QUOTE(sovietmah @ Jun 17 2024, 04:22 PM)
Hi, I am at subang jaya, i wanted to install solar panel up to 9KW, so I have to change to 3 phases.
Electrician is quoting me Rm5K include helping me to install the 3 phases meter, extend the dbbox, apply tnb which require 2 months waiting max. Rm5k didnt include rm300 connection changes by tnb and didnt include security deposit.
My house is the last house in the section and has 4 tnb cables so electrician said doesn't require tnb to pull new cable from the pole.
Any idea if the price is reasonable?
I have a 12 kWp solar installation running on single phase. No problem. Peak feed is 10 KW +/-, TNB approved. So I would not worry about 9 kWp on a single phase.Electrician is quoting me Rm5K include helping me to install the 3 phases meter, extend the dbbox, apply tnb which require 2 months waiting max. Rm5k didnt include rm300 connection changes by tnb and didnt include security deposit.
My house is the last house in the section and has 4 tnb cables so electrician said doesn't require tnb to pull new cable from the pole.
Any idea if the price is reasonable?