QUOTE(darkofdragon @ Jul 30 2019, 10:51 PM)
Investment LAVILE KUALA LUMPUR, The changing landscape of Maluri
Investment LAVILE KUALA LUMPUR, The changing landscape of Maluri
|
|
Aug 6 2019, 12:40 PM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
|
|
|
|
|
|
Aug 6 2019, 12:47 PM
Return to original view | Post
#2
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
I bought Lavile, because:
1. it is FREEHOLD. 2. AEON Cheras is just right beside. 3. MRT is very near & link to AEON. |
|
|
Sep 4 2019, 02:51 PM
Return to original view | Post
#3
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
|
|
|
Sep 4 2019, 03:21 PM
Return to original view | Post
#4
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
|
|
|
Sep 4 2019, 03:49 PM
Return to original view | Post
#5
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(tungsh2 @ Sep 4 2019, 03:21 PM) MACC urged to probe on approval for condominium project on reserve landhttps://sme.com.my/2018/09/15/macc-urged-to...n-reserve-land/ http://www.bernama.com/en/news.php?id=1642668 |
|
|
Sep 5 2019, 09:01 AM
Return to original view | Post
#6
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
|
|
|
|
|
|
Sep 5 2019, 10:02 AM
Return to original view | Post
#7
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(LoTek @ Sep 5 2019, 09:21 AM) if you visit the site you will notice that mira already has begun, the development boards and hoardings are up. I hv always passed by the site every week to view the progress of Lavile. I saw Mira hoarding completed long time ago (may be 1 year), and now the gate door was closed & some machinery was stored inside, but never see any construction activities. |
|
|
Sep 18 2019, 12:37 PM
Return to original view | Post
#8
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
|
|
|
Sep 24 2019, 11:53 AM
Return to original view | Post
#9
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(Chrystal123 @ Sep 18 2019, 03:48 PM) I also bought one ard $868psf (yr 2017). Partial furnish.i prefer Lavile coz the location and concept good. If give me another chance,i still stick back Lavile instead Mira.Mira too tiny land and carpark will be big issue.facilities cant expect much. Your unit is located on which block? |
|
|
Sep 25 2019, 04:44 PM
Return to original view | Post
#10
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(Chrystal123 @ Sep 25 2019, 12:48 PM) Thanks for the info.i have view few property before but so far this location and concept is the best. Anytime free can go down for starbuck.No need car can take MRT out. Sad things is only no good view.other all ok. 😅 Agreed, good location. The convenience will offset the view.By the way, u can go to the sky garden for good view. |
|
|
Sep 26 2019, 10:43 AM
Return to original view | Post
#11
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
|
|
|
Sep 26 2019, 12:11 PM
Return to original view | Post
#12
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(deadravel @ Sep 26 2019, 11:29 AM) I don't think SV2 will block the view of KLCC & TRX, but KL Tower not so sure, may be at the most right corner of Lavile can see it.Attached File(s)
Lavile_view.pdf ( 154.79k )
Number of downloads: 324 |
|
|
Sep 27 2019, 08:10 AM
Return to original view | Post
#13
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(deadravel @ Sep 26 2019, 06:01 PM) It is not necessary to own the unit facing KLCC to enjoy the view 24 hrs, now I stay in city centre that I can view KLCC, KL Tower, TRX & KL 118, but after long time I feel nothing special to view it.If nothing blocked by future development, the 9th floor (facilities) also can have the view. |
|
|
|
|
|
Sep 28 2019, 12:03 PM
Return to original view | Post
#14
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
|
|
|
Sep 28 2019, 12:03 PM
Return to original view | Post
#15
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
|
|
|
Oct 7 2019, 10:12 AM
Return to original view | Post
#16
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(Chrystal123 @ Sep 27 2019, 05:27 PM) Ya i aware that.the agent did explain to me coz of foreigner rules threshold >$1m.hence they come out different package which local not entitle.eg:GRR rate(Guaranteed rental return) ,fully furnish,2 carpark lot. I am local so non my business.Part of the KLCC unit still reserve for local during initial launch. your unit is on which floor? |
|
|
Oct 7 2019, 01:37 PM
Return to original view | Post
#17
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
|
|
|
Oct 8 2019, 12:36 PM
Return to original view | Post
#18
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(DesRed @ Oct 8 2019, 09:43 AM) Since DBKL can't even pony up the funds to buy back the land from PV, what more can be done? protest again .... controversy right? ...... risky to dump money to controversial project?Case closed and the project can proceed without any hindrance. Maybe those same folks who previously protested it will protest again, but it'll just be futile or symbolic at best. Nope. More than RM 9xx/sf from my last visit there for the remaining Block A and B units. |
|
|
Oct 14 2019, 11:10 AM
Return to original view | Post
#19
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(DesRed @ Oct 12 2019, 10:18 AM) Just let them protest. They also can't do much since DBKL couldn't pony up the cash to buy back that land. aiyo, like that rely on luck ...... very risky ohAnd besides, the initial protest was only covered by Utusan (thanks to LiNKInPaRk108 for the news link). The other mainstream press overlooked it, so highly unlikely that it will get the same free publicity like Malton's Bukit Kiara project. |
|
|
Oct 24 2019, 10:18 AM
Return to original view | Post
#20
|
![]() ![]()
Junior Member
54 posts Joined: Aug 2019 |
QUOTE(poilamixus @ Oct 20 2019, 02:12 PM) Heard that PV MIRA gonna launch in November. make sense👍Two versions: 1. Launch as per usual. Even you file to court, if the construction hits 2C/2D, you cant do anything. 2. Do piling in order to claim more compensation from DBKL. You are the one who gives me permission to build, and now you need to pay me back if you want to stop me. |
| Change to: | 0.0210sec
1.07
7 queries
GZIP Disabled
Time is now: 20th December 2025 - 05:54 PM |