Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

 Questions in regards to Amansiara II @ Jalan Ipoh, Question on Amansiara II @ Jalan Ipoh

views
     
johnsl
post Nov 14 2007, 08:31 AM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(winkie @ Nov 14 2007, 12:14 AM)
hi everyone, glad to be here with you.
i really appreciate the  the neat information given. Fyi, l bought phase 1 unit. last month, i had to fork out RM390 for the water n electricity registration. so i went to all the way to leadmont office to settle the fee and sign the form. i was quite stunned when informed about the progress was only 20%! just curious, is this a normal procedure coz it doesnt make any sense.
*
hello every one , i just bougth a unit in phase 3. and my mother in-law bought another unit beside me in phase III. I just paid my deposit last week. now waiting for loan to approve.

as for the electricity fee and water, normally when they start to ask you to fill in the form, it shall be about 6-9 month your house is going to be complete. ( base on the experince with my first house), it imposible the progress is only 20%. just for sharing. you can counter check with the letter of demand to your bank about the status

This post has been edited by johnsl: Nov 14 2007, 08:32 AM
johnsl
post Nov 16 2007, 10:30 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(ykyloveu @ Nov 16 2007, 07:38 PM)
around 4K.....
OCBC offers 2 loan packages......one is Zero Moving Cost with Interest BLR-1.75% while the other is Non-Zero Moving Cost with Interest BLR-1.85%.......

The Loan Amount U borrow still the same for either package (My Opinion only...ask someone to verify)
The only different is the percentage of interest......Bank charges U the loan agreement fee so called lawyer fee .....kua.....by imposed a higher percentage (BLR-1.75%) from there, they gain back the lawyer fee + % for such fee.....If U want to pay the lawyer fee by urself, of course they cannot gain from u bcos Ur interest rate is lower (BLR-1.85%)


Added on November 16, 2007, 7:45 pm
Ur package is likely to be Zero Moving Cost......
Ur loan interest is BLR-1.75% for the rest of the years???

My Loan Package is BLR-1.5% (1-3), BLR-1.75% (4-36)......
Yes...My repayment period is extended to 36 years....bcos i applied for graduate loan....
But of course I will pay higher amount to the bank for installment, I applied for 36 years just in case....If anything unforseen thing happened, I need not to struggle for huge amount of money to pay for the housing loan....
*
hi, how do you change the repayment year to 36. bcoz i look at the brochure the loan max is 30 year? cool shocking.gif
johnsl
post Nov 17 2007, 12:31 AM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(ykyloveu @ Nov 16 2007, 11:15 PM)
Most of the loan package is 30 years....U R right.....
OCBC did offer loan package so called "Graduate Loan".....
My OCBC bank loan "runner" told me initially....it can be extended to 40 years...
However, ended up it can only be extended to 36 years....
I think it might be like that.....65 years (Max) - 29 (My age) = 36 years
I think also....40 years should be achieveable if U R 25 years old at the time U apply housing loan and U R a degree graduate....but anyway, U have to check with OCBC.....This is my assumption only...kindly verify Yaaaaa...

I submitted all the documents like usual (photocopies of 3 months consecutive salary slips, bank passbook to prove that U got income in and tally with the salary slip, IC) and also my degree certificate to apply for the graduate loan package....It has been approved recently...

I buy also the life insurance to act as the guarantee for the OCBC. Some ppl can pay for the MRTA (A fix lump sum - only paid once about RM7K) and not the life insurance.......But, I prefer life insurance bcos I dun have any personal insurance yet....just buy one for safe......Life insurance's premium can be paid thru auto debit from credit card or bank account.

My Life insurance is by HLA....Amount insured is RM160K (approximately RM1500 per year)......in case accident / unable to work due to health problem / total permanent disable, the insurance company pay back only RM160K.....or in case of u died due to accident they pay U RM320K (Double the sum insured)......The weak point of this insurance package is the premium that U paid has not interest over the time but cheap for the premium....RM126 per month for my case.....U can check with ur insurance agent whether the life insurance or whatever insurance that u buy can be use as a guarantee for the bank in approving ur loan application.
*
oh i see. thanks alot
johnsl
post Dec 1 2007, 01:47 AM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(swiss_garden_kl @ Nov 30 2007, 11:18 PM)
I am owner of Amansiara Phase 3 . Received a OPTIONAL ELECTRICAL PACKAGE letter from Leadmont with contract cost of RM1,805.Additional Lighting Point (5) , Ceiling Fan Point (4) , 13A Socket Outlet (4) , 15A Socket Outlet For A/C Unit (3) , 15A Water Heater Point (1) and 16A/20A SPN MCB (1). Total additional 18 points. I think it is OK.
I am purchase Lot 232 , level 4 ( Near Tangki Air ) . Very worry about High Tension are too close . Any advise from guys?

The Leadmont sales ppl said that the piling will be started on October 2007 for Phase 3 . But , now is already coming
December...Not yet receive any letter from Leadmont for piling progress..Is it already delay or project is going slow?
*
hi , i am same row with you. Mine is 230 , 1st floor. just got the loan approval. now waiting to sign the spa. I haven receive any quote from the sales person yet regarding the optional electrical package.
johnsl
post Dec 1 2007, 08:21 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(swiss_garden_kl @ Dec 1 2007, 06:54 PM)
Hi , Johnsl . As my one , I get the optional electrical package letter after one month time I sign the SPA. How much you purchase for the Phase 3 , Level 1 , Lot 230 ? I puchased Lot 232 , Level 4 is RM189,880.
*
Is about Rm 185 880.00. Next week plan to sign the SPA. Do you sign the SPA at lawyer office or Show House?
johnsl
post Dec 1 2007, 09:55 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(swiss_garden_kl @ Dec 1 2007, 09:14 PM)
I am signed at show house there . It is more convenient to me due to I lived at Kepong.

You get approval loan from OCBC bank?
*
yes. sweat.gif

i lived in kepong too, aman puri.
johnsl
post Dec 10 2007, 09:40 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(susakthy @ Dec 10 2007, 06:18 PM)
u seem to be very fascinated by the guard house's design!!!  drool.gif


Added on December 10, 2007, 6:20 pm
Can anybody advise me how long they need to get S&P agreement stamped?
*
I just go to the site and sign the S&P last saturday, but the sales agent forgot to inform the lawyer clerk to prepare the document uh vmad.gif damm mad about the agent. Luckly my mom in-law unit she got the S&P.

According to the lawyer clerk, the stamping will takes 14 day
johnsl
post Dec 12 2007, 02:45 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(susakthy @ Dec 11 2007, 09:11 AM)
oic... better to liaise with the law firm directly.  1st inform and 2nd you reconfirm a day before.  i went to the site on sat and signed the snp but can't really remember how many days she told me --- hehehe! txs for the info!


Added on December 11, 2007, 7:57 pm ohmy.gif  To those who took OCBC bank, pls refer to clause 5.3 (pls refer to the excerpt below)

[Notwithstanding anything contained in these terms, any monies withdrawn from the Employee Provident Fund for the payment of the Term Loan shall be deemed as prepayment and not Capital Prepayment and shall not be available for redrawing.]

Are you guys okay with this? I'm disputing this clause because of the reason one would want to take out money from EPF is to pay the capital sum as much as he can, it wouldnt make any difference IF it goes to prepayment. blink.gif
*
I think it does't matter, because the interest calculate daily. if you used Epf for prepayment. The interest will be calculate after the advance payment. correct me if i'm wrong(My odbc sales rep explain in this manner). I saw this clause in my offer letter too.

This post has been edited by johnsl: Dec 12 2007, 02:46 PM
johnsl
post Dec 12 2007, 05:40 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(susakthy @ Dec 12 2007, 04:18 PM)
Tis is wat i understand from the term "Prepayment'---- say your monthly installment is RM900.  You dump in 10k in your account, for the next 10 months, the bank will automatically deduct 900 fm yr account. Whereas "Capital Prepayment" is wen u bank in that 10K it goes to the capital - i believe the monthly installment will be reduced since you're paying up the capital. According to the agent, we can withdraw our money from EPF and choose if we want it to go to prepayment or capital payment but the Letter offer says it should only go to prepayment. 

Johnsl - can you elaborate more on the advance payment.

FYI - my agent is now liasing with their legal department to see if they can change or amend.
*
My experince with ING and Citibank was when i make advance payment, the monthly interest calculations is after my advance payment. And when i continue to pay promptly, the interest again me is less.




Maybe i will check with my agent again to clarify. I only realise this when i read the forum. shocking.gif

i have another loan with ING, but i go through the offer letter. it doesn't have this term.
johnsl
post Feb 12 2008, 12:15 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(samhain @ Feb 6 2008, 11:19 AM)
Thanks alanyuppie! That is great. Nice to hear that

Heard from the agent that Phase III is still in a very initial stage of development. Last week I call the agent and they told me that it is just the "tolak tanah" stage.

Also yesterday, I went to their office and they confirmed it. Very early stages, and the completion dateline is still end of 2009.
*
Welcome Sam, Yesterday i have receive a letter saying that they have complete the piling and demand for another 10%. do you receive that letter ?
johnsl
post Feb 12 2008, 05:04 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(samhain @ Feb 12 2008, 01:11 PM)
Hi John, is this regarding Phase III? I haven't received any letter from them. I went to their office last Tuesday and they told me there is no update yet on the unit.

Yours is Level 1 right? Any other owners of Phase III who have received the progress update letter?

Who else haven't received it yet? Just for "bancian" only  biggrin.gif
*
yes, mine is Phase III Lot 230A. Level 1.
johnsl
post Feb 13 2008, 11:16 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(swiss_garden_kl @ Feb 13 2008, 04:17 PM)
My one is lot 232 level 4 ( phase III ) , I think same row with u. I m not yet receive the letter ( 10 % progress of piling competing ) from developer . But , is it the letter that send to u by developer is Pos Registered Letter? . Because I have received a red noticed card from posman informed that there is a Pos Registered Letter for me since I m not at home . I will collect the letter another few days.

please advise


Added on February 13, 2008, 10:46 pmMy one Lot 232-D Level 4 ( Phase III ) just received progress billing from Wirama Sdn. Bhd about Foundation / Piling Works completed , have to pay another 10%........yeah!!!
May I know is the cheque pay to " WIRAMA SDN. BHD. " ?
*
The Letter i receive is normal pos

Yes 'Wirama Sdn Bhd'


johnsl
post Mar 14 2008, 10:35 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(keiichicol @ Mar 12 2008, 11:55 AM)
Hi amansiarers,

Its been a while I have not participate in this forum. Anyway,I have a question to ask to amansiarers who are currently paying their monthly repayment.

My bank is OCBC and the lawyer had just contacted me last 2 weeks to get my original S&P for the bank to release the $$ to developer.

May I know how long would it takes for me to start my first repayment?

I did asked the clerks of Thean & co, they cant answer that! That's why i need a kind reply from any of you all. 

thanks in advance!
*
I think the bank will sent u a monthly statement, so far for my unit Phase III. I have receive a statement of RM 6.83 for statement, so yet to receive need month statement for the actual sum.

Lately the forum is kind of quite, it is bcoz by the elections! hehe thumbup.gif
johnsl
post Mar 28 2008, 09:53 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(susakthy @ Mar 27 2008, 12:19 PM)
Hello everybody........ the Forum has been very quite lately. 

Any news for Phase III anyone.  I did not receive any bank statement so far?

Oh ya, just to share with you.  I went to view Sin Heap Lee's (SHL) project in Bandar Sungai Long last weekend.  The cheapest unit is selling at 216K, 18X65......can park two cars side by side in front the house and fully tiles.  It's the brick house (English style) Just for you infor lah, if your friends looking for house, you guys can suggest.... but having said that, the area is too clustered lah... tooooo many houses.

Still prefer Aman Siara lah.... hehehe! biggrin.gif

Also, anybody familiar with Selayang area.  Am planning to move in somewhere Aman Siara this Nov, if Phase I ready by them, maybe rent from PhI until PhIII is ready lah... ;o)

NEWS TODAY ---> Selangor to review hillslope projects
All hillslope development projects in Selangor will be reviewed, said its Menteri Besar Tan Sri Khalid Ibrahim yesterday.  Speaking to reporters after chairing the first state executive council meeting, he said exco member Ronnie Liu, who is in charge of local government, has been tasked with finding ways to resolve the problem of hillslope projects.

http://www.theedgedaily.com/cms/content.js...8f1fa0-9a09a99b
*
I'm abit worry wheather the project have any problem, bcoz it is in selangor. sweat.gif

Anybody have pay a visit to the site? is there any progress so far?
johnsl
post Apr 18 2008, 06:02 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(Sidviq @ Apr 18 2008, 05:36 PM)
I will be making next visit to the site tomorrow.  Hope to see more progress.  For those of you intending to go over please be careful as there is a gaping poth hole somewhere along the middle and best if you use a taller vehicle or a 4wd to go there.

If I manage to get some good pics I will let you guys know then for thos who want to see pics of (nothing much to see :-)) could give me your e-mail add and i will send it over.

Have a good weekend Y'oll.

Sidviq
*
That great! hope you can snap some nice pic. My email is : johnng@irc.com.my


thanks
johnsl
post Apr 25 2008, 12:23 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(Sidviq @ Apr 25 2008, 11:20 AM)
Hello Everyone,

I am travelling now and will be back on monday and promise to upload and send the pics then.

Have a great weekend.

Tks.

Sidviq
*
thanks you very much.!!! rclxms.gif
johnsl
post Apr 26 2008, 05:15 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(jumps @ Apr 26 2008, 10:17 AM)
Hi Guys,

Any idea where we can check was there going to be a flyover access from Aman Siara to town?  Or advises which department shall we start with? JKR?

Thank you...
*
Normally i don't think it will be so early, as i have experince in damansara damai. 10 years ago i visit the show room, the sales agent mentions there will be a flyover. I observed the flyover only ready last year. the whole process took them 9 year.
johnsl
post Jul 10 2008, 08:44 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(damin @ Jul 10 2008, 12:58 PM)
i think dat will be permanent. oh God!!

any update for phase 111?now i'm paying interest around Rm1++. others?
*
I'm Phase III 230A, right now i'm servicing the interest of Rm 200.

The Stage is 2b right now rclxub.gif
johnsl
post Sep 20 2008, 08:29 AM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(wkfvenus @ Sep 20 2008, 12:30 AM)
Hi Everybody,

Just got to know about this forum from one of my friend which also bought a unit at phase 1. Of course we are 1 of the owner at phase 1 level 3 (end lot).

Would like to join this big family for any info/idea sharing from now on.

We've received the 2g progress billing (drain work) some where end of July, the next will be road work and vacant possession (which is the happy day for us... )rclxms.gif  rclxms.gif

Is anybody realize that the layout for the end lot is different from others where the kithen is joint with dining area (normal layout is living area joint with dining area). In other words, once you enter yr house , the kicthen will be at yr left hand side while it will be on yr right hand side for end lot (Im not sure abt phase 2 and 3)? In fact we are scratching our heads on how to work out the interior design to make our house looks more spacious. You're welcome to share yr idea if you dun mind.

The other issue is the committed flyover by the developer. So far, phase 1 going to complete estimated end of 2008 or early 2009. I've visited the site 2 weeks ago and no indication on the flyover construction at all. The only things we can see is they have establish a "NICE" U turn at the main road toward to Rawang. Will this be the permanent replacement plan for the developer? rclxub.gif

For those having concern on the common facilities that is not stated in the SPA, a friend of mine told me that we could take legal action on the developer base on their broucher/advertisement during sales launch. There is a success case before. That's why i keep all the broucher with me. But what to worry? We sure have numbers of professional neighbours around us for any advices.

I'll try to bring in more members to this forum and hope that we can setup a strong commitee whenever any major decision need to be discussed and make.

That's all for this time. whistling.gif

Thks and brgds.
*
welcome to the amansiara forum

johnsl
post Oct 3 2008, 02:39 PM

Getting Started
**
Junior Member
57 posts

Joined: Nov 2007


QUOTE(rayman83 @ Oct 1 2008, 07:34 PM)
hi to all amansiara owners,

I been succesfully entered to the phase 1 unit (Level 1) to have a look today and took some pic for the house interior & the fittings.Here is some of my comments :-

1) i dunno wheter u all been informed by the sale rep saying that the tiles for phase 1 will be using 2"x2" or 1 1/2" x 1 1/2"not?b'cos i noticed the actual size used is only 1"x1"
2) the height of the bathroom is very low as what i noticed.the actual bathroom size is very small.
3) as i not enough time to do some proper measurement on the actual size of the units, but i found out the size of the unit is still smaller compare to the sample house units.Even been informed by sale rep the size of the L1 is going bigger than ground floor unit.
4) for the level 1 owners, the L shape at the behind of the unit is still using the teribble and ugly railing which they used for many place as what we noticed before in the pic earlier on.
5) i also noticed only 1 guard house been built up so far,as i know there will be two guard house which one is the main entrance for phase 1,2 & 3 and another is for owners at last row of the phase 1.however is still didn't see any building similar like guardhouse for those lots...coz im lot 161B owner, so i more concern abt my row....[attachmentid=612749][attachmentid=612750][attachmentid=612751][attachmentid=612752][attachmentid=612753][attachmentid=612754][attachmentid=612755][attachmentid=612756][attachmentid=612758][attachmentid=612759][attachmentid=612760][attachmentid=612762][attachmentid=612763][attachmentid=612764][attachmentid=612766][attachmentid=612767][attachmentid=612768][attachmentid=612769]
*
Good job rayman thumbup.gif , i wonder how ur guy enter the place? is the road ready

For phase II/III will it be better, i have told by the sales rep, the bedroom balcony will cover by glass. As it seem in the show room. Hope fully not get cheated. sweat.gif

2 Pages  1 2 >Top