QUOTE(tsohtan @ Mar 2 2009, 11:00 AM)
Hi Everyone,
I think is hard to form a committee and ask some volunteer to lead the team. But a least for those who attended yesterday had made a GOOD start, and especially Phase II, III. Thank you for all attendees....
So For this moment, I think we just use the basis (forum) to discuss problem and share infomartion.
So when there is needed a support from all of you (amansiara owner especially phase 1), please support with 100 and 10 %.
I plan to look for answer from all parties one by one, and update you all if have any answer--> (house loan lawyer, S&P lawyer, MPS, HBA)
These are the problem I faced,
Problems
1. Toilet - Low Ceiling, i think is not fulfill the safety requirement at all, because is only about 6 -7 feet, so if after install the light bulb on ceiling, it's almost reach my head. It's VERY DANGEROUS!!!
2. Maintenance Fees - Not even move in,why should we pay and the facilty is not fully ready.
3. Renovation Deposit - Ask for reduction, cause 3K is too high.
4. VP - Not sure able to claim for LAD after sign the letter, since we're heard it's NOT valid VP.
5. Dustbin - Not sure where to place since most of us have a slope surface.
6. sticker and access card-2 for each unit.
7. car pouch partition -what material (supect made of ceiling board)
So if anyone have the answer just post here and so who ever want to solve know what to do.
I think is hard to form a committee and ask some volunteer to lead the team. But a least for those who attended yesterday had made a GOOD start, and especially Phase II, III. Thank you for all attendees....
So For this moment, I think we just use the basis (forum) to discuss problem and share infomartion.
So when there is needed a support from all of you (amansiara owner especially phase 1), please support with 100 and 10 %.
I plan to look for answer from all parties one by one, and update you all if have any answer--> (house loan lawyer, S&P lawyer, MPS, HBA)
These are the problem I faced,
Problems
1. Toilet - Low Ceiling, i think is not fulfill the safety requirement at all, because is only about 6 -7 feet, so if after install the light bulb on ceiling, it's almost reach my head. It's VERY DANGEROUS!!!
2. Maintenance Fees - Not even move in,why should we pay and the facilty is not fully ready.
3. Renovation Deposit - Ask for reduction, cause 3K is too high.
4. VP - Not sure able to claim for LAD after sign the letter, since we're heard it's NOT valid VP.
5. Dustbin - Not sure where to place since most of us have a slope surface.
6. sticker and access card-2 for each unit.
7. car pouch partition -what material (supect made of ceiling board)
So if anyone have the answer just post here and so who ever want to solve know what to do.