QUOTE(zstan @ Jan 17 2020, 08:45 AM)
You are an idiot.
Sabah JKR to manage Pan Borneo Highway project, Contractors, consultants reappointed
Sabah JKR to manage Pan Borneo Highway project, Contractors, consultants reappointed
|
|
Jan 17 2020, 09:16 AM
Return to original view | Post
#1
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
12,267 posts Joined: Oct 2010 |
|
|
|
Jan 17 2020, 09:17 AM
Return to original view | Post
#2
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
12,267 posts Joined: Oct 2010 |
|
|
|
Jan 17 2020, 09:34 AM
Return to original view | Post
#3
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
12,267 posts Joined: Oct 2010 |
QUOTE(lagista @ Jan 17 2020, 09:27 AM) Minister didnt mentioned it, maybe JKR own IR engineers... The prime engineer was making off with the bulk of the fees, while the sub consultants were fed with chicken feed to do their jobs. https://forum.lowyat.net/topic/4846717 ...On progressive payments to the main contractors based on works done, he expects the time taken to be significantly reduced when JKR takes over the project, from the present 80 to 130 days down to about 30 days. https://forum.lowyat.net/topic/4850128 ...the savings from the ongoing cost rationalisation to date is RM1.2 billion JKR will not be carrying out the designs. They will only be supervising the construction, provided they have enough engineers to do that! Or else expect very shoddy jobs! Heck! Even with supervision, road jobs are usually shoddy! |
|
|
Jan 17 2020, 09:55 AM
Return to original view | Post
#4
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
12,267 posts Joined: Oct 2010 |
|
|
|
Jan 17 2020, 01:37 PM
Return to original view | Post
#5
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
12,267 posts Joined: Oct 2010 |
|
| Bump Topic Add ReplyOptions New Topic |
| Change to: | 0.0152sec
0.30
6 queries
GZIP Disabled
Time is now: 26th November 2025 - 08:17 AM |