QUOTE(fondo @ Dec 6 2014, 01:00 PM)
Hey, anyone pro in piling works?

Mind to tell me what is the method to check the verticality of bore hole before casting and even after casting?
*
QUOTE(blek @ Dec 6 2014, 08:29 PM)
hi, how to calculate how much consume for cement and sand for a 1:3 25mm thk cement screed?
let say like 1000 ft2, how many pack of cement and how many pack of sand? does it calculate in m3?

A 150mm RC slab are usually how many layer of layer of cement and how many layer of netting? how thk are the cement every layer? the cement mixture are 1:3 also?

is every column have ground trench linked to other column? only footing alone not enough?

are very staircase must have at least 1 shear wall? some have 2?

if a more than 2 storey building wana do extention, how do rebar of new beam connect to existing structure?
*
You guys need to learn to summon the respected person or at least give a quote to get his attention.

kuchiyose sensei iwubpreve

 