Just want to share my worklog. Begining of this year starting on first January i have been thinking of changing my rig. Previously im on the X79 platform and i love it. As time goes by X99 comes out and for me i think this is the best time to change my rig completely. Regardless of that i finish nearly RM30k for all the hardware, software water cooling system and buying some wrong things as my idea keep on changing. You also can see im selling the ones that im not using soon. Just intro im new to water cooling but not modding pc rigs as well as overlocking.This is also request from few friends that i know of here as i usually on outside forums. Feel free to comment any of my build but just a note i purposely done this one OVERKILLed! I know some will ask why i dont go for rigid tubing. IMHO just cosmetic nothing else and further more i frequent changing lots of hardware. At first i ordered all fitting to quick disconnect but i dont know why i change to the normal way using drain port. Let the project begins!!
2nd January i start to buy all the my rig hardware but not the water cooling item. Bought them and Test first but intro on my specs first
a) PC Spec
- Rampage V Extreme X99 ROG motherboard
- 5930k Intel Processor
- Corsair Vengence 2800Mhz DDR4 rams
- GTX 980 Strix in SLI
- Xonar Phoebus ROG Sound Card
- PLEXTOR M6 Pro 512GB
- 2 TB Western Digital HDD
- 1300w Cooler Master SIlent Hybrids PSU
- Custom white sleeves
- Razer Chroma Keyboard
- Razer Ouroboros
- Razer Tiamat 7.1
- ROG PB278Q monitor
- Enthoo Primo case
- Bitfenix white 300mm lighting
- 12 unit of SP120 Corsair Fans <-- change to 16 fans
- 3 unit of AF140 COrsair Fans
- 2 unit of Darkside 3-Pin Dual Radiator Push / Pull 4x Fan Y Splitter Cable - Jet Black Sleeved
- Darkside 3-Pin Dual Radiator Push / Pull 6x Fan Y Splitter Cable - Jet Black Sleeved
- Bitfenix Y cable for molex

b) Water cooling
- EK Supremacy EVO Gold edition CPU Block
- EK ASUS Rampage V Extreme Full Board Cooling Block Kit - Nickel CSQ <-- intial build but change to EK Asus R5E full WB
- XSPC Dual D5 pump bay res <-- change to MCP655 Siftech dual pump
- Alphacool NexXxoS Monsta Dual 360mm Radiator Special Edition White - 80mm Thick!!
- Alphacool NexXxoS Monsta Dual 240mm Radiator - 80mm Thick!! <-- Taken out
- Alphacool NexXxoS XT45 Full Copper 240mm Radiator <-- Taken out
- 1 unit Koolance INS-FLTR04 Inline Coolant Filter <-- Taken out
- 1 unit Koolance Flow meter
- 2 unit of EK GeForce GTX 980 Strix Full Coverage Water Block
- 2 unit of EK GeForce GTX 980 Strix Backplate - Nickel
- 2 unit Bitspower Adjustable Aqua Link Pipe II (41-69mm) - White <-- Taken out -- change to EK FC link bridge
- 12 unit Bitspower G1/4 Thread 90-Degree Dual Rotary Adapter - White
- 5 unit of Bitspower G1/4 Thread 90-Degree Triple Rotary Compression Fitting - White
- 2 unit of Bitspower G1/4" Mini Valve - Deluxe White
- 2 unit of Bitspower G1/4 Male to Female Extender - 30mm - Deluxe White
- 2 unit of Bitspower G1/4 Male to Female Extender - 40mm - Deluxe White
- 2 units of Bitspower G1/4 Male to Female Extender - 15mm - Deluxe White
- 5 unit of Bitspower Dual G1/4" Male / Male Fitting - White
- 16 unit of Bitspower Compression fitting
- 10ft of PrimoChill PrimoFlex Advanced LRT Tubing- Elegant White <-- change to rigid tubing
- Iand Silver kill coils<-- Taken out
- Mayhems Biocide Extreme <-- Taken out
- IandH Dead-Water Copper Sulfate Biocidal PC Coolant Additive <-- Taken out
Note: Some of cooling hardware is ondaway from store's in US and also include waiting my buddy niclasteo here in LYN Malaysia. Below are the some of the item i already received



So is time for me to stress test the hardware first and a liltle overclocked have been done to 4.7Ghz on my test bench. See below


The loop sketch idea is as below

As of update yesterday i start installing my waterblock first but one of the block screw broke while im instaling the screw. See below

And later i ordered another one since im running on SLI also waiting now for the it to arrive. Below is the finished product using the other block


I will update later on when my item start to come this coming Friday, so for now.. WIP..
Last Updated 21/01/2015@14:43pm
to be continue......
This post has been edited by Grimmm: Mar 5 2015, 09:55 PM
Jan 21 2015, 02:38 PM, updated 11y ago
Quote












0.0268sec
0.61
5 queries
GZIP Disabled