Welcome Guest ( Log In | Register )

40 Pages « < 3 4 5 6 7 > » Bottom

Outline · [ Standard ] · Linear+

Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai

views
     
Jagalat
post Oct 13 2015, 10:07 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
Reuse of the deleted posting...

With the latest toll hike inclusive of Duke, do you think Ekovest will have a better cash flow for other projects like EKC?
(Understand there are different accounts)


This post has been edited by Jagalat: Oct 14 2015, 04:31 PM
Jagalat
post Oct 16 2015, 10:34 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(Gary @ Oct 16 2015, 10:00 PM)
Soa signed for 18 months but 2a billing has not even come in yet.
Even if they drawdown from bank....also risky and scary
.....scare abandon
*
Curious has there been any chance your concern been fedback to the developer...
Jagalat
post Oct 17 2015, 02:52 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013


My take on probability of project abandoning is:
1) 10 months ago - high, as almost no difference upon each visit to the site
2) 4 to 5 months ago - medium high as snail pace progress observed
3) this month - medium as significant progress observed for months

The degree of abandoning, to me, is relatively lower than the reading beginning of the year.
I do not totally rule out the probability as continuous monitoring is still required.

I have no internal visibility on their management decision.

Other buyers pls continue to feedback to the developer whenever possible and tekan them to produce periodic update.

One question is if this debut mixed development project is abandoned, how big is the reputation impact towards subsequent projects?
Jagalat
post Oct 17 2015, 02:58 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013

As for the draw down, if I recall correctly from earlier thread, it should happen when the work of the phase is completed.
Based on the progress, BlkJ buyers should get notice earlier compared to others.
Jagalat
post Oct 18 2015, 12:16 AM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(Babizz @ Oct 17 2015, 06:46 PM)
Did they indicate when 2a complete lately? december can?

At this stage n pace if completed its jus how many months or yrs LAD.. actually u cn ask to speak to d technical ppl frm d office u know..

Jagalat kor why no pics ah?

*
Kindly inform if the pictures of previous page is not viewable. : --)

Jagalat
post Oct 18 2015, 01:44 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
A few months back, l was informed by a sub con personal working on the basement.
He indicated that the EKC engineer(s) enforced strict requirements in casting the concrete.
Thorough checking has been conducted by EKC engineer(s). Redo / rework would be imposed if mistake were found.
I have no further details beyond this.
Jagalat
post Oct 18 2015, 04:54 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013

What are all these EKC/EKV labeled barricades doing at the entrence of Tesco Midah?

Earlier l tot the barricades were borrowed for MRT construction.

Now it seems that the land in front of Tesco Midah (facing MRR2) is being cleared.

Construction of the Uturn flyover?

user posted image

Jagalat
post Oct 20 2015, 12:26 AM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(ryan@chua @ Oct 20 2015, 01:13 AM)
How's the site progress,  any photos?
*
The latest photos were taken on 11-Oct, two pages back ....
Jagalat
post Oct 20 2015, 12:37 AM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(8brian4 @ Oct 20 2015, 01:22 AM)
i do pass by this point. saw a piece of green land has been demolish. feel sad after looking at few old trees have been destroy.

wondering our construction company why can't they adopt win-win situation by building u-turn and retain those trees.. sad.gif
*
Was also wondering how this Uturn flyover will be...
Will it allow cars from this flyover to enter Tesco Midah?

Jagalat
post Oct 20 2015, 11:13 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(syarehey @ Oct 20 2015, 05:28 PM)
Dialed this number but it wasnt Joe Wong. wrong number  sweat.gif
*
https://forum.lowyat.net/topic/3235184/+551

I used to call the number back in 2013 and Joe was answering. Perhaps he has changed the number later.

There are two more numbers in the post but they don't always answer.

Best is still walk in to their Sales gallery at Jln Gombak.

Jagalat
post Oct 21 2015, 12:15 AM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(GC 2014 @ Oct 20 2015, 03:28 PM)
are you sure ? i am not that optimistic, at least on par with their initial launching price likely.
*
May l understand your statement "at least on par with their initial launching price likely"....

Do you mean exactly the initial launching price?
Or there is an x% increase from the initial launching price... then can you advise the x value?

Thanks
Jagalat
post Oct 25 2015, 05:11 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
BlkJ...Taken two hrs ago....
Notice a thin layer of "ceiling" forming in progress?
user posted image

This post has been edited by Jagalat: Oct 25 2015, 05:13 PM
Jagalat
post Oct 25 2015, 05:14 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013

BlkJ...Angle from left....Cement floor extending to office site...
user posted image
Jagalat
post Oct 25 2015, 05:16 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
BlkH....Observe more piles compared last picture?
user posted image

Jagalat
post Oct 26 2015, 03:05 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(CMW123 @ Oct 25 2015, 06:48 PM)
Ekovest had a booth at star property fair at TCM

SA still saying date of completion is end 2017

Block E studio fully sold except one at top floor. 821 sf one unsold unit at 7th floor at RM716 psf net

Block H one unsold unit at 19th floor RM768 psf net
*
Thank you for checking on them.
Do they aim to publish the periodic update?
I just checked the Ekocheras.com, seem no update.

Need buyers to consistently checking on them. There is a property fair this coming this week.

Jagalat
post Oct 26 2015, 08:48 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(restful increase @ Oct 26 2015, 09:07 PM)
Ecovest is pushing the sale of their titiwangsa super highrise residential project which is located beside the river of life project.
*
Can see their effort....
https://forum.lowyat.net/topic/2691655/+528

Jagalat
post Oct 29 2015, 04:20 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013


One buyer name spotted....
Described as a proud buyer in the text ..
Mind to reveal your block if you are reading this forum? Thanks

http://www.thestar.com.my/News/Nation/2015...elopers-booths/

:
Another proud buyer was Tai Peck Tee, who purchased a service apartment unit at EkoCheras by Ekovest Bhd.

“This development is in a very convenient part of town, especially as there is a future MRT station right next door,” he said.

“I’m planning on using this unit for investment. My tenants will be able to shop at the upcoming IKEA store in Cheras.”
:
Jagalat
post Oct 31 2015, 11:50 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(luvdog @ Oct 31 2015, 11:19 PM)
I am planning to buy block E. SA says must use their panel banks. A whole list of them...just wondering if there is any advise on which banks have best offer?  Tot best if can get some advise first before I contact them one by one. Thx!
*
A prelim welcome ....
I am using Antbank.
Recently they requested the "Power attorney search" and buyers have to pay...
The background is, after loan agreement signed back in 2013, no draw down has yet been made and they wanna know if borrowers become bankrupt since...so they requested this search .... Leceh....
Wonder if other bank is also requesting this type of search....

Also should you plan to flip after vp, avoid those loans with lock in period..





Jagalat
post Nov 1 2015, 12:47 AM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(luvdog @ Nov 1 2015, 01:20 AM)
Hi Jagalat,

Thx for your advise. Will ask if other banks have this. On resale, I understand that usually this can only be done after Title is under own name, do u know typically when can this be done? After we get key or there are certain holding period (beside the loan lock in)?

Btw, I asked SA regarding the slow progress, SA mentioned due to 3flr basement construction which takes longer but expected completion is end 2017.
*
I did not explore how long it takes for the title reflected owner's name...Need other daikors input

Besides lock in and the above scenario, watch out for rpgt if you plan not to use the life time exemption.


Jagalat
post Nov 2 2015, 04:03 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(CMW123 @ Nov 2 2015, 03:50 PM)
Ekovest MD sent us letter last time said there will be a newsletter sent to their customers in Oct and will have news on the progress of all their projects. Did anyone receive the newsletter?
*
Me belum terima lagi....
Anyone ckecked out their booth during the weekend?

40 Pages « < 3 4 5 6 7 > » Top
 

Change to:
| Lo-Fi Version
0.0258sec    0.38    7 queries    GZIP Disabled
Time is now: 10th December 2025 - 08:33 AM