The backyard area almost completed. Just realised two things:
1. The color of the inner roof is silver, almost similar to the tiles. Anyone here thinks it’s too boring? Or looks ok already?
2. It has a water pipe. Thinking of whether i should fix a sink there- marked by circle (for future use in case we cookout outside). The contractor suggested if i want the sink outside, he will hack the liter wall and install pipe inside along the wall and outlet into the drain. Good idea? Picture below:
[attachmentid=9888127]
By the way Angelteoh- apparently i had to buy more tiles, additional of 20 tiles. Reason given is because my area has a step down (sort of drain area) therefore they have to cut the tiles to cover the sides. Also i suspect that the area is actually bigger that quoted 30 ft x 10 ft. Will go and measure tomorrow.
Quite happy with the pictures by contractor. Fingers crossed that the workmanship is good when i inspect for real tomm.
Anyways, work started around 21/22 june, and have already paid 50% of the job. Today contractor asked progress payment 10%- decided to pay as am generally satisfies with the work done.
Arghh? You didn't go see they work? So much trust of your contractor..1. The color of the inner roof is silver, almost similar to the tiles. Anyone here thinks it’s too boring? Or looks ok already?
2. It has a water pipe. Thinking of whether i should fix a sink there- marked by circle (for future use in case we cookout outside). The contractor suggested if i want the sink outside, he will hack the liter wall and install pipe inside along the wall and outlet into the drain. Good idea? Picture below:
[attachmentid=9888127]
By the way Angelteoh- apparently i had to buy more tiles, additional of 20 tiles. Reason given is because my area has a step down (sort of drain area) therefore they have to cut the tiles to cover the sides. Also i suspect that the area is actually bigger that quoted 30 ft x 10 ft. Will go and measure tomorrow.
Quite happy with the pictures by contractor. Fingers crossed that the workmanship is good when i inspect for real tomm.
Anyways, work started around 21/22 june, and have already paid 50% of the job. Today contractor asked progress payment 10%- decided to pay as am generally satisfies with the work done.