my contractor used cement bricks instead of clay bricks as stipulated in the quotation. as i m quite busy, i dont go to the site frequently, even if i do, its a quick stop n go. by the time i realized he used cement bricks, more than half of the house is done.
what can i do about this? i dont want him to replace with clay bricks because he has delayed my house too long and i m rushing to move in.
he is on this forum too so i dont want to reveal too much details
Compilation of Good And Bad Contractors V2
Dec 14 2017, 08:02 PM
Quote
0.0136sec
0.73
7 queries
GZIP Disabled