How much that will be to install and will the electricity will be cheaper. TS have 4 AC, takut macam overload?
3 phase installation
3 phase installation
|
|
Apr 10 2021, 05:37 PM, updated 5y ago
Return to original view | Post
#1
|
![]() ![]()
Junior Member
64 posts Joined: Nov 2007 |
How much that will be to install and will the electricity will be cheaper. TS have 4 AC, takut macam overload?
|
|
|
|
|
|
Apr 10 2021, 06:01 PM
Return to original view | Post
#2
|
![]() ![]()
Junior Member
64 posts Joined: Nov 2007 |
QUOTE(haturaya @ Apr 10 2021, 05:40 PM) not incl. dryer, 2 x fridge, 2 TV (1 x75 inch TV guy And now another for my son hybrid car... when he at my house. This post has been edited by sdin3269: Apr 10 2021, 06:07 PM |
|
|
Apr 10 2021, 06:05 PM
Return to original view | Post
#3
|
![]() ![]()
Junior Member
64 posts Joined: Nov 2007 |
QUOTE(iZuDeeN @ Apr 10 2021, 06:04 PM) if 3 phase make sure the 4 A/C distributed among the 3 ; not just on single-phase... else its unbalanced.... Noted even 4 ac on single phase no issue.. just make sure its DIRECT to MCB.. not to the existing wall switch/plug ... only use wall switch for 1hp and below... You mean AC direct from MCB? This post has been edited by sdin3269: Apr 10 2021, 06:07 PM |
|
|
Apr 10 2021, 06:26 PM
Return to original view | Post
#4
|
![]() ![]()
Junior Member
64 posts Joined: Nov 2007 |
|
|
|
Apr 10 2021, 07:23 PM
Return to original view | Post
#5
|
![]() ![]()
Junior Member
64 posts Joined: Nov 2007 |
QUOTE(slimey @ Apr 10 2021, 06:32 PM) lel.......as if you on everything at the same time. TNB meter burnt, first the internal MCB then TNB. when mcb trip you know you over load a circuit la My electric appliance Always/ mostly in use 4 AC 2 frigde exaust fan (kitchen when cooking) termo flask ( always on) Microwave ( when cooking) 3 water heater ( shower time only) 2 fish pump 400w (24hrs) 1 x dryer ( day time) 1 x washing machine (day time) 2 x TV (almost 24 hours) 2 Laptops night time 2 spotlights (night motion sensor) Ocassionaly Electric car charger This post has been edited by sdin3269: Apr 10 2021, 09:40 PM |
|
|
Apr 10 2021, 07:23 PM
Return to original view | Post
#6
|
![]() ![]()
Junior Member
64 posts Joined: Nov 2007 |
|
|
|
|
|
|
Apr 10 2021, 08:00 PM
Return to original view | Post
#7
|
![]() ![]()
Junior Member
64 posts Joined: Nov 2007 |
|
|
|
Apr 10 2021, 08:34 PM
Return to original view | Post
#8
|
![]() ![]()
Junior Member
64 posts Joined: Nov 2007 |
QUOTE(yeapsc73 @ Apr 10 2021, 08:17 PM) To change to 3 phase, basically two things need to be done.. So need to pay also item 1)?1) apply to tnb. Tnb then will pull new 3 phase cabling from their source to your house tnb meter, then tnb will change to 3 phase meter. U need to pay some connection charges and additional meter deposit to tnb 2} your own electrical contractor works. Need to change the cable to 3 phase from tnb meter to your house DB box. Need to change the DB box to 3 phase type. Need to reconnect back all the wiring to the new DB box |
|
|
Apr 10 2021, 09:42 PM
Return to original view | IPv6 | Post
#9
|
![]() ![]()
Junior Member
64 posts Joined: Nov 2007 |
|
| Change to: | 0.0135sec
0.66
6 queries
GZIP Disabled
Time is now: 16th December 2025 - 07:21 AM |