The public inspection is scheduled to take place in June or July 2018 for three months, he said.
The MRT Line 3 is aimed to connect and integrate with the existing MRT1 Sungai Buloh-Kajang (SBK) rail line, MRT2 Sungai Buloh-Serdang-Putrajaya (SSP) line which is currently being built as well as other light rail transits and the monorail systems.
This was picked up in the newspaper, still got time to give feedback