My house VP-ed 2 months ago and I just got my keys last week, but it is missing the TNB meter. Is that correct? Can they give out the keys without the TNB meter?
Is there anything that I can do to get it done faster? Other than chasing them to install the TNB meter faster?
Bloody developer told me need 1 month to install 1 bloody TNB meter, wtf?
Missing TNB Meter
May 29 2019, 05:53 PM, updated 7y ago
Quote
0.0170sec
0.64
5 queries
GZIP Disabled