Outline ·
[ Standard ] ·
Linear+
House Renovation - Approval Plan, Local Authorities - DBKL/MBSA/MPSJ.. etc
|
orensoft
|
Mar 8 2017, 04:14 PM
|
New Member
|
hi all,
Received letter from MPKJ mention that renovation didnt follow the plan and MPKJ now asking to provide as built drawing by architect
Please advise if have other way to get this sorted out?
thx
|
|
|
|
|
|
orensoft
|
Mar 8 2017, 05:34 PM
|
New Member
|
QUOTE(spreeeee @ Mar 8 2017, 05:14 PM) do u have the drawing then? Didn't have the drawing coz contractor just use standard drawing from MPKJ ...
|
|
|
|
|
|
orensoft
|
Mar 9 2017, 10:10 AM
|
New Member
|
QUOTE(spreeeee @ Mar 8 2017, 05:41 PM) means is normal roof.. not the concrete slab? normal roof no need drawing.. why they request for it? Its normal roof ... not sure why suddenly MPKJ mention didnt follow the plan ... haven't go meet up them face to face yet... Just wonder if it necessary for prepare as built drawing?
|
|
|
|
|
|
orensoft
|
Mar 9 2017, 11:41 AM
|
New Member
|
QUOTE(spreeeee @ Mar 9 2017, 10:25 AM) Don't think you need, just prepare photo before and after. Noted ... will meet them to see how to solve this Just in case, if they insist to have a as built drawing... how much its cost?
|
|
|
|
|
|
orensoft
|
Mar 9 2017, 01:56 PM
|
New Member
|
QUOTE(spreeeee @ Mar 9 2017, 11:49 AM) a valid drawing would need architect stamping/sign, cost depends on the extension, prices may vary and it may cost from rm500-thousands.. if the normal roof initially doesn't need any drawing, i will not even bother to provide drawing to them.. if u were right, u don't even need to scare of them, right? Not scare of them but they're local govt end ... always on winning site
|
|
|
|
|