QUOTE(www.Code2all.Com @ Mar 20 2019, 11:34 AM)
1) If this is still under Defect liability period, the complaint need to attention toa) Developer
b) JMB/MC
a) Developer need to arrange the subcontractor to rectify the defect
b) JMB/MC need to arrange the access with the unit floor below/above
Mar 20 2019, 01:03 PM

Quote
0.0168sec
0.45
7 queries
GZIP Disabled