Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

Investment EKOCHERAS @ JALAN CHERAS (Ver 2) [MRT PROPERTY], Where Cheras becomes Mont'Jiulai

views
     
tangibee
post Dec 13 2013, 07:24 AM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
QUOTE(Donald Trump @ Dec 12 2013, 11:16 PM)
When they ask u to sign make sure the lawyer date it the day u sign else they can drag 6 months and not stamp the snp and date it 6 months later!!
*
+100


tangibee
post Dec 15 2013, 10:32 AM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
The delivery of Soho, Apartment, Offices, Mall and hotel can be seperately by stages right? can or cant they?

tangibee
post Dec 15 2013, 03:35 PM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
QUOTE(mybenz @ Dec 15 2013, 11:04 AM)
Good thing about thisproject is the mall will b completed before block J and H
*
how abt Block E?
tangibee
post Dec 16 2013, 08:25 PM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
QUOTE(superpigchan @ Dec 16 2013, 06:29 PM)
Signed SPA today, some sharing:
1. Only units on level 2 for block J, H and E are recalled
2. The re-designed mall contains air-con covered mall and non aircon street mall ( I like this concept a lot)
3. cineplex located in between tower H and E, above the 2-level shopping mall
4. 48 months contruction period is calculated from the date of signing SPA, not building plan approval date.
5. Liability period is 24 months after VP
6. still pending whether convert Tower N to hotel
7. the fund drawdown is upon "Completion" but not "commencement" of stages, it is a very good news for those who go for non-DIBS,
the 2nd 10% will be drawdown upon the completion of the fundamental and the 3rd 15% is the COMPLETION upon the structure construction of your parcel,
means 2nd 10% should be somewhere end of next year and 3rd 15% even somewhere in year 2015 coz they need to complete the mall first...very good...
*
Thanks for sharing

tangibee
post Dec 18 2013, 08:21 PM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
I cant recall all the feebies they promised:

1) Hood and Hob
2) Kitchen cabinet
3) Aircon for living and master room
4) Curtain? (did i heard wrong)
5) Heater? centralised?
6) ?

tangibee
post Dec 18 2013, 10:22 PM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
QUOTE(Erictan86 @ Dec 18 2013, 09:53 PM)
Only 1 2 and 3
*
tq
tangibee
post Dec 19 2013, 01:07 AM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
QUOTE(restful increase @ Dec 18 2013, 11:34 PM)
U didnt asked 4 letter fr d developer on all their freebies? They hv prepared a ltr. If u asked 4 the written ltr, they will give u a copy of it.
*
thanks. i will do that on weekend visit.
tangibee
post Dec 19 2013, 06:39 PM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
QUOTE(restful increase @ Dec 19 2013, 03:20 PM)
Txs jagalat-kor for takinh effort 2 upload the ekocheras plans.
*
+1

tangibee
post Dec 20 2013, 09:18 AM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
Receive letter as asking to sign SNP in 2 weeks.... Thats before 2014. I plan to buy without DIBS.

Zeti!!!! Should you review your new direction more clearly pls!! smile.gif


tangibee
post Dec 20 2013, 01:12 PM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
QUOTE(restful increase @ Dec 20 2013, 09:51 AM)
If ur only borrowing 70% without dibs package will suit u fine.
*
My loan is less than 55% (LTV 70%). shall go for non DIBS.
tangibee
post Dec 31 2013, 07:54 AM

Casual
***
Junior Member
457 posts

Joined: Aug 2013
Ekovest to acquire more land ....... (PropertyGuru Malaysia, Dec 30, 2013)

Ekovest Bhd plans to acquire more land in Iskandar Malaysia and Greater Kuala Lumpur.According to managing director Lim Keng Cheng, the company is focused on these two areas considering their potential for infrastructure developments like Mass Rapid Transit, which could naturally raise property prices.Aside from its newly-launched EkoCheras mixed development, Ekovest also has planned projects in Kuala Lumpur which has a gross development value (GDV) of RM4 billion.Meanwhile, the company's upcoming launches include the RM507 million serviced apartments EB Titiwangsa in Jalan Pahang and RM2.79 billion hotel and apartment EB Gateway in Setapak. These projects are set for completion in 2018 and 2023 respectively.Lim noted that the Malaysian property outlook is still enticing for investors since it is relatively cheaper, is politically stable and rich in natural resources.

Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0444sec    0.61    7 queries    GZIP Disabled
Time is now: 4th December 2025 - 03:35 AM