QUOTE(echoesian @ Sep 19 2016, 01:04 AM)
I'm actually planning to extend my backyard also but what is the allowable minimum space required between the back wall and the back fence for a Semi-D?
*
If there is no lorong behind the house then you'll need a setback of 5ft from the boundary.
adrianjc
post Nov 24 2016, 04:00 AM

Enthusiast
*****
Senior Member
898 posts

Joined: Jul 2011


QUOTE(iron-boy @ Oct 19 2016, 10:25 PM)
hi,

i have a question i hope you can help me out. i was planning to extend my kitchen; extra 5 feet. and i have engaged with 1 of the architect from the mpaj. i realised he had drew the window smaller than what i told him and is not at the right location (i wanted it to be at the middle instead of 1 sided). now is it fine to do reno with slight different from plan (just changing to bigger window)? would i be inviting trouble with mpaj if they come to check? or should i just ask the architect to redraw (i assume there willbe new charges)?
thanks..
*
Slight difference in window size and placement should not be an issue and won't need you to resubmit.

adrianjc
post Apr 20 2017, 10:28 AM

Enthusiast
*****
Senior Member
898 posts

Joined: Jul 2011


QUOTE(dotaallstarz @ Apr 17 2017, 11:52 AM)
Hi Guys... i am staying in puchong. and recently i got a letter from mpsj.

Which says between now till end August.. there is a special initiative to encourage owners who did not submit renovation plan to do so and the penalty will be reduce to rm500.

Any one have any recommendation for contractor / architect for recommend? i understand that we will need to use the authorized approve contractor by mpsj for this.

i was told that we will need to submit the RC plan (engineering plan) and also the architect plan. is that correct?

Am new to this.
*
Really depends on what was the renovation that was done. If it was an extensive one with extensions or change of internal floor plans, wiring, water and sewage pipings then you would need to submit.

One way to get someone to help you with the process is to go to MPSJ and ask them to recommend someone from their panel. They would be more familiar with the processes.

 