Guys, here's my situation.
Draftsman has already sent me the drawings, signed and got the commissioner to chop and all.
Recently got a call from an engineer who says that needs his approval as well. I find that strange cos we didn't do anything for 1st floor. All works was for G floor only (extend front and back by 5ft each)
Is the engineer approval legit?
MPSJ CCC
Mar 12 2018, 12:34 PM
Quote
0.0193sec
0.29
7 queries
GZIP Disabled