QUOTE(jimbet1337 @ Jul 3 2017, 06:20 PM)
Pegaga: still EPC bidding SKE vs MMHE-Technip (correct me if i am wrong)K5: not sure
Oil & Gas Careers V11, Upstream & Downstream, Market still slump ahead...
|
|
Jul 4 2017, 10:02 AM
Return to original view | Post
#21
|
![]() ![]()
Junior Member
55 posts Joined: May 2017 |
|
|
|
|
|
|
Jul 4 2017, 05:18 PM
Return to original view | Post
#22
|
![]() ![]()
Junior Member
55 posts Joined: May 2017 |
QUOTE(JimieNeutron @ Jul 4 2017, 12:41 PM) SBM Offshore Awarded Turnkey and Lease and Operate Contracts for the ExxonMobil Liza FPSO will the SBM in Malaysia involve in this project?June 22, 2017 SBM Offshore is pleased to announce that ExxonMobil has formally confirmed the award of contracts for the next phase of the Liza project in Guyana. Under these contracts, SBM Offshore will construct, install, lease and operate a floating production, storage and offloading vessel (FPSO). This follows completion of front-end engineering studies and the final investment decision on the project by ExxonMobil. The Liza field is located in the Stabroek block, which covers almost 27,000 square kilometers, circa 200 kilometers offshore Guyana. Esso Exploration and Production Guyana Limited is the operator and holds a 45 percent interest in the Stabroek block. Hess Guyana Exploration Ltd. holds a 30 percent interest, and CNOOC Nexen Petroleum Guyana Limited holds a 25 percent interest. The FPSO is designed to produce up to 120,000 barrels of oil per day, will have associated gas treatment capacity of circa 170 million cubic feet per day and water injection capacity of circa 200,000 barrels per day. The converted VLCC FPSO will be spread moored in water depth of 1525 meters and will be able to store 1.6 million barrels of crude oil. SBM Offshore CEO Bruno Chabas commented: “We are proud that ExxonMobil awarded SBM Offshore the contracts for the Liza FPSO. The Liza Field offshore Guyana is one of the industry’s largest oil discoveries of the past decade. We look forward to cooperating closely with our client and partners to make this project a success. This award underlines SBM Offshore’s continued focus on building on our experience, our long term relationships and FPSO-led strategic vision.” |
|
|
Jul 4 2017, 05:21 PM
Return to original view | Post
#23
|
![]() ![]()
Junior Member
55 posts Joined: May 2017 |
anyone know our RON95 and RON97 produced currently by PPMSB, HRC(fka Shell FOM) and Petron based on which EURO standard. as far as i know RON95 in Malaysia we still using EURO2 standard, only RON97 EURO4. correct?
|
|
|
Jul 5 2017, 02:39 PM
Return to original view | Post
#24
|
![]() ![]()
Junior Member
55 posts Joined: May 2017 |
|
|
|
Jul 6 2017, 09:18 AM
Return to original view | Post
#25
|
![]() ![]()
Junior Member
55 posts Joined: May 2017 |
QUOTE(JimieNeutron @ Jul 4 2017, 06:41 PM) Currently, from the inside source i heard they have pass the project review stages in netherland HQ. N the project will be brought back to msia execution office. Cheaper workforce and more technical expertise they say. Project kick off plan is on august. i see. one of my friend shared that it was groud-wide work effort, driven ultimately by SBM Schiedam. need to validate this |
|
|
Jul 6 2017, 12:13 PM
Return to original view | Post
#26
|
![]() ![]()
Junior Member
55 posts Joined: May 2017 |
![]() Anyone coming? or Exhibiting? |
|
Topic ClosedOptions
|
| Change to: | 0.0687sec
0.55
7 queries
GZIP Disabled
Time is now: 21st December 2025 - 08:50 PM |