Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

Investment SETIA ECOHILL (VERSION 12) [OWNER'S THREAD], An Inspiring Eco Township in Semenyih

views
     
ckl1998
post Jan 3 2015, 01:03 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
QUOTE(treehill @ Jan 3 2015, 04:48 AM)
Superlink is going to launch soon with a new security technology on the fencing...
*
New product? Can't find any further info on this.

ckl1998
post Jan 13 2015, 04:45 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
Anyone know when the super link Grandlis to be launched? Indicative price?
ckl1998
post Jan 13 2015, 06:04 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
QUOTE(samkps @ Jan 13 2015, 04:48 PM)
Grandlis is nearest to the STP one I think, with a footprint of 23.6' X 88'...

Already started to registered, heard will be launched after CNY (dunno how true), starting from 800k++

Others shall start from 700k ++ ...
*
Thank you. What is STP?
ckl1998
post Jan 13 2015, 06:08 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
QUOTE(samkps @ Jan 13 2015, 06:06 PM)
Welcome, Sewage Treatment Plant..
*
sweat.gif hahaha
ckl1998
post Jan 13 2015, 06:23 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
QUOTE(samkps @ Jan 13 2015, 06:15 PM)
Yeah, that's the problem associated to Grandlis.. But you can talk to the SA, ask them carefully about this issue. I think SEH do realize it and have done some checking to ensure it shall not affect the grandlis resident in future.

As a purchaser, you have the right to determine whether want to go ahead after listen to the explanation.

I think Pantai Dalam also has a big STP, how's the resident in surrounding?  hmm.gif  hmm.gif
*
I assume this STP is the one build as part of SEH project or it is an existing STP in that area?
ckl1998
post Jan 21 2015, 06:19 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
QUOTE(treehill @ Jan 21 2015, 10:46 AM)
I cant share anything yet till I actually stay there (that would be in year 2016)  biggrin.gif
Now still difficult to tell but at least the journey will be shorten once the Ecohill-Lekas link is ready by June 2015. There should be a grand opening! Hopefully grand opening during VP time too!  rclxms.gif  thumbup.gif
*
This Ecohill-Lekas from what I read is to have direct connect to SILK, PLUS and LDP? I have frequent travel to Technology Park Bukit Jalil, any idea how much the Ecohill-Lekas will help, cut down at least 30% travel time?
ckl1998
post Jan 21 2015, 11:44 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
QUOTE(samkps @ Jan 21 2015, 11:39 PM)
Yeah, it depends on individual preference..

Personally, I prefer to take Silk Bukit Kajang - Silk Sungai Ramal - Kajang - Sungai Besi - Horse Race roundabout - TPM..  Yes, extra toll RM 1.80 (Kajang - Sungai Besi). The jam area is transition from Silk Sungai Ramal to Kajang toll, that traffic light really  doh.gif  doh.gif  The second area where possible jam is the Horse Race roundabout... Other road normally is okay.

Twin Palm - Balakong - Mines sometime I will use as well.. However, the jam occasionally starting from Balakong, all the way to Mines, South City Plaza till Taman Serdang Raya Caltex... Terrible.. ....  doh.gif  doh.gif But this route shall  save the RM 1.80 toll...
*
Hence going to Seri Kembangan or Bukit Jalil will surely having these traffic bottlenecks which one will need to "tahan". From your experience, it is bearable? How long normally you will stuck at these bottlenecks?

This post has been edited by ckl1998: Jan 21 2015, 11:53 PM
ckl1998
post Jan 22 2015, 09:25 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
QUOTE(samkps @ Jan 22 2015, 09:00 AM)
Yeah, very hard to avoid the jam in this area.

I am taking about 40 minutes for the travel. Please refer to my post #1766...

https://forum.lowyat.net/topic/3032037/+1760

If lucky enough and no jam in this area, I think from Semenyih Lekas toll can reach Technology Park Malaysia in 25 - 30 minutes..
*
Normally how long the jam will take for Mines and Sg Ramal-Kajang toll there? 15 minutes?

ckl1998
post Jan 23 2015, 06:30 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
QUOTE(samkps @ Jan 23 2015, 02:45 PM)
SP Setia is building Ecohill link that will connect to LEKAS directly without the need to go to Jalan Semenyih.

Within 5 minutes of travel, you already reach Kajang Perdana area... Traffic will be fairly smooth along the way till Batu 9 toll. All roads are at least 2 lanes and only have 1 traffic light near saujana impian area. Traffic along this stretch normally no problem.

The nightmare starts after batu 9 toll.. I think even you stay in Cheras also will face the same problem...  doh.gif

So you work in Bangsar? Normally how long it takes from your rented house in Seputeh to Bangsar during peak hour?  hmm.gif
*
If kids study in SRJK Sin Ming or Semenyih, no matter how, if one to send kid before work, will sure need to go Jalan Semenyih, right? Any shortcut?

ckl1998
post Jan 29 2015, 06:26 PM

Getting Started
**
Junior Member
225 posts

Joined: Dec 2009
QUOTE(darween13 @ Jan 29 2015, 04:17 PM)
Just build kitchen cabinet in concrete la, then use aluminium door...
*
Do Sentricon. Though expensive, depend on the package, 3k to 5k, quite good. It is to the extend that the 2 neighbors next to my cousin's house , their termite issue gone even though my cousin is the only one who did. The bad is the termite migrated to few houses in the next row where previously didn't have termite problem.

Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0416sec    0.62    7 queries    GZIP Disabled
Time is now: 4th December 2025 - 09:24 PM