How much to estimate the full amount of renovation for semi D houses - on current setup of layout (I means current modern structure for internal decoration)
Estimation anyone?
Semi D house renovation, Estimation
Semi D house renovation, Estimation
|
|
Apr 18 2019, 03:31 PM, updated 7y ago
Show posts by this member only | Post
#1
|
![]() ![]()
Junior Member
106 posts Joined: May 2009 From: Penang |
How much to estimate the full amount of renovation for semi D houses - on current setup of layout (I means current modern structure for internal decoration)
Estimation anyone? |
|
|
|
|
|
Apr 18 2019, 03:35 PM
Show posts by this member only | Post
#2
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,420 posts Joined: Nov 2013 |
Do you have any sample decoration photos?
|
|
|
Apr 18 2019, 03:41 PM
Show posts by this member only | Post
#3
|
![]() ![]()
Junior Member
106 posts Joined: May 2009 From: Penang |
|
|
|
Apr 18 2019, 03:42 PM
Show posts by this member only | Post
#4
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,441 posts Joined: Nov 2006 From: I Do Not Know |
4200 soft semi d
my current standing amount is 380k with 1. repaint the interior 2. id built in design for the hall, dry / wet kitchen, guest room, master bedroom and bathroom (this expensive bitch), study room, office, play room 3. rewire the whole house with new lights and add in xiaomi smart switches 4. wiring 5 network points 5. trustee smart alarm system 6. window tinting, security mesh, mosquito netting 7. furniture, tv and etc |
|
|
Apr 18 2019, 03:46 PM
Show posts by this member only | Post
#5
|
![]() ![]()
Junior Member
106 posts Joined: May 2009 From: Penang |
QUOTE(omnimech @ Apr 18 2019, 04:42 PM) 4200 soft semi d 380k kind like too much for memy current standing amount is 380k with 1. repaint the interior 2. id built in design for the hall, dry / wet kitchen, guest room, master bedroom and bathroom (this expensive bitch), study room, office, play room 3. rewire the whole house with new lights and add in xiaomi smart switches 4. wiring 5 network points 5. trustee smart alarm system 6. window tinting, security mesh, mosquito netting 7. furniture, tv and etc For those cable plaster ceiling camera cctv etc I have it done with 60k in total Looking for 2nd batch for interior with another 150k budjet.. 40x90 double semi d |
|
|
Apr 18 2019, 03:58 PM
Show posts by this member only | Post
#6
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
9,336 posts Joined: May 2009 |
Semi D, 3700bu, 4700 land.
Including gazebo outside, allocated 500k, looks like will exceed by around 50~60k atleast. |
|
|
|
|
|
Apr 18 2019, 04:06 PM
Show posts by this member only | Post
#7
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,441 posts Joined: Nov 2006 From: I Do Not Know |
QUOTE(haimirmaya @ Apr 18 2019, 03:46 PM) 380k kind like too much for me Then you may want to get a cheap id to design and you go and project manage your self to control the budgetFor those cable plaster ceiling camera cctv etc I have it done with 60k in total Looking for 2nd batch for interior with another 150k budjet.. 40x90 double semi d the only thing I can say Is that I started out with a budget of 250k add this add that, bim bam alakazam . id probably hit 400k just as I'm about to move in next month. Be mindful, my budget is move in condition, meaning, tv, sound systems and all that stuff is bought as well. beds and fridge, microwave, oven. If you want to do all that in 210k for a semi d, you better reassess your capability This post has been edited by omnimech: Apr 18 2019, 04:07 PM |
|
|
Apr 18 2019, 04:17 PM
Show posts by this member only | Post
#8
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,063 posts Joined: Feb 2019 |
Even my new house already purchased as in "moving in" condition I.e most of the things are done either by developer (air conditioning, bath etc) or the owner (cabinets, lights, curtains, appliances) my budget still 200k for improvements.
|
|
|
Apr 18 2019, 04:43 PM
Show posts by this member only | Post
#9
|
![]() ![]()
Junior Member
106 posts Joined: May 2009 From: Penang |
QUOTE(omnimech @ Apr 18 2019, 05:06 PM) Then you may want to get a cheap id to design and you go and project manage your self to control the budget Im doing my own design with modern conceptthe only thing I can say Is that I started out with a budget of 250k add this add that, bim bam alakazam . id probably hit 400k just as I'm about to move in next month. Be mindful, my budget is move in condition, meaning, tv, sound systems and all that stuff is bought as well. beds and fridge, microwave, oven. If you want to do all that in 210k for a semi d, you better reassess your capability Just using ikea stuff as references. Anyhow, indeed will add more from the initial plan as budjet only capped for 200k. But now.. zoooofff looking to be at 250k |
|
|
Apr 18 2019, 04:43 PM
|
![]() ![]()
Junior Member
106 posts Joined: May 2009 From: Penang |
QUOTE(blancpain4470 @ Apr 18 2019, 05:17 PM) Even my new house already purchased as in "moving in" condition I.e most of the things are done either by developer (air conditioning, bath etc) or the owner (cabinets, lights, curtains, appliances) my budget still 200k for improvements. Yes this is my initial planned and budjet. Looks like not enuf.. |
|
|
Apr 18 2019, 05:43 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,063 posts Joined: Feb 2019 |
QUOTE(haimirmaya @ Apr 18 2019, 04:43 PM) Ya it won't be enough if you are starting mostly new. In my case only the major works are:1. Tile up back area for washing plus glass awning 2. Tinting the whole house 3. Cover third floor airwell with glass awning 4. Changing counter top to quartz stone for wet and wood for dry 5. New sofa. (rest are from existing houses) 6. Selected smart home solutions 7. Change curtains in living room and family area 8. Polish marbles and others and paint interior 9. Wall to wall bookshelf and work area built in table and drawers That's already budgeted for 200k! And I already have everything else done up including -appliances and electronics -other furnitures -lights -bathrooms -bedrooms -water heater, booster - air-conditioning -fans This post has been edited by blancpain4470: Apr 18 2019, 05:44 PM |
|
|
Apr 19 2019, 08:26 AM
Show posts by this member only | IPv6 | Post
#12
|
![]()
Probation
4 posts Joined: Apr 2019 |
QUOTE(haimirmaya @ Apr 18 2019, 03:31 PM) How much to estimate the full amount of renovation for semi D houses - on current setup of layout (I means current modern structure for internal decoration) Dear where is your location? If you are at selangor or KL area you can contact this number 0102926868. He is the one extended with renovations my house. He do my house very well and excellent service. Price are negotiation and reasonable.Estimation anyone? |
|
|
Apr 19 2019, 08:41 AM
|
![]() ![]()
Junior Member
106 posts Joined: May 2009 From: Penang |
QUOTE(Kinowell puchong @ Apr 19 2019, 09:26 AM) Dear where is your location? If you are at selangor or KL area you can contact this number 0102926868. He is the one extended with renovations my house. He do my house very well and excellent service. Price are negotiation and reasonable. Im in SP Kedah.Thats the reason my budjet a bit low compare to you all. |
|
|
Apr 19 2019, 08:52 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,140 posts Joined: Nov 2010 |
QUOTE(haimirmaya @ Apr 19 2019, 08:41 AM) Talk to paskal Chances are he's from there.This post has been edited by halcyon27: Apr 19 2019, 08:59 AM |
|
|
Jun 8 2019, 01:11 AM
Show posts by this member only | IPv6 | Post
#15
|
![]()
Newbie
1 posts Joined: Oct 2017 |
|
|
Topic ClosedOptions
|
| Change to: | 0.0181sec
0.80
5 queries
GZIP Disabled
Time is now: 14th December 2025 - 12:13 PM |