Just pull the 3 phase power first. Doesn't cost a lot to do it while you are renovating. Plus can conceal in the wall.
If you do it later, ask yourself do you want to hack and re paint? Or you ok with it running with a PVC tube on surface without hacking?
EV Car Charging Point, Make sense to prepare the point now?
May 24 2022, 03:09 PM
Quote
0.0134sec
0.36
6 queries
GZIP Disabled