QUOTE(haikalraihan @ Apr 13 2015, 11:13 AM)
Sorry to not answer all your PM.quite busy lately.
There are some popular questions into my inbox.
Q : What is building setback?
A : Building setback is maximum extension allowed by the Local Authorities
Q : How long the approval will be obtained?
A : 1-2 weeks depends on Local Authorities
Q : Can house owner use their own Tong Roro?
A : Yes & No. For DBKL & MBSA area, house owner needs to use their registered contractor but MBPJ, house owner can use their own Tong
Q : How much is the penalty to be imposed if renovation started without permit / approval?
A : 10-20x from processing fees. Example; Processing fees : RM500, Penalty : RM500x20 = RM10k
Q : What are the difference between Standard Book & Architectural Plan?
A : Standard Book only for basic extension without flat roof.
Q : Internal renovation also needs approval plan?
A : Yes if there are new internal structure (brick wall / beam)
Q : Awning installation does require a permit?
A : No
Q : What is CCC?
A : CCC is Certificate of Completion and Compliance
Q : Can house owner add more floor for intermediate terrace link house?
A: Yes can
Sharing is caring…
Should include this in ur first post, imho. Edit ur first post and update it with this faq There are some popular questions into my inbox.
Q : What is building setback?
A : Building setback is maximum extension allowed by the Local Authorities
Q : How long the approval will be obtained?
A : 1-2 weeks depends on Local Authorities
Q : Can house owner use their own Tong Roro?
A : Yes & No. For DBKL & MBSA area, house owner needs to use their registered contractor but MBPJ, house owner can use their own Tong
Q : How much is the penalty to be imposed if renovation started without permit / approval?
A : 10-20x from processing fees. Example; Processing fees : RM500, Penalty : RM500x20 = RM10k
Q : What are the difference between Standard Book & Architectural Plan?
A : Standard Book only for basic extension without flat roof.
Q : Internal renovation also needs approval plan?
A : Yes if there are new internal structure (brick wall / beam)
Q : Awning installation does require a permit?
A : No
Q : What is CCC?
A : CCC is Certificate of Completion and Compliance
Q : Can house owner add more floor for intermediate terrace link house?
A: Yes can