if anyone want to utilize referral fee for sp setia when making your booking, welcome PM
Setia Alam V2, Township project in Shah Alam
Setia Alam V2, Township project in Shah Alam
|
|
Mar 26 2021, 12:21 AM
Return to original view | Post
#61
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
if anyone want to utilize referral fee for sp setia when making your booking, welcome PM
|
|
|
|
|
|
Apr 12 2021, 06:05 PM
Return to original view | Post
#62
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
any decora owners here..?? I figure out how to do the wiring for my mechanical ding dong box .. (as there is 5 wire) which one is L & N.?? How come outside bell switch is comes with house but no indoor ding dong box bell? SP setia call themselves ''master'' developer for a 1 mil. over house even a rm 40 box can't supply its customers.. shameful?!!! more like rubbish developer..poor QC and low quality materials . btw. I still waiting for almost 2.5Yrs for the WARRANTY CLAIM of my 8pc RUSTY DAMAGED DOOR FRAME to be replaced.! for all new buyer thinking to buy house with them. ..I not recommend you regret fro rest life This post has been edited by iphonegizmo: Apr 12 2021, 06:17 PM ryanchia liked this post
|
|
|
Apr 13 2021, 12:18 AM
Return to original view | Post
#63
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(edkhan26 @ Apr 12 2021, 07:04 PM) If its just rusty door frames cant yiy just paint them? very badly damaged internal at back frame rustI renovated my house previously. Door frames rusty. Applied good and new sealer and paint for metal. Problems solved. Dont frust for 2.5 years harmful to health. Move on. This post has been edited by iphonegizmo: Apr 13 2021, 12:19 AM |
|
|
Apr 13 2021, 08:17 PM
Return to original view | Post
#64
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(blibala @ Apr 13 2021, 12:45 PM) If rusty frame can repair, normally developer will just repair and touch up. Don't need to replace whole frame. already repair and touch up few time.. still appear worse.. I post photo..I worked as customer care with a developer before. Some customers demand to change entire floor's floor tiles even with minor scratch on one tile which is ridiculous. But we rejected. Get sp to repair and move on . No developer can give u perfect workmanship. All houses are built by foreign workers as already damaged by ACID as they clean tiles using high acidic solution. one touch metal. Rosak!! think filing a civil case on all 80% door frame.. already like this after 1st month VP This post has been edited by iphonegizmo: Apr 13 2021, 08:38 PM Attached thumbnail(s) |
|
|
Apr 13 2021, 10:43 PM
Return to original view | Post
#65
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(Kenny_kttk @ Apr 13 2021, 10:39 PM) Why it takes so long for your case ? I am decora owner as well and the contractor start to replace my house door frame on 12/4/2021. Expected completion after 1 week. if 4/2021 warranty over.. lel. over 2 yrsI stil chasing every week hammer them for 2 yrs ++ replace to solid wood not metal the frame wood I buy claimed back already 1.5K waiting their contractor rm8k (still pending quotes..) bla bla more excuse to delay I don't care if takes 5 yr or 20 yrs.. I still follow up my std is very high expectation This post has been edited by iphonegizmo: Apr 13 2021, 10:44 PM |
|
|
Apr 13 2021, 10:45 PM
Return to original view | Post
#66
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(iphonegizmo @ Apr 13 2021, 10:43 PM) if 4/2021 warranty over.. lel. over 2 yrs I stil chasing every week hammer them for 2 yrs ++ replace to solid wood not metal the frame wood I buy claimed back already 1.5K waiting their contractor rm8k (still pending quotes..) bla bla more excuse to delay I don't care if takes 5 yr or 20 yrs.. I still follow up my std is very high expectation (don't give uo) |
|
|
|
|
|
Apr 15 2021, 01:06 AM
Return to original view | Post
#67
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
|
|
|
Apr 18 2021, 12:57 PM
Return to original view | Post
#68
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
water patch leak in pipes inside wall now. getting bigger day by day.. after 2 years//
how can repair under warranty omg this house is a headache. ..I never buy another property in Malaysia such poor standard This post has been edited by iphonegizmo: Apr 18 2021, 12:58 PM |
|
|
Apr 18 2021, 11:45 PM
Return to original view | Post
#69
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(garygan @ Apr 18 2021, 10:42 PM) if u dun mind, can i see the pic? tahnks every day bigger & bigger. /..i was told by setia alam staff on this. think he was mentioned your case. by end month if no action by SP staff they have hack entire floor wet wall !!! Once the company owned by a Chinese was force to sell to Malay director. everything management is screw up ..JUST A JOKE. politics can be so dirty and unfair if I complain in Germany about this the people 'mentality' immediately take repairs next day. This post has been edited by iphonegizmo: Apr 18 2021, 11:49 PM Attached thumbnail(s) garygan liked this post
|
|
|
Apr 21 2021, 12:08 AM
Return to original view | Post
#70
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(incredibless @ Apr 20 2021, 10:10 PM) got my key on sat, went to check some defects...well quite a few hollow tiles in the toilet, uneven walls, and minor crack at slab. when you check welcome to new world of ''Headaches..'' you see much do carry a powerful torch light (LED) to slowly check for cracks or any unevenness especially on the wall,ceiling |
|
|
Sep 8 2021, 10:31 PM
Return to original view | Post
#71
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(galkelly @ Sep 8 2021, 03:39 PM) all look small room inside. bad designoutside look nice semi d ..you look sound rich but inside sucksvdesign.. even my inside 3storey terrance end lot masterdom is twice bigger as bathroom in middle house instead facing outside front or back |
|
|
Sep 22 2021, 10:25 PM
Return to original view | Post
#72
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(fash @ Sep 22 2021, 10:32 AM) Same thoughts when i saw it yes right master room have double sink means double size super large take up space away form master room Toilet in both the smaller room is very unnecessary making the room size looks small, even at the MBR Those who bought the Type B, D, F, H is going to cry (at my standard) at how ridiculously small the kitchen is + the hall so master room smaller.. decora design Hall room and bathroom single sink just not too big.(facing side in middle so the master room super long 6.7m x 4 just nice one many interior design sucks so bad / ext soso ..the architecture so bad no wonder our local uni quality suck poor worse is the ''foreigner' about poor workmanship very under control QC later a lot problem defect after 2 years all appear. is a big headache repairs + poor low quality material This post has been edited by iphonegizmo: Sep 22 2021, 10:26 PM |
|
|
Nov 4 2021, 11:32 AM
Return to original view | Post
#73
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
|
|
|
|
|
|
Nov 17 2021, 01:57 PM
Return to original view | Post
#74
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(1TxP @ Nov 16 2021, 11:12 PM) SP Setia? Please think twice. Poor workmanship. After defects rectification even worst. Those people are either sleeping or simply signing off defects without checking. Keep giving excuses in delaying defects rectification. Super poor after sales service. haha I also spsetia buyer I chased for almost 2 yrs _++ every few weeks.. presistancein end 3rd yr decided to fix repairs all my door frame rust and wall pipe water leak |
|
|
Nov 21 2021, 10:05 PM
Return to original view | Post
#75
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
|
|
|
Dec 19 2021, 12:23 AM
Return to original view | Post
#76
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(machoman88 @ Dec 18 2021, 11:14 AM) Heard the flood retention ponds/parks are mitigating the rain water. For Bywater it would be the wetland park and P17 the dragonfly park. Levels are quite high at the moment, if the rain continues the retention ponds might not be able to hold, but right now so far so good. prepare for worse ever,..in 10 yrs ..sea level rise.. klang next to coast line and Shah Alam under water.. next setia then PJ and Subang and rain non stop for a week.. then see we all need speed boat go shopping fishing Bywater become waterhomes This post has been edited by iphonegizmo: Dec 19 2021, 12:24 AM |
|
|
Dec 20 2021, 05:28 PM
Return to original view | Post
#77
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(harrywilsome @ Dec 20 2021, 11:24 AM) under BBR sime darbypoor gov. town planning.. high corrxption learn from the Austrian's they one best flood prevention as long there's a small river or stream connection to main one like in ''Tmn Sri Muda'' then habis. Malaysian good for build more road, tolls tax the poor poorer,, and tunnels. shame!! This post has been edited by iphonegizmo: Dec 20 2021, 05:30 PM |
|
|
Mar 20 2024, 08:07 AM
Return to original view | IPv6 | Post
#78
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
...........
This post has been edited by iphonegizmo: Dec 28 2024, 02:10 PM |
|
|
Mar 27 2024, 07:01 PM
Return to original view | IPv6 | Post
#79
|
![]() ![]() ![]()
Junior Member
321 posts Joined: Oct 2007 |
QUOTE(contagiouseddie @ Mar 27 2024, 01:50 PM) My teacher in the 90s told me their house in Eng Ann also can see the metal dust on the surfaces of their house. well. the entire Selangor & KL is polluted air & noisy ..incl cars fumes ..factory,,shop ,etc.. if want Fresh clean air then beach in jungle away from city town life This post has been edited by iphonegizmo: Mar 27 2024, 07:02 PM |
| Change to: | 0.1290sec
0.26
7 queries
GZIP Disabled
Time is now: 7th December 2025 - 02:23 AM |