MBSA Renovation Permit, want to just ask estimate cost
|
utellme
|
Oct 16 2021, 03:06 PM
|
|
QUOTE(JasonTheGreat @ Oct 15 2021, 11:08 PM) Want to ask if anyone experienced kena saman by MBSA for reno exceeding anjakan. For example apply for RC Gutter but built GI gutter and thereafter exceed 1 ft from the max wall. Heard it’s 20x which is Rm6000 saman. Will they let you keep the desig after or ask to roboh. More than 80% of the home backyard or kitchen extension at my neighborhood didn't compliant to the mbsa guidelines. For me I will go for RC gutter option with flat roof cover with roof tile on top. In case, there is regularly water disruption in future, I will install addition water tank on the this concrete roof.
|
|
|
|
|
|
utellme
|
Oct 16 2021, 03:14 PM
|
|
QUOTE(dlttdltt @ Oct 16 2021, 10:45 AM) If change floor tiles, change window frame, change front security door and paint the whole house, do we still need to apply for Mbsa permit ? Maybe will also wall between hall and dry kitchen. Unless you do any house extension, I don't think you need permit to repaint your house or repairing wear & tear of your house door and windows. This post has been edited by utellme: Oct 16 2021, 03:17 PM
|
|
|
|
|
|
utellme
|
Oct 16 2021, 03:31 PM
|
|
QUOTE(JasonTheGreat @ Oct 15 2021, 11:08 PM) Want to ask if anyone experienced kena saman by MBSA for reno exceeding anjakan. For example apply for RC Gutter but built GI gutter and thereafter exceed 1 ft from the max wall. Heard it’s 20x which is Rm6000 saman. Will they let you keep the desig after or ask to roboh. Related to the Saman, when I submiting my setara plan last week, the officer asked me why I didn't tambah the bahagian tepi with the new architect plan and he said the fine is based on the buildup area. Example, if I want to extend the side of my house with a new wet kitchen with area size of 33sm then I have to pay Saman 20x (33*7)= RM 4k+
|
|
|
|
|
|
utellme
|
Oct 17 2021, 01:27 AM
|
|
QUOTE(JasonTheGreat @ Oct 16 2021, 08:12 PM) I see that you multiply by 7. How is that calculated? I was told that the plan is rm300. So fine 20x 300 of did not follow Processing fee is RM7 per sqm, minimum processing must not less RM70. But the processing fee setara plan is RM300 for each section. my extension is front section 1st floor and back section ground floor therefore total cost is RM2128. (300+300+648+880). Not sure I can claim back the RM648 after renovation completed because in the receipts, the payment rm648 is called bayaran permit plan bangunan and RM 600 is called bayaran process plan.
|
|
|
|
|
|
utellme
|
Oct 18 2021, 05:59 PM
|
|
QUOTE(JasonTheGreat @ Oct 18 2021, 12:23 PM) Finally submitted my Pelan Setara at MBSA. Forced my self to prepare all the documents yesterday as I expect to be less crowded today due to the public holiday tomorrow. I paid 648 Bayaran Process Pelan, 300 permit pelan rear extension and 880 for tong Roro. Tong roro can claim back if did not utilised. But not sure either for 648. If cannot take back then I made a mistake where i removed my awning installation in this submission. If next time resubmit will be another 648+300 yes, for me, I reached MBSA before 7.45am when I did my plan submission, still there are 2 renovation runner ahead of me and complete my plan submission around 9:30am . For permit collection, appointment time is set from 2:30pm to 4:00pm and reached there 2:20pm and still 4 people ahead of me and finally collected the permit at 3:30pm.
|
|
|
|
|
|
utellme
|
Oct 19 2021, 09:10 PM
|
|
QUOTE(JasonTheGreat @ Oct 19 2021, 09:00 PM) How many days to wait for the approval? From their website it say 1 hr. But after I submit they asked me to go home and wait. Didn't they give you a pink permit collection appointment form after plan submission. I only paid the fee when I collect my permit and its 1 week. For me, submit on 8 Oct and permit collection is 15 Oct. This post has been edited by utellme: Oct 19 2021, 09:11 PM
|
|
|
|
|