Welcome Guest ( Log In | Register )

5 Pages  1 2 3 > » Bottom

Outline · [ Standard ] · Linear+

> Bandar Bukit Raja ver 2

views
     
TSachongs
post Jun 22 2015, 12:52 PM, updated 8y ago

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
https://forum.lowyat.net/topic/1604810

Come2.. talk here
TSachongs
post Jun 24 2015, 11:46 AM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
nice photo.. once nafiri completed, goal post will be removed.
TSachongs
post Jun 24 2015, 12:56 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(cclay @ Jun 24 2015, 12:35 PM)
U Nafiri owner too?
Yeah, now is to prevent lorry / truck from further damaging the road..
One more year to VP, actually cant wait.. ;p
*
yes.. i am also nafiri 1 owner 😀.. (BBR collector)
eager to see the lake.. SD said they will construct the lake for jogging area. nafiri finishing really nice.

you buy for own stay or investment?

This post has been edited by achongs: Jun 24 2015, 12:57 PM
TSachongs
post Jun 24 2015, 01:10 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(cclay @ Jun 24 2015, 01:04 PM)
Collector... Then must have few units in BBR ady.

Nafiri 2, for own stay. Hope they can make it G&G..

The shoplots, shud b fenced from Nafiri right?
*
yes.. got a few unit..
hopefully this place can be G&G. the fence can follow fuego concept.. how they fencing fuego and shop.

i dont mind if need to pay extra 😅. anyway safety first.
TSachongs
post Jun 24 2015, 01:22 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(cclay @ Jun 24 2015, 01:14 PM)
Great, you can switch environment/unit few times a week..
Hehe..

Yeah, safety shud come first. Imagine the loss if there was theft/burglary.. sad.gif
*
between our house alarm have a provision to be connected to sms and central system to alert police.
later during handover, we must get this detail from SD.

i just know it, during my visit to nafiri last 2 months. got house alarm engineer testing the alarm. have some chit chat with him.

got panic button some more in one of bedroom.



Attached thumbnail(s)
Attached Image
TSachongs
post Jun 25 2015, 08:00 AM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(fyruzs86 @ Jun 25 2015, 07:29 AM)
Bukak puasa at rumah baru..yeay
*
so fast ker 😛??!
byk cepat pindah
TSachongs
post Jun 25 2015, 08:11 AM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(zackdanial @ Jun 25 2015, 07:05 AM)
Tomorrow big day for me . Going to collect the keys at SD .
Any request ?
*
1.do not forget to test water leakage and water proofing in bathroom.
just open the water pipe, let water flow for about more than 30 minute.
then check whether there is water leakage through ceiling beam or wall.

2.also open water pipe at every sink including kitchen sink. then check whether got leakage or not at the bottom.

3.press the toilet water, and check whether got water leakage or not

4. please also ask the main contractor what type of piling their use for this house. if they say they use bakau piling, u can also applied the same method for your future house extension.

good luck bro. belanja teh tarik laa.. sudah bg banyak tips ni
TSachongs
post Jun 25 2015, 08:40 AM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(zackdanial @ Jun 25 2015, 08:25 AM)
hehehe . can stay there if got second wife . working at KLCC area , travel time will make me much older . Installment need to pay starting July . so no second wife must rent out lor
*
hi .. i'm also working near to klcc area (walking distance) .. between, where do you work bro?
TSachongs
post Jun 25 2015, 12:23 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(Redhotchili @ Jun 25 2015, 11:35 AM)
this is sime darby project?
*
yes
TSachongs
post Jun 25 2015, 09:13 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(c.l @ Jun 25 2015, 08:42 PM)
Paloma Residents here? any news for the progress? it pending for few months already.
*
yes.. i'm again.. since i'm the BBR collector.. deeply regret that the fence project is cancel..😟😟😢
delmara resident not agree..
now the paloma resident may proceed with guard house, boom gate and cctv only. will let u know once they have conclude. 😔😔😭
TSachongs
post Jun 26 2015, 07:28 AM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(Brainy_Panda @ Jun 25 2015, 11:42 PM)
Delmara ?? Those 2.5 story fella why don't want ??
*
Delmara got Hang Tuah inside their house.. easy to tapau any burglary break-in into their house..
S*IT... vmad.gif
Delmara Resident: 11 house not agree against 10 house agree (WTF)

Now the paloma resident planning to make guard house, CCTV and boom gate but yet to concluded. What ever they agreement, I just agree and pay.. better than nothing
cry.gif

This post has been edited by achongs: Jun 26 2015, 07:33 AM
TSachongs
post Jun 26 2015, 06:17 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(zackdanial @ Jun 26 2015, 05:58 PM)
i think 20*55 (build up ) land size 20*70 (if not mistaken )
*
i think 1300sqft

TSachongs
post Jun 26 2015, 06:23 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
Sd initially want to sell safron rm400k but during Najib visit to BBR, he ask them to lower some more.. and finally sell to rm388k..
TSachongs
post Jun 26 2015, 06:40 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(cclay @ Jun 26 2015, 06:32 PM)
1300 sqf seems small.. Too many empty space behind..
*
later got money, kasi tambah loorr
TSachongs
post Jun 28 2015, 11:21 AM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(c.l @ Jun 28 2015, 10:57 AM)
since not doing fencing but will delmara resident pay for it for build other facilities - cctv, guard house? and since fencing is call off, then contribution amount will be lesser?
without fencing, is accessible from lake, behind and so on, what will be the next option?

and since you are the collector, just to suggest possible to create a fb group (close group) page for all residents update and news? and resident can share info there as well.

is that possible fencing on entire lake?
those 11 house not agree i believe is those facing lake, as they need good view on it.
*
I'm not sure laa... since i'm yet to move in to my paloma house (currently stay on another unit in BBR). i'm not the active member in paloma comitee. i just a follower. i get the news from mrs lee through wasap.she lives coner house jalan 1b near delmara. what ever they want, i just show my support since we have elected them as delmara & paloma comitee member.
the resident got wasap group but they did not add me due to limited number of wasap group.
i will pm you mrs lee hp number for your further actions. 😅

TSachongs
post Jun 30 2015, 01:45 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(DK30 @ Jun 30 2015, 01:31 PM)
Mine is Nafiri 1 and the billing is now up to 45% (item 1 - 2c).
*
thanks 😄
TSachongs
post Jul 1 2015, 09:31 AM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(pkypky @ Jul 1 2015, 09:26 AM)
new updates, the renovation can do for Saron. Previously maybe wrong communication by MPK and given wrong information. today check with MPK can do the renovation. for ground floor, you all can buy the ready plan from MPK, for 2nd level renovation, you all need to appoint architect to draw plan.

The SnP didnt indicated for term of cannot renovation, even the sales gallery bbr given wrong info of cannot renovation. haiz....
rclxub.gif
*
untung laaa 😍
TSachongs
post Jul 1 2015, 10:13 AM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(Maggie_Freedom @ Jul 1 2015, 09:43 AM)
Dear, thank you so much for your infor. Such a great news in early morning ! thank you thank you.
Anyone plan to do extension at back house ? How much ar ?
*
1) do not forget to piling ur house extension foundation. use the same method as existing. ask SD. i suspect may be piling bakau will be use
2) in 2011, my house extension project is rm100 persq feet (complete with marble + concrete ceiling)
TSachongs
post Jul 1 2015, 10:52 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(cclay @ Jul 1 2015, 10:28 PM)
Lol, KimiLau.. Trying to increase ur postings?
*
hahhahaha.... what the fish
TSachongs
post Jul 2 2015, 06:05 PM

Getting Started
**
Junior Member
271 posts

Joined: Apr 2011
QUOTE(caviars @ Jul 2 2015, 05:28 PM)
Got few quotation from nearby shops/seller around Setia Alam/BBR. For mild steel, powder coat, simple single bar design (cheapest) the pricing is from RM11.50 to RM 12 for window. For door it is between RM 16.50 to RM18

Total cost varies depending whether you want to put grill on kitchen window and door (option A) or choose to grill the whole tiled yard area (washing machine area, option B). Option A is cheaper

Estimated total area and cost for option A
- Door - 106 sqf x 17 = RM1802
- Window 121 sqf x 12 = RM 1452
- Total around RM 3.5K with GST

Estimated total area and cost for option B
- Doors 85 sqf x 17 = RM1445
- Window 105 sqf x 12= RM1260
- Yard grill 75 sqf x 17 = RM 1275
- Total around 4.3K with GST

There is also additional cost for plating (RM 80-100) and grill handle (RM 100-RM120).

Please take note that these are calculated cost. Vendor may give extra discount or add extra charges. Please share if you get any other quotation (hopefully cheaper).
*


should ask for oven baked


5 Pages  1 2 3 > » Top
 

Change to:
| Lo-Fi Version
0.0556sec    0.67    7 queries    GZIP Disabled
Time is now: 29th March 2024 - 01:48 PM