Always the last 10% that will take the longest time in most projects
SUKE highway, Sg. BesiāUlu Klang Elevated Expressway
SUKE highway, Sg. BesiāUlu Klang Elevated Expressway
|
|
Apr 21 2022, 09:38 AM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
89 posts Joined: Nov 2019 |
Always the last 10% that will take the longest time in most projects
|
| Change to: | 0.0169sec
0.48
7 queries
GZIP Disabled
Time is now: 24th December 2025 - 10:44 AM |