> 3 phase tnb application, test result apa sai ?

views
     
TSlcs89
post Jan 4 2015, 01:12 PM, updated 11y ago

Getting Started
**
Junior Member
80 posts

Joined: Sep 2008
What are the documents required for e-Application?
A: The documents needed are still the same as the manual application, i.e. Sales and Purchase (S&P) agreement of the involved premise, photostated copy of IC, G&H form (verification of wiring done and tested by certified electrical contractor), testing result,schematic diagram by contractor.

Does anyone here know what is the testing result ??
stevenlee
post Jan 4 2015, 01:24 PM

look @ my Star *o* ...hoho
*******
Senior Member
3,158 posts

Joined: Apr 2005
From: -Butterworth, Penang-



QUOTE(lcs89 @ Jan 4 2015, 01:12 PM)
What are the documents required for e-Application?
A: The documents needed are still the same as the manual application, i.e. Sales and Purchase (S&P) agreement of the involved premise, photostated copy of IC, G&H form (verification of wiring done and tested by certified electrical contractor), testing result,schematic diagram by contractor.

Does anyone here know what is the testing result ??
*
you walk in to TNB with TNB Form from your developer, Stamp Hasil and SNP.
when you reach the counter, they will told you that your current form only for 1 phase.
to change to 3 phase, you need to have contractor to check your current house board and incoming cable...
to ease the job, just use the TNB appointed contractor..
i have mine done last year September...
including deposit total charges including contractor = RM1.8K
TSlcs89
post Jan 4 2015, 01:26 PM

Getting Started
**
Junior Member
80 posts

Joined: Sep 2008
QUOTE(stevenlee @ Jan 4 2015, 01:24 PM)
you walk in to TNB with TNB Form from your developer, Stamp Hasil and SNP.
when you reach the counter, they will told you that your current form only for 1 phase.
to change to 3 phase, you need to have contractor to check your current house board and incoming cable...
to ease the job, just use the TNB appointed contractor..
i have mine done last year September...
including deposit total charges including contractor = RM1.8K
*
no no ..my wan is totally new ...not upgrading ... I got all documents there ..however .I have no idea what it means by testing result ?? what kind of testing ??

>.<
chicharitos
post Jan 4 2015, 01:30 PM

Getting Started
**
Junior Member
118 posts

Joined: Aug 2010
QUOTE(lcs89 @ Jan 4 2015, 01:26 PM)
no no ..my wan is totally new ...not upgrading ... I got all documents there ..however .I have no idea what it means by testing result ?? what kind of testing ??

>.<
*
usually what tnb wants is the relay test result, sometimes it is attached under the borang H iinm.
stevenlee
post Jan 4 2015, 01:30 PM

look @ my Star *o* ...hoho
*******
Senior Member
3,158 posts

Joined: Apr 2005
From: -Butterworth, Penang-



QUOTE(lcs89 @ Jan 4 2015, 01:26 PM)
no no ..my wan is totally new ...not upgrading ... I got all documents there ..however .I have no idea what it means by testing result ?? what kind of testing ??

>.<
*
mine also totally new...
just bring IC, SNP, HASIL and Form to the counter..
i did not bring any diagram or drawing for my first visit as my form just for 1 phase and i have to change to 3 phase form...
i have to change the diagram and drawing, so they ask me if i wan to use own or TNB appointed contractor...
i choose to use TNB contractor, so they settle everything for me..
i just walk in to pay the deposit when everything is done.

Bold9900
post Jan 4 2015, 01:31 PM

Getting Started
**
Junior Member
181 posts

Joined: Feb 2012
rumah hang mau install begitu banyak aircond
stevenlee
post Jan 4 2015, 01:35 PM

look @ my Star *o* ...hoho
*******
Senior Member
3,158 posts

Joined: Apr 2005
From: -Butterworth, Penang-



QUOTE(Bold9900 @ Jan 4 2015, 01:31 PM)
rumah hang mau install begitu banyak aircond
*
more than 3 better use 3 phase...
mine last time the meter box on fire due to too many open at same time...
minimum 4 running all time...
furthermore, 3 phase one advantage is if 1 fuse broke down, 2 fuse still usable and your house wont totally dark
veron4best
post Jan 19 2016, 03:00 PM

Regular
******
Senior Member
1,146 posts

Joined: Sep 2005
From: Kuala Lumpur


QUOTE(stevenlee @ Jan 4 2015, 01:30 PM)
mine also totally new...
just bring IC, SNP, HASIL and Form to the counter..
i did not bring any diagram or drawing for my first visit as my form just for 1 phase and i have to change to 3 phase form...
i have to change the diagram and drawing, so they ask me if i wan to use own or TNB appointed contractor...
i choose to use TNB contractor, so they settle everything for me..
i just walk in to pay the deposit when everything is done.
*
May I know u change to 3 phase before VP or after VP?

Tq.

stevenlee
post Jan 20 2016, 07:30 AM

look @ my Star *o* ...hoho
*******
Senior Member
3,158 posts

Joined: Apr 2005
From: -Butterworth, Penang-



QUOTE(veron4best @ Jan 19 2016, 03:00 PM)
May I know u change to 3 phase before VP or after VP?

Tq.
*
after VP
JJayz
post Apr 27 2017, 04:57 PM

New Member
*
Junior Member
10 posts

Joined: Sep 2008
From: Penang


QUOTE(lcs89 @ Jan 4 2015, 01:26 PM)
no no ..my wan is totally new ...not upgrading ... I got all documents there ..however .I have no idea what it means by testing result ?? what kind of testing ??

>.<
*
what do you mean about stamp hasil? what if it is a old house? what kind of documents needed?