QUOTE(CMW123 @ Jan 15 2015, 08:46 PM)
I see the lift carrying concrete (I presume) going up and down the past few days.Investment DAMANSARA FORESTA (V2) [OWNERS' THREAD], A new development near Desa ParkCity
Investment DAMANSARA FORESTA (V2) [OWNERS' THREAD], A new development near Desa ParkCity
|
|
Jan 16 2015, 04:25 PM
Return to original view | Post
#1
|
![]()
Junior Member
7 posts Joined: Jan 2015 |
|
|
|
|
|
|
Jan 19 2015, 09:53 PM
Return to original view | Post
#2
|
![]()
Junior Member
7 posts Joined: Jan 2015 |
QUOTE(1282009 @ Jan 17 2015, 09:51 PM) In my opinion, it is. I believe the pictures are taken from either block B or C (facing forest) and the railing at the lift area is between type A1 & A2. There is a rooftop garden. Therefore it will take very strong wind to wet the corridors. Having said that, I would have preferred walls with windows for safety. Maybe can petition for this.To be fair, the design of the rest does not depict any flat-like design, just the railings only. But I'm more concern on the safety & also during heavy downpour. The whole area will be wet & we can't even manage to go to the lift lobby. |
|
|
Jan 20 2015, 08:16 PM
Return to original view | Post
#3
|
![]()
Junior Member
7 posts Joined: Jan 2015 |
QUOTE(cheahcw2003 @ Jan 20 2015, 07:07 PM) From the YouTube video, it seems the roof top garden got void area (or air well) which allow the sunlight and rain water to go in. Ok, I think in that case we have a small void area at the roof top garden which should not be a big deal as can be covered if rain is a problem.The layout plan showing that the void area is quite small but the pictures taken slowing it is quite big. Agrees they should cover it up with either wall or tempered glass |
|
|
Mar 8 2015, 11:21 AM
Return to original view | Post
#4
|
![]()
Junior Member
7 posts Joined: Jan 2015 |
QUOTE(GangHo @ Mar 7 2015, 11:13 PM) Thank you so much for the photo Should be on time Dec 2015. One SA I talked to think the 1st batch delivery for Block A lower floors could be even in Oct/Nov 2015.Seems like it is taken during evening hour, it's a bit dark. The progress seems ok mah.... anybody expect s any delay? |
|
|
Mar 21 2015, 04:35 PM
Return to original view | Post
#5
|
![]()
Junior Member
7 posts Joined: Jan 2015 |
QUOTE(1282009 @ Mar 18 2015, 01:04 AM) From the satellite image, looks like they are also building this rest area/lookout point. Not sure how it will be connected to our facility floor. Per the scale model, there is an access gate near Block A. This will lead to some stairs, etc. You will have to walk through there to the look out point overlooking the swimming pool. |
|
|
Mar 21 2015, 04:40 PM
Return to original view | Post
#6
|
![]()
Junior Member
7 posts Joined: Jan 2015 |
QUOTE(cheahcw2003 @ Mar 21 2015, 02:10 PM) It mentioned in the news, for DF price has reached RM800psf, the reporter mentioned about Phase 1 or Phase 2? Phase 1 and a misprint I think. Should be RM600 psf.http://www.thestar.com.my/Business/Busines...owth/?style=biz |
|
|
Mar 26 2015, 06:11 PM
Return to original view | Post
#7
|
![]()
Junior Member
7 posts Joined: Jan 2015 |
|
| Change to: | 0.0436sec
0.65
7 queries
GZIP Disabled
Time is now: 12th December 2025 - 06:35 AM |