Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
153 Pages « < 137 138 139 140 141 > » Bottom

Outline · [ Standard ] · Linear+

Investment WESTSIDE III, DESA PARKCITY, Westside 3 is the Tallest Condo in DPC

views
     
Investor King
post Jul 1 2016, 07:31 AM

Casual
***
Junior Member
420 posts

Joined: May 2016
Boss, i can accept if the diff is <50%..

QUOTE(ManutdGiggs @ Jun 30 2016, 10:41 PM)
Boss gd n reliable won't come cheap. End day it's Wat quality u wan.
*
ManutdGiggs
post Jul 1 2016, 08:30 AM

10k Club
********
All Stars
13,761 posts

Joined: Jun 2011
QUOTE(Investor King @ Jul 1 2016, 07:31 AM)
Boss, i can accept if the diff is <50%..
*
Won't be more than 50% la. Get a reliable 1 ll do ma.
moonmoon1985
post Jul 15 2016, 07:25 PM

moonmoon
***
Junior Member
340 posts

Joined: Sep 2007
next billing bila ya?
Vingoh
post Jul 15 2016, 08:22 PM

Getting Started
**
Junior Member
77 posts

Joined: May 2016
Anyone know when westside 3 ccc, it will be handover with strata title or still under master title?
ManutdGiggs
post Jul 15 2016, 08:30 PM

10k Club
********
All Stars
13,761 posts

Joined: Jun 2011
QUOTE(moonmoon1985 @ Jul 15 2016, 07:25 PM)
next billing bila ya?
*
Which flr u bot???
moonmoon1985
post Jul 18 2016, 09:25 AM

moonmoon
***
Junior Member
340 posts

Joined: Sep 2007
QUOTE(ManutdGiggs @ Jul 15 2016, 08:30 PM)
Which flr u bot???
*
>30th.. or they intend to bill upon CCC which I wouldn't mind for sure
ManutdGiggs
post Jul 18 2016, 09:28 AM

10k Club
********
All Stars
13,761 posts

Joined: Jun 2011
QUOTE(moonmoon1985 @ Jul 18 2016, 09:25 AM)
>30th.. or they intend to bill upon CCC which I wouldn't mind for sure
*
Structural wise u still have to wait long long for the 3rd @15%. Ppsb onli able to bill 6th flr by now.

But common amenities wise u might either get billed a bit earlier or almost same as ur 3rd.

Soli boss.morning I tok kok. Pls pardon me.
moonmoon1985
post Jul 18 2016, 03:27 PM

moonmoon
***
Junior Member
340 posts

Joined: Sep 2007
QUOTE(ManutdGiggs @ Jul 18 2016, 09:28 AM)
Structural wise u still have to wait long long for the 3rd @15%. Ppsb onli able to bill 6th flr by now.

But common amenities wise u might either get billed a bit earlier or almost same as ur 3rd.

Soli boss.morning I tok kok. Pls pardon me.
*
Thanks boss for the insight!
SUSMNet
post Jul 18 2016, 10:43 PM

10k Club
********
All Stars
11,954 posts

Joined: May 2007



Still available low or mid floor smallest unit for westside 3?
ManutdGiggs
post Jul 18 2016, 10:52 PM

10k Club
********
All Stars
13,761 posts

Joined: Jun 2011
QUOTE(MNet @ Jul 18 2016, 10:43 PM)
Still available low or mid floor smallest unit for westside 3?
*
Smallest at low flr all sold out long long time ago lo.
kochin
post Jul 19 2016, 08:30 AM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


QUOTE(ManutdGiggs @ Jul 18 2016, 09:28 AM)
Structural wise u still have to wait long long for the 3rd @15%. Ppsb onli able to bill 6th flr by now.

But common amenities wise u might either get billed a bit earlier or almost same as ur 3rd.

Soli boss.morning I tok kok. Pls pardon me.
*
can bill amenities separately from your unit? hmm.gif
ManutdGiggs
post Jul 19 2016, 09:15 AM

10k Club
********
All Stars
13,761 posts

Joined: Jun 2011
QUOTE(kochin @ Jul 19 2016, 08:30 AM)
can bill amenities separately from your unit?  hmm.gif
*
I tok kok ma boss. laugh.gif
moonmoon1985
post Jul 19 2016, 06:04 PM

moonmoon
***
Junior Member
340 posts

Joined: Sep 2007
QUOTE(kochin @ Jul 19 2016, 08:30 AM)
can bill amenities separately from your unit?  hmm.gif
*
sewerage (5%), drain (2.5%) and road (2.5%) sweat.gif
Investor King
post Jul 19 2016, 06:06 PM

Casual
***
Junior Member
420 posts

Joined: May 2016
Anyone has good recommendation for a good renovation contractor that are currently working in DPC?
Bobby C
post Jul 21 2016, 10:42 AM

On my way
****
Senior Member
663 posts

Joined: Oct 2008
QUOTE(ManutdGiggs @ Jul 18 2016, 09:28 AM)
Structural wise u still have to wait long long for the 3rd @15%. Ppsb onli able to bill 6th flr by now.

But common amenities wise u might either get billed a bit earlier or almost same as ur 3rd.

Soli boss.morning I tok kok. Pls pardon me.
*
How fast the construction boss?

1 floor per week?


ManutdGiggs
post Jul 21 2016, 11:10 AM

10k Club
********
All Stars
13,761 posts

Joined: Jun 2011
QUOTE(Bobby C @ Jul 21 2016, 10:42 AM)
How fast the construction boss?

1 floor per week?
*
As wat I c it's less than 2wks a flr. Maybe bout 10 working days

This post has been edited by ManutdGiggs: Jul 21 2016, 11:10 AM
Bobby C
post Jul 21 2016, 07:14 PM

On my way
****
Senior Member
663 posts

Joined: Oct 2008
QUOTE(ManutdGiggs @ Jul 21 2016, 11:10 AM)
As wat I c it's less than 2wks a flr. Maybe bout 10 working days
*
Alright, looks like taking sweet time, hopefully doing better job.

Some China contractor can do in 5 days if in a rush.

The slower the merrier, buy time for future capital appreciation and repayment smile.gif

This post has been edited by Bobby C: Jul 22 2016, 11:06 AM
azi
post Jul 23 2016, 01:45 PM

Getting Started
**
Junior Member
130 posts

Joined: Aug 2005
QUOTE(ManutdGiggs @ Jul 21 2016, 11:10 AM)
As wat I c it's less than 2wks a flr. Maybe bout 10 working days
*
any latest spy pics on progress boss?

few wks ago i passed by noticed the construction site entrance was done nicely, with proper spinner gates and artist impressions for the workers haha.

also the link road behind has been blocked off, not sure if they are building the soil retainer on the slope or its for basement digging.


Investor King
post Jul 23 2016, 02:12 PM

Casual
***
Junior Member
420 posts

Joined: May 2016
Can we use the link road?
QUOTE(azi @ Jul 23 2016, 01:45 PM)
any latest spy pics on progress boss?

few wks ago i passed by noticed the construction site entrance was done nicely, with proper spinner gates and artist impressions for the workers haha.

also the link road behind has been blocked off, not sure if they are building the soil retainer on the slope or its for basement digging.
*
SUSstinky
post Jul 23 2016, 09:31 PM

Regular
******
Senior Member
1,436 posts

Joined: Feb 2005


QUOTE(azi @ Jul 23 2016, 01:45 PM)
any latest spy pics on progress boss?

few wks ago i passed by noticed the construction site entrance was done nicely, with proper spinner gates and artist impressions for the workers haha.

also the link road behind has been blocked off, not sure if they are building the soil retainer on the slope or its for basement digging.
*
Photo

This post has been edited by stinky: Jul 24 2016, 12:24 PM

153 Pages « < 137 138 139 140 141 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0333sec    0.89    6 queries    GZIP Disabled
Time is now: 21st December 2025 - 03:56 AM