QUOTE(yinchet @ Mar 12 2015, 01:47 PM)
Hi just come back from a very busy schedule.
sigh too much project on hand.
anyway I did some reading on previous post.
some ask y not using meko design instead of using dsme.
well it were due to boustead unable to do 2major project at the same time.
As it was expected mica were selected.
well sgpv were design to be light frigates so dun expect much about it.
On the cost and price tags not much we can do on its as some of the money went into upgrading the boustead facilities.
For future upgrade it can utilize the buffer space to install essm or any other long range SAM capability.
as for camm if the development have completed during the announcement back in 2010 it might have been selected instead of mica.
For mmrca I still think we will be better off select gripen leasing option.
no agree .....sigh too much project on hand.
anyway I did some reading on previous post.
some ask y not using meko design instead of using dsme.
well it were due to boustead unable to do 2major project at the same time.
As it was expected mica were selected.
well sgpv were design to be light frigates so dun expect much about it.
On the cost and price tags not much we can do on its as some of the money went into upgrading the boustead facilities.
For future upgrade it can utilize the buffer space to install essm or any other long range SAM capability.
as for camm if the development have completed during the announcement back in 2010 it might have been selected instead of mica.
For mmrca I still think we will be better off select gripen leasing option.
NMEL can partner with boustead to built corvette.... i means NMEL can built meko class too, just need cooperation with boustead.
will 2010 just tender for sgpv,decision on 2012 and that time sam/asm not decided yet. final design also not done. than both Mica and camm is using same vls,using mica/camm not the issue, event until 2014 not yet decide sam/asm, so nothink related with camm development, it can order on 2013
only different is camm if quadpack means need more unit need to order than higher procurement cost.
This post has been edited by waja2000: Mar 12 2015, 02:10 PM
Mar 12 2015, 02:07 PM

Quote


0.0539sec
0.54
7 queries
GZIP Disabled