Outline ·
[ Standard ] ·
Linear+
Investment Bandar Rimbayu V5, The Township Nature Perfected
|
botack
|
Sep 13 2021, 02:57 PM
|
|
QUOTE(chainyong @ Sep 13 2021, 12:35 PM) what is your travelling time from canal city to Mutiara Damansara? my wife need to report to work at 7.30am, normally she leaving puchong at 6.55am with F&F speed. if play safe , i will consider Rimbayu Penduline or Perennia, especially Penduline should be more easy to dispose with minimum loss. If Gamuda 257, i worry 20% price drop also hardly to dispose in future. The environment here is awesome, cons is traffic jam and open burning at night time, the traffic might worse in future since more and more units completed, especially after aman 1, EW condo, and Gamuda 257 amber VP roughly 25-35 minutes depending on traffic, I used Elite then NKVE straight to KD. if talking about F&F speed, with no cars on NKVE and Elite, I can reach 250-280kmh from Damansara Toll to BSP Toll. around 15-18minute tops.
|
|
|
|
|
|
botack
|
Sep 14 2021, 10:50 AM
|
|
QUOTE(jeffboon97 @ Sep 13 2021, 09:57 PM) May I know what time you go out?  normal day to day pre-covid around 7AM. That is also pushing it, can reach KD toll in 30-35 minutes, most of the time, heavy traffic but smooth flow, there are stretches where you can further push, even with heavy traffic, you still can cruise around 110-140kmh depending on stretches. covid time, any time also highway no car. lol
|
|
|
|
|
|
botack
|
Sep 14 2021, 10:52 AM
|
|
QUOTE(MeToo @ Sep 14 2021, 01:35 AM) Morning Canal to KK jammed badly. Evening is KK to Canal. I'm glad i work off peak hours... you helicopter come pick you up from home, where got experience traffic jam
|
|
|
|
|
|
botack
|
Sep 14 2021, 10:56 AM
|
|
QUOTE(soulred777 @ Sep 13 2021, 11:03 PM) Perrghhh.. 280kmh. Lambo? 😅 normal sedan car only bro. with no cars around la. midnight can do la pre-covid.
|
|
|
|
|
|
botack
|
Sep 14 2021, 11:35 AM
|
|
QUOTE(chainyong @ Sep 14 2021, 11:33 AM) New township only Canal city is within my acceptance, the amenities and highway access is among the best. GG and Elmina like stay in the middle of nowhere. So, high possibility to go for subsale in Puchong and Usj area. Or in the end, still go for canal city. temasya glenmarie also good area to stay. a lot of subsale here.
|
|
|
|
|
|
botack
|
Sep 14 2021, 03:45 PM
|
|
QUOTE(wong8981 @ Sep 14 2021, 02:28 PM) can go 110 140 still consider heavy traffic meh short burst of speed, then slowdown back again.
|
|
|
|
|
|
botack
|
Sep 15 2021, 12:00 PM
|
|
QUOTE(mingyew @ Sep 15 2021, 09:43 AM) Never heard flood issue. Rimbayu is on higher ground also. penduline and chimes got this issue. the drainage system too small. design issue.
|
|
|
|
|
|
botack
|
Oct 1 2021, 09:36 AM
|
|
QUOTE(8sg9ft @ Sep 29 2021, 07:40 PM) Would be surprising if Livia doesn’t get maxis when all other phases can get Maxis riding on TM’s infrastructure anyway it does not work like that, even though they ride on TM, if TM does not allocate any port to them, then they will not have presence there. Maxis/Celcom still need to buy those ports from TM wholesale. Even if they have presence there, if the ports that were allocated to them have all been used up, then they will say no port available or they will have to go back to TM and buy more ports.
|
|
|
|
|
|
botack
|
Oct 2 2021, 04:54 PM
|
|
QUOTE(8sg9ft @ Oct 1 2021, 01:24 PM) Right. Thanks for clarifying. But how do these ports run out anyway? Shouldn’t the allocation be enough for the number of houses that’s there in the 1st place? for Maxis/Celcom, if TM only allocated let say 10 port each for that area, then they will have a maximum 10 customers each. the rest will go to TM. if TM does not want to sell those ports to you, then customer will have no choice but to stick with TM.
|
|
|
|
|
|
botack
|
Nov 4 2022, 03:03 PM
|
|
QUOTE(jeffboon97 @ Nov 4 2022, 09:45 AM) I believe the other developers are chipping in too. Only the flyover from ELITE To SKVE is done by MPKL. But of course, everything in the end needs to be presented to MPKL to get approval I assume. the flyover is being done by LBS and not MPKL.
|
|
|
|
|
|
botack
|
May 19 2023, 09:43 AM
|
|
QUOTE(Aaron212 @ May 19 2023, 09:27 AM) hopefully we can only pray that they x3 their speed if u want it done by this year by the looks of the current progress, seems like end of 2024.. Elite also now congested, I dont think it will help much if you clear the BSP overhead and roundabout early.
|
|
|
|
|
|
botack
|
Jun 9 2023, 03:42 PM
|
|
QUOTE(Will. I. Am @ Jun 9 2023, 02:47 PM) To make sure not much crack line is depending on the quality of the materials, workmanship and earth work being done. For IJM one, earth work shall be not an issue as they are expert in earth works. Just worry is the material's quality, developer sure will squeeze out profit from their project. Workmanship also 50 50 as usually they will hire sub-contractor to do the building. Since IJM already 10 years, except the first phase of project has major problem, following projects seems like OK. Anyway, something is depending on our luck too.haha ya, first phase major problem comes from earth work problem that IJM is very expert in.
|
|
|
|
|
|
botack
|
Oct 4 2023, 10:45 AM
|
|
QUOTE(dan22_15 @ Oct 3 2023, 07:43 PM) Nola… initial phases ones occupancy generally still low.. I would say like 60-70% max some of them..some roads totally empty maybe like one unit have people stay. I just saw like 6 months ago most all of them except scarlet. Next phases all much better - a lot buy for stay. But I would say this isn’t a bad trend.. usually new places - investors come first.. then those for stay come later. Eventually will be occupied cause those units the location within the township I would say consider better - so someone will buy later. for Chimes, it is about 95% occupancy. only few houses are still empty.
|
|
|
|
|
|
botack
|
Oct 24 2023, 10:11 AM
|
|
QUOTE(Dreamedge @ Oct 23 2023, 07:43 PM) At a point it does not make sense anymore. Today from rimbayu until Kesas… hahaha….. I am still in office, maybe will go home 10pm. yesterday's evening traffic was bad. in and out of Rimbayu with the traffic light at kampung lombong not working was worst.
|
|
|
|
|