QUOTE(jychook @ May 12 2020, 11:08 PM)
No you will not get approval for two entrances if you were to submit for approval for a corner unit. Because local authorities only allow 1 main entrance.
Hi, can pm me your contact? ThanksHouse Renovation - Approval Plan, Local Authorities - DBKL/MBSA/MPSJ.. etc
|
|
May 14 2020, 11:26 AM
Return to original view | Post
#1
|
![]() ![]() ![]()
Junior Member
426 posts Joined: Jun 2008 |
|
|
|
May 10 2022, 02:09 PM
Return to original view | Post
#2
|
![]() ![]() ![]()
Junior Member
426 posts Joined: Jun 2008 |
QUOTE(StupidGuyPlayComp @ May 10 2022, 10:41 AM) Actually, most of the house owners did the same includng me. DBKL has a lot of guidelines. E.g. for the autogate, in the submission, the drawing must show the gates fold inwards to the boundary. But, this is not practical. So, most of us have autogate folding outwards despite this is not the case on paper. I have a separate forecourt for shoes cabinet. However, it is 2 feet away from my boundary. Based on DBKL's guideline, this is not allowed. A distance of 10 ft is minimum. So, I submit the drawing without this forecourt. After obtaining CCC, I will build this forecourt. The key thing is to ensure those major wet work, e.g. building with columns, beams, footing, and etc - all must have the approval from DBKL. That was what I have been told. |
| Change to: | 0.0153sec
0.46
7 queries
GZIP Disabled
Time is now: 25th November 2025 - 02:27 AM |