QUOTE(fondo @ Dec 6 2014, 01:00 PM)
Hey, anyone pro in piling works?
Mind to tell me what is the method to check the verticality of bore hole before casting and even after casting?
Mind to tell me what is the method to check the verticality of bore hole before casting and even after casting?
QUOTE(blek @ Dec 6 2014, 08:29 PM)
hi, how to calculate how much consume for cement and sand for a 1:3 25mm thk cement screed?
let say like 1000 ft2, how many pack of cement and how many pack of sand? does it calculate in m3?
A 150mm RC slab are usually how many layer of layer of cement and how many layer of netting? how thk are the cement every layer? the cement mixture are 1:3 also?
is every column have ground trench linked to other column? only footing alone not enough?
are very staircase must have at least 1 shear wall? some have 2?
if a more than 2 storey building wana do extention, how do rebar of new beam connect to existing structure?
You guys need to learn to summon the respected person or at least give a quote to get his attention.let say like 1000 ft2, how many pack of cement and how many pack of sand? does it calculate in m3?
A 150mm RC slab are usually how many layer of layer of cement and how many layer of netting? how thk are the cement every layer? the cement mixture are 1:3 also?
is every column have ground trench linked to other column? only footing alone not enough?
are very staircase must have at least 1 shear wall? some have 2?
if a more than 2 storey building wana do extention, how do rebar of new beam connect to existing structure?