QUOTE(Saton666 @ Jul 23 2013, 01:03 AM)
Floor plan for the renovation.
Should be getting the approval from local authority on Monday.
[attachmentid=3557769]
[attachmentid=3557770]
[attachmentid=3557771]
Saving
1) Solar water heater + pump + shower set x 2 = Save RM880 (Budget RM 6,400 vs Actual RM 5,520)
2) Piping work + hotwater piping for 2 shower = Save RM 2,500 (Budget RM 5,000 vs Actual RM 2,500)
*** Include WC & Basin Cabinet installation.
3) WC x 2 + basin cabinet x 3 + Tap x 3 = Save RM 295 (Budget RM 3,000 vs Actual RM 2,705)
Over spend
drawings so old schooled. still using hand.Should be getting the approval from local authority on Monday.
[attachmentid=3557769]
[attachmentid=3557770]
[attachmentid=3557771]
Saving
1) Solar water heater + pump + shower set x 2 = Save RM880 (Budget RM 6,400 vs Actual RM 5,520)
2) Piping work + hotwater piping for 2 shower = Save RM 2,500 (Budget RM 5,000 vs Actual RM 2,500)
*** Include WC & Basin Cabinet installation.
3) WC x 2 + basin cabinet x 3 + Tap x 3 = Save RM 295 (Budget RM 3,000 vs Actual RM 2,705)
Over spend
Dec 30 2013, 12:52 PM

Quote