If you want a peace of mind, get a qualified structural engineer to produce the drawing. The fee is not that much just a few hundred. After you have the drawing, get the contractor to quote for you and make sure he follow the drawing correctly during construction. That should be the way rather than let the contractor playing the fool on you.
This post has been edited by Astarguy: Jan 13 2014, 08:25 AM
Footing size for two stories extension, footing size for two storey extension
Jan 13 2014, 08:24 AM
Quote
0.0181sec
0.14
7 queries
GZIP Disabled