This type of yellow light interior is good for leaving room?
Attached thumbnail(s)
Quotation VS Interior Design, You ask we answer
Quotation VS Interior Design, You ask we answer
|
Mar 3 2017, 05:36 PM
|
Newbie
2 posts Joined: Mar 2017 |
|
|
|
|
Mar 7 2017, 03:35 PM
|
Junior Member
460 posts Joined: Oct 2015 |
QUOTE(cocopuffs @ Mar 2 2017, 07:59 PM) 3 room also occupy how many people stay in this house ? i suggest study Table put in dining table , between Living Hall and Bedroom 3 can Make it Storage cabinet for store all the stuff . If wan squeeze 1 more store room Living hall or dining hall will look small . Or either can make tatami can be study area and can storage aw well . |
|
Mar 13 2017, 09:05 PM
Show posts by this member only | IPv6 | Post
#323
|
Junior Member
193 posts Joined: Aug 2006 |
|
|
Mar 14 2017, 11:28 PM
|
Junior Member
9 posts Joined: Jan 2016 |
Hi sifu, would like to know do we have to get the wet work done 1st like the concrete table before they build the cabinet? Or they will do the wet work together?
|
|
Mar 15 2017, 11:58 PM
|
Senior Member
1,535 posts Joined: Nov 2008 |
Can you pm me your number?
|
|
Mar 17 2017, 03:48 PM
|
Junior Member
151 posts Joined: Apr 2012 |
|
|
Mar 21 2017, 07:45 PM
|
Junior Member
6 posts Joined: Oct 2013 |
|
|
Mar 22 2017, 03:20 PM
|
Junior Member
242 posts Joined: Jan 2007 |
QUOTE(Feifeikon @ Jan 8 2016, 12:31 PM) any question involve interior furniture , Layout plan , 3D drawing and QUOTATION we can share and discuss here . Can pm me some designs for studio, size 600sqft. Looking to have a one room design. TxBellow the photo we done before for sharing , and will share the photo ya . [attachmentid=5733495][attachmentid=5733496] 5 factor will be effect the cabinets price , i share with u all ya , [attachmentid=5733525] 1st factor is Table top 1)CONCRETE TABLE TOP 2) GRANITE TOP 3) QUART TOP 4) SOLICE SURFACE 5)STAINLESS STELL TOP 6) OTHER-MEICO,POSTFORM [attachmentid=5733539] 2nd factor is inner carcase 1)ALUMINIUM 2) PLYWOOD 3) BLOCK BOARD 4) MELAMINE/CHIPBOARD 5)STAINLESS STELL [attachmentid=5733550] 3rd factor is the Door panel 1)ACRYLIC DOOR 2) GLASS DOOR 3) ALUMINIUM DOOR 4) SOLID WOOD 5) LAMINATE 6) MELAMINE 7) PLYWOOD 8) STAINLESS STELL [attachmentid=5733555] 4th factor is hardware 1)Hinges 2)Braking arm 3)Drawer 4)Basket [attachmentid=5733616] 5th factor time 1)Location 2)Installation day 3)Delivery place lot of people neglect this problem |
|
|
|
Mar 27 2017, 12:42 AM
Show posts by this member only | IPv6 | Post
#329
|
Senior Member
742 posts Joined: May 2006 |
|
|
Mar 28 2017, 10:53 AM
|
Junior Member
435 posts Joined: Oct 2008 From: Cheras |
|
|
Mar 28 2017, 09:13 PM
|
Junior Member
460 posts Joined: Oct 2015 |
QUOTE(chyon @ Mar 14 2017, 11:28 PM) Hi sifu, would like to know do we have to get the wet work done 1st like the concrete table before they build the cabinet? Or they will do the wet work together? yes wet work done after come and install cabinet , but make sure all switch at the correct position ,I suggest before renovation comfirm position appliances stove & hood & sink , if not later will be like this photo ! |
|
Mar 29 2017, 10:49 AM
|
Newbie
2 posts Joined: Mar 2014 |
|
|
Mar 29 2017, 10:57 PM
|
Junior Member
460 posts Joined: Oct 2015 |
QUOTE(Silver Isle @ Mar 27 2017, 12:42 AM) Hi Feifeikon, the price quite ok , this price medium low , are they provide any drawing for you ? can share here Can I get your comment on my following quotation please? Your advice is greatly appreciated! because sometime quotation cant judge , shud judge thier drawing or showroom better . because cabinet can save some wood . |
|
Mar 29 2017, 11:20 PM
|
Senior Member
2,294 posts Joined: Sep 2009 |
can pm contact? tq
|
|
|
|
Apr 4 2017, 10:46 PM
|
Junior Member
460 posts Joined: Oct 2015 |
|
|
Apr 4 2017, 11:44 PM
|
Junior Member
460 posts Joined: Oct 2015 |
|
|
Apr 5 2017, 08:08 AM
|
Senior Member
5,360 posts Joined: Aug 2009 |
Hey boss, where do you based?
I am currently looking for an idea and good ID (with affordable price ) for my 3 storey house. |
|
Apr 5 2017, 12:09 PM
|
Junior Member
366 posts Joined: Dec 2007 |
PM renovation cost for 670sqf condo
-wiring work/lightning -toilet tiles change and water heater tank installation -kitchen cabinet -hack brick that divides out yard from kitchen and even out flooring -glass wall and door and roughly 210cm x 120 cm -master room wardrobe -shoecabinet + TV cabinet budget rm30K |
|
Apr 17 2017, 05:38 PM
Show posts by this member only | IPv6 | Post
#339
|
Junior Member
460 posts Joined: Oct 2015 |
|
|
Apr 17 2017, 05:54 PM
|
Senior Member
502 posts Joined: Apr 2015 |
Planning to renovate my studio 1 bedroom apartment 550sf.
-kitchen cabinet, hood and hob with dining area (dining area probably adjacent to kitchen cabinet) - full height built in wardrobe - storage area in living room for miscellaneous - simple tv cabinet which can also works as additional space PM your design and quotation. tq |
Change to: | 0.0181sec
0.14
6 queries
GZIP Disabled
Time is now: 29th March 2024 - 09:04 AM |