QUOTE(lifegoon @ Apr 30 2016, 02:53 PM)
Henge launch at RM480k/1100ft RM436psf
Likeside launch at RM390k/900ft RM433 psf
Not much different isit?
Facilities comparison?
Wats the discount package
for the Henge
For lakeside
Not much different isit?Likeside launch at RM390k/900ft RM433 psf
Not much different isit?
Facilities comparison?
Wats the discount package
for the Henge
For lakeside
At high level view, this project has marginal smaller psf than Henge's first phase.
Henge's first phase was a year ago (+2months?).
In addition, this project has smaller size(smaller size is usually higher psf)
Facilities comparison?
Waiting for more details released...
Wats the discount package
for the Henge?
Pls refer to the link attached in my previous post.
The Henge phase 2 was just "launched".
For lakeside?
Waiting for more details released by Patchay boss
Apr 30 2016, 10:18 PM

Quote
0.0235sec
1.00
6 queries
GZIP Disabled