House Renovation - Approval Plan, Local Authorities - DBKL/MBSA/MPSJ.. etc
|
ongLAI
|
Aug 7 2019, 03:54 AM
|
Getting Started

|
Hello,
My house kitchen extension just done 2 years ago. I had a main con and my house details are as following. Question, do I need to keep the extension approval from MBPJ? My main con did not pass back the extension plan to me and as usual after renovation all the main con will not answer your call anymore regardless how many times u call him. I am asking this because I recently had a discussion with my fren about selling property and this bring to my attention. If I need to maintain a plan in order to sell, what should i do now? (Assume main con lost/trash it) I do not want to come back 10-15 years later cracking my head with documentation whenever I want to sell my house as I won’t be able to remember anything after so long.
House floor plan - 22x75 Terrace house 2.5 storey 5/6 ft kitchen extension at the back Property at PJ
|
|
|
|
|
|
ongLAI
|
Aug 8 2019, 11:05 PM
|
Getting Started

|
QUOTE(jychook @ Aug 8 2019, 04:50 PM) Hi, You don't need a plan/drawings to sell your property. it will be handy if you have the drawings as per the existing house condition for the future buyer should you sell it in the future. Most of the time it is a bonus for you if you have the drawings of your house as built. It wont cause any problem for the future extension because the architect will do some measure drawings if they don't have the existing house Building Plan. However the issue here is the CCC. If you follow the law, ( yes i mean the law) all building works including renovation and extension also need a CCC (certificate of compliance and completion) to be issued by an architect when the construction is completed. Your extension was only 5/6 feet extension at the kitchen, I dont think it will be a problem unless some haters go report you. So in case you are doing any future construction project, do remember that a CCC is a must to be issued by the architect when the construction is completed. Thanks Thanks for you reply, I don’t think my main con will submit the CCC for me. Usually how can I perform the CCC? Should I do it now and normally how much it cost?
|
|
|
|
|