QUOTE(Quang1819 @ Aug 8 2017, 07:29 PM)
2 Storey & 3 Storey, 22x75For more info, please read my post #20, #43, #51
Emerald Hills Alam Damai Cheras, Garden Terraces & Lakefront Condos
|
|
Aug 8 2017, 09:29 PM
Return to original view | Post
#21
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
|
|
|
|
|
|
Aug 9 2017, 02:43 PM
Return to original view | Post
#22
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
QUOTE(Palmwalker001 @ Aug 9 2017, 02:16 PM) Based on Google result: Guidelines from Selangor government, PMU need to be at least 12.2 meter away from the nearest building, my goodness it even closer than 20m for single line HTC, PMC lesser risk than HTC? 40 ft is the minimum distance from PMU to boundary of adjacent building. 66ft is the High tension cable reserve, not the setback requirement. Technically HTC could run next to the boundary if there is no setback requirementGuidelines from Manual Garis Panduan Dan Piawaian Perancangan Negeri Selangor BAB 6: INFRASTRUKTUR DAN UTILITI - Jarak dari sempadan lot 12.2 m (40’) - Anjakan daripada Jalan 20 m (66’) [attachmentid=9028361] http://www.jpbdselangor.gov.my/Laporan/Man...DAN_UTILITI.pdf |
|
|
Aug 9 2017, 05:19 PM
Return to original view | Post
#23
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
QUOTE(Palmwalker001 @ Aug 9 2017, 03:18 PM) PMU contains 132KV/33KV transformers, which step down voltage from 132KV to 33KV. PPU then step down voltage from 33KV to 11KV. These PMU and PPU can't be classified as sub-station. Substation is referring to the small 11KV/415V Substations located at housing estates/condo etc. |
|
|
Aug 9 2017, 09:23 PM
Return to original view | Post
#24
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
|
|
|
Aug 9 2017, 09:24 PM
Return to original view | Post
#25
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
|
|
|
Nov 9 2017, 07:12 AM
Return to original view | Post
#26
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
|
|
|
|
|
|
Jan 19 2018, 01:47 PM
Return to original view | Post
#27
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
|
|
|
Mar 11 2018, 01:12 PM
Return to original view | Post
#28
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
QUOTE(Quang1819 @ Mar 11 2018, 12:44 PM) Over 1.5k registered for the landed that only has around 250 units, while the condo is more than 1k units and could barely sell them off (20-30%). The property agent says they will organise a ballet session for terrace houses since there are 1.5K registered. Anyway, I doubt they are able to sell all units as the indicative price of 1.2-1.4 mil is way too high for a 22x75 2-storey terraceCan't blame that they'll play with the price when the demand is crazily high lol By next year if the property market doesn't go down further, they might even raise it higher. Even triple (some say 2.5) storey terrace in Tiara Hill is selling at 2m with no clubhouse and whatsoever. |
|
|
Jun 16 2018, 05:58 AM
Return to original view | IPv6 | Post
#29
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
QUOTE(peacemind80 @ Jun 15 2018, 02:35 AM) [attachmentid=9858694] Doubt this high density project will be approved.Re the project proposed by the Tetuan AmanahRaya....Apart from causing the severe traffic congestion issue. From the map, seems the project proposed by the Tetuan AmanahRaya is planned on the steep hillslope. Destroying the forest and build such a high density project on the steep hillslope is really a madness. It causes severe damage to the environment and putting the surrounding residents' lives at risk. I think the surrounding residents have solid reasons to protest. Right after the PH taking over the Putrajaya. DBKL declared that it has frozen all unapproved projects, including those built on hillslopes and public spaces. https://www.edgeprop.my/content/1330735/dbk...proved-projects hmmm....personally think that if DBKL and PH keeps their promises then there is a chance for such project to be on hold. Lets see how it goes... |
|
|
Jun 27 2018, 01:47 PM
Return to original view | Post
#30
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
QUOTE(Eric589 @ Jun 23 2018, 08:03 PM) Saw the paper too is written “proposed” , and the purpose of the news is to ask public give opinion on this development whether good or bad. Everyone can write in their comment send to DBKL. All projects always started with "Cadangan ................." or "Proposed ............"The project has already been submitted to DBKL Building Department for Development Order approval. As part of the process under "Bantahan" stage, the developer is required to advertise and also put up a notice at the proposed site for public's comments. Any one can give the opinion, but only opinions from land owners at adjacant lots and may be Member of Parliment or people with strong influence will be taken into consideration. |
|
|
Jul 2 2018, 07:08 PM
Return to original view | Post
#31
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
QUOTE(Eric589 @ Jun 28 2018, 04:46 PM) Hmmm, Maybe. But how about the news published on 14 May right after the changed of GOV by DBKL declared that it has frozen all unapproved projects, including those built on hillslopes and public spaces. It is only a temporary freeze, most probably DBKL is waiting for direction from the new government on policy as well as the flow of approving process. DBKL will resume the reviewing process soon after all these are sorted out.https://www.edgeprop.my/content/1330735/dbk...proved-projects If this project is approve then is it something like DBKL slap their own mouth ? |
|
|
Jul 2 2018, 07:16 PM
Return to original view | Post
#32
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
|
|
|
Jul 5 2018, 08:33 PM
Return to original view | IPv6 | Post
#33
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
|
|
|
|
|
|
Jul 21 2018, 07:49 AM
Return to original view | Post
#34
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
|
|
|
Jul 22 2018, 04:49 PM
Return to original view | IPv6 | Post
#35
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
QUOTE(daniel_lyw @ Jun 15 2018, 10:30 AM) even the land itseft of EH is a forest reserved earlier right? wonder how they can give it up to build something? This piece of land was previously part of Desa Cheras held by Metroplex, and Metroplex has obtained the land more than 20 years ago. Previously it should be agriculture land. |
|
|
Jul 22 2018, 04:51 PM
Return to original view | IPv6 | Post
#36
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
|
|
|
Oct 17 2018, 06:35 PM
Return to original view | Post
#37
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
This project together with Pr1ma, Cemera, etc will create havoc to traffic at Alam Damai. Any road upgrading to be carried out by Guocoland?
|
|
|
Oct 23 2018, 07:29 AM
Return to original view | Post
#38
|
![]() ![]() ![]()
Junior Member
484 posts Joined: Sep 2013 |
QUOTE(Quang1819 @ Oct 22 2018, 11:08 PM) Don't think so, as Jalan Alam Damai is the only ingress/egress point to SUKE, traffic conditions at Jalan Alam Damai will be worsen if it is not upgraded. There will be long queues at 3 traffic lights during peak hours. |
| Change to: | 0.0480sec
0.80
7 queries
GZIP Disabled
Time is now: 16th December 2025 - 04:35 PM |