Looking on some pointers if I am being overcharged (too much). I am being quoted RM 5,000 for labour and material to replace the piping in my condo (25 year old) with 25mm diameter PPR surface mounting only, with no removal of existing piping.
Condo size is 960 square feet, roughly square, so the dimensions is shorter than my sketch (sketch is half the unit layout, so probably 10 m long by 4.5 m wide in reality).
The quoted works are for entry from water meter (WM) to Master Bath (MBWC) 1 = 4 Point, Middle Bath (MWC) 2 = 4 Point, Dry Kitchen 1 Point, Wet Kitchen 1 Point, Washing Machine (WM) = 1 Point. Layout should be roughly 2 main branches as per sketch, with water meter at bottom left.
Appreciate any thoughts on the matter as soon as possible, thanks.
Cheers
This post has been edited by coldzerotarget: Oct 10 2024, 08:29 PM