http://www.thestar.com.my/news/nation/2017...gvXqvgr1EBfv.99
QUOTE
Liow, who is here with the Prime Minister, said India held the edge in the bid to redevelop the 83km Port Klang-Seremban line.
Under the project estimated at between RM4bil and RM6bil, tracks for freight will be built to bypass KL Sentral, where most of the country’s rail traffic converges to create a bottleneck.
“This will de-congest the heart of the Klang Valley, with cargo going direct to Port Klang.
“We will also halve the KTM Komuter frequency to 3.5 minutes,’’ said Liow, who held talks with India’s Minister of Railways Suresh Prabhu here on Friday.
Under the project estimated at between RM4bil and RM6bil, tracks for freight will be built to bypass KL Sentral, where most of the country’s rail traffic converges to create a bottleneck.
“This will de-congest the heart of the Klang Valley, with cargo going direct to Port Klang.
“We will also halve the KTM Komuter frequency to 3.5 minutes,’’ said Liow, who held talks with India’s Minister of Railways Suresh Prabhu here on Friday.

Apr 5 2017, 08:09 AM, updated 9y ago
Quote
0.0163sec
0.38
6 queries
GZIP Disabled