Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 THE ZIZZ @ DAMANSARA NORTH, who deleted the previous thread?

views
     
kiwiguy
post Oct 24 2017, 10:44 PM

Getting Started
**
Junior Member
238 posts

Joined: Oct 2017
From: Kuala Lumpur


got agent told me all units sold out?
kiwiguy
post Dec 7 2017, 07:44 PM

Getting Started
**
Junior Member
238 posts

Joined: Oct 2017
From: Kuala Lumpur


I'm not sure of the quality of the work for the zizz as when i look up from the sales gallery, I saw the two red line on the side of the block were not the same from the bottom to the top (as circled). is it designed like that?
do they use the same bad contractor for the zizz?


Attached thumbnail(s)
Attached Image
kiwiguy
post Feb 20 2018, 03:36 PM

Getting Started
**
Junior Member
238 posts

Joined: Oct 2017
From: Kuala Lumpur


QUOTE(propertybuddy @ Feb 20 2018, 12:21 PM)
from ZZ to MRT dam dam 450m
similar to MRT 1 props la..
i residence to MRT KD (350m)
Casa Indah to MRT Surian (350m)
Pelangi Utama to MRT Bandar Utama (650m)
-- line 1 3 bedders are ranges around 6xxk 7xxk
*
bro it's about location and other factors too.
few years back before mrt was built for those KD condos, their price is already 6xxk 7xxk
cannot compare solely on distance to mrt only
kiwiguy
post Apr 16 2018, 01:53 PM

Getting Started
**
Junior Member
238 posts

Joined: Oct 2017
From: Kuala Lumpur


QUOTE(Asali @ Apr 15 2018, 09:51 PM)
standard size is 6 feet.
*
minimum spec is 4feet and they provide minimum only.
kiwiguy
post Feb 4 2019, 06:38 PM

Getting Started
**
Junior Member
238 posts

Joined: Oct 2017
From: Kuala Lumpur


QUOTE(indramerlin @ Feb 4 2019, 12:39 PM)
RM350psf
*
i think its more than 350psf. can't be 750sf 260k only
maybe just above 400psf..
kiwiguy
post Jun 10 2019, 11:38 AM

Getting Started
**
Junior Member
238 posts

Joined: Oct 2017
From: Kuala Lumpur


QUOTE(propertybuddy @ Jun 10 2019, 02:58 AM)
good. Ahead of schedule.. Less headache compare to delayed project, hv to argue and settle LAD. Earlier completion, earlier get rented out. Better cash flow, better Dsr, better loan capacity, more flexible, more opportunities
*
what's good about being ahead of schedule? the mrt2 is still not ready. rental sure low

 

Change to:
| Lo-Fi Version
0.0295sec    0.55    7 queries    GZIP Disabled
Time is now: 16th December 2025 - 10:38 AM