QUOTE(ganz @ Jul 26 2007, 10:30 AM)
my apartment has been stop the construction works since march.. almost completed
i've met the developer.. and blaming the MBSA because of the septic tank issue..
they only can resume the work as soon as on jan 08..
is it true..? can i check with MBSA on this matter to double check? or they just put on the blame to MBSA..
my previous topic
http://forum.lowyat.net/topic/437474
I think u can check by provide some details about the project.Off course MBSA have all info,the project suspended or developer got problem.i've met the developer.. and blaming the MBSA because of the septic tank issue..
they only can resume the work as soon as on jan 08..
is it true..? can i check with MBSA on this matter to double check? or they just put on the blame to MBSA..
my previous topic
http://forum.lowyat.net/topic/437474
just my 2 cents.Correct me if i'm wrong.
Aug 4 2007, 01:12 AM

Quote
0.0155sec
0.73
6 queries
GZIP Disabled