Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

Investment DAMANSARA FORESTA (V2) [OWNERS' THREAD], A new development near Desa ParkCity

views
     
Keyrock
post Jan 16 2015, 04:25 PM

New Member
*
Junior Member
7 posts

Joined: Jan 2015
QUOTE(CMW123 @ Jan 15 2015, 08:46 PM)
Anyone can confirm construction still ongoing??
*
I see the lift carrying concrete (I presume) going up and down the past few days.
Keyrock
post Jan 19 2015, 09:53 PM

New Member
*
Junior Member
7 posts

Joined: Jan 2015
QUOTE(1282009 @ Jan 17 2015, 09:51 PM)
In my opinion, it is. I believe the pictures are taken from either block B or C (facing forest) and the railing at the lift area is between type A1 & A2.

To be fair, the design of the rest does not depict any flat-like design, just the railings only. But I'm more concern on the safety & also during heavy downpour. The whole area will be wet & we can't even manage to go to the lift lobby.
*
There is a rooftop garden. Therefore it will take very strong wind to wet the corridors. Having said that, I would have preferred walls with windows for safety. Maybe can petition for this.
Keyrock
post Jan 20 2015, 08:16 PM

New Member
*
Junior Member
7 posts

Joined: Jan 2015
QUOTE(cheahcw2003 @ Jan 20 2015, 07:07 PM)
From the YouTube video, it seems the roof top garden got void area (or air well) which allow the sunlight and rain water to go in.

The layout plan showing that the void area is quite small but the pictures taken slowing it is quite big. Agrees they should cover it up with either wall or tempered glass
*
Ok, I think in that case we have a small void area at the roof top garden which should not be a big deal as can be covered if rain is a problem.
Keyrock
post Mar 8 2015, 11:21 AM

New Member
*
Junior Member
7 posts

Joined: Jan 2015
QUOTE(GangHo @ Mar 7 2015, 11:13 PM)
Thank you so much for the photo thumbup.gif

Seems like it is taken during evening hour, it's a bit dark.

The progress seems ok mah....

anybody expect s any delay?
*
Should be on time Dec 2015. One SA I talked to think the 1st batch delivery for Block A lower floors could be even in Oct/Nov 2015.
Keyrock
post Mar 21 2015, 04:35 PM

New Member
*
Junior Member
7 posts

Joined: Jan 2015
QUOTE(1282009 @ Mar 18 2015, 01:04 AM)
From the satellite image, looks like they are also building this rest area/lookout point. Not sure how it will be connected to our facility floor.
*
Per the scale model, there is an access gate near Block A. This will lead to some stairs, etc. You will have to walk through there to the look out point overlooking the swimming pool.
Keyrock
post Mar 21 2015, 04:40 PM

New Member
*
Junior Member
7 posts

Joined: Jan 2015
QUOTE(cheahcw2003 @ Mar 21 2015, 02:10 PM)
It mentioned in the news, for DF price has reached RM800psf, the reporter mentioned about Phase 1 or Phase 2?

http://www.thestar.com.my/Business/Busines...owth/?style=biz
*
Phase 1 and a misprint I think. Should be RM600 psf.
Keyrock
post Mar 26 2015, 06:11 PM

New Member
*
Junior Member
7 posts

Joined: Jan 2015
QUOTE(fongozic @ Mar 24 2015, 05:40 PM)
hope the toilet will 99% like the showroom
*
If not mistaken, wood cabinet tak da. Mirror maybe not not full length as in showroom. One SA say water heater ada for Masterbath but maybe heater point only for smaller bath. Final product kena guess ...

 

Change to:
| Lo-Fi Version
0.0436sec    0.65    7 queries    GZIP Disabled
Time is now: 12th December 2025 - 06:35 AM