpower charges for this.

However, if you plan to rewire the entire house, expect to spend an additional RM10,000 or more, depending on the number of points you wish to have.

In my case, the process took around a month.
*
I think your is pretty good deal..

1) One lots of 60A three DB c/w :
i) 60A 3p mcb main switch,
ii) 60A 100mA 4p RCCB,
iii) 5ways RYB mcbs,
iv) Metal DB enclosure c/w NE connection tag, fully wired and tested.
Qty :1 lots
RM :2200.00
2)4c25mm2cu pvp submains in pvc casing partly concealed in wall.
(estimate 6m).
Qty :1 lots.
RM :2000.00
3)TNB metering board.
Qty :1 lots.
RM :550.00
Total :RM 47500.00
>TNB submission.
Qty :1 lots
RM:1500.00
Grand Total :6250.00

And also 2.2k for TNB change cable (kaki lima) ... and it tooks 2~3 months plus to complete.