Welcome Guest ( Log In | Register )

51 Pages « < 17 18 19 20 21 > » Bottom

Outline · [ Standard ] · Linear+

Investment Damansara-Shah Alam Elevated Expressway (DASH), How can it benefit investors?

views
     
corleone74
post May 6 2015, 02:28 AM

Look at all my stars!!
*******
Senior Member
3,665 posts

Joined: Aug 2014
http://www.thestar.com.my/Metro/Community/...ity-on-project/



This post has been edited by corleone74: May 6 2015, 02:29 AM
urb7
post May 6 2015, 03:26 PM

On my way
****
Senior Member
664 posts

Joined: Nov 2009
QUOTE(corleone74 @ May 6 2015, 02:28 AM)
This group is getting quite annoying. They should lobby to change the aligned in DP, not call it to be scrapped 100%.

DASH should be built but it must adhere to the standards set.

This post has been edited by urb7: May 6 2015, 03:28 PM
kochin
post May 6 2015, 03:32 PM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


QUOTE(urb7 @ May 6 2015, 03:26 PM)
This group is getting quite annoying. They should lobby to change the aligned in DP, not call it to be scrapped 100%.

DASH should be built but it must adhere to the standards set.
*
agree.
DASH is quite important imho and warrants it to be built for the greater good.

godlikexioo
post May 6 2015, 03:46 PM

Enthusiast
*****
Senior Member
745 posts

Joined: Dec 2013
QUOTE(urb7 @ May 6 2015, 03:26 PM)
This group is getting quite annoying. They should lobby to change the aligned in DP, not call it to be scrapped 100%.

DASH should be built but it must adhere to the standards set.
*
Agree if the written in the star is correct they are too much. No compromise with the syarat-syarat they had set, who they tot they are? If gov instead must build what they can do? If i got kuasa i will make the alignment by pass the damansara perdana (as their wish) with direct connect to penchala link but i will take out the access from / to damansara perdana. which mean no access to penchala link from damansara perdana but access to mutira damansara and LDP remain. I don see how much tol can collect from damansara perdana better shut down the interchange to damansara perdana.
mroys@lyn
post May 6 2015, 04:32 PM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
QUOTE(kochin @ May 6 2015, 03:32 PM)
agree.
DASH is quite important imho and warrants it to be built for the greater good.
*
+1

QUOTE(godlikexioo @ May 6 2015, 03:46 PM)
Agree if the written in the star is correct they are too much. No compromise with the syarat-syarat they had set, who they tot they are? If gov instead must build what they can do? If i got kuasa i will make the alignment by pass the damansara perdana (as their wish) with direct connect to penchala link but i will take out the access from / to damansara perdana. which mean no access to penchala link from damansara perdana but access to mutira damansara and LDP remain. I don see how much tol can collect from damansara perdana better shut down the interchange to damansara perdana.
*
+1

ask them not to drive, walk.
SUSNew Klang
post May 6 2015, 05:13 PM

Look at all my stars!!
*******
Senior Member
4,998 posts

Joined: Dec 2010
Good prospect growth of Elmina, Denai Alam and RRI depend on DASH.


rosebud_luna
post May 6 2015, 05:23 PM

New Member
*
Junior Member
38 posts

Joined: Mar 2014
QUOTE(mroys@lyn @ May 6 2015, 04:32 PM)
+1
+1

ask them not to drive, walk.
*
+1million
corleone74
post May 6 2015, 05:28 PM

Look at all my stars!!
*******
Senior Member
3,665 posts

Joined: Aug 2014
QUOTE(urb7 @ May 6 2015, 03:26 PM)
This group is getting quite annoying. They should lobby to change the aligned in DP, not call it to be scrapped 100%.

DASH should be built but it must adhere to the standards set.
*
As I understand from the article, SNTD isn't asking for DASH to be scrapped, merely that the state remove official plans for DASH to pass by DP until further action (as suggested) is taken. As it stands in state plans, the highway passes in front of people's windows.

"SNTD hereby puts forth the following suggested plan of action following the removal of DASH from RTPJ2.

1. A permanent removal of DASH in the Petaling Jaya Local City Plan 2 (RTPJ2) where Damansara Perdana is concerned.

2. For the full expulsion and removal of all mention of the DASH expressway from the Selangor State Structural Draft Plan 2035 (Draf Rancangan Struktur Negeri 2035) – until there is an agreement on the final alignment by the residents of the affected Damansara Segment.

3. For the Department of Environment Selangor to void the extended Environmental Impact Assessment (EIA).

4. For the concessionaire company (Prolintas) to submit a new independent EIA and Traffic Impact Assessment (TIA) that excludes Damansara Perdana from the entire DASH project.

5. For the concessionaire company (Prolintas) to fulfill the three pre-conditions set by the Selangor government for highway construction namely making the entire agreement signed by the concession company public, stating the toll rate, proposed rate hike as well as rate of returns accrued throughout the entire lifetime of the project, and to show clear evidence that this project will bring substantial benefit not to the consumers of the highway, but to the residents living in the area."

This post has been edited by corleone74: May 6 2015, 05:28 PM
corleone74
post May 6 2015, 05:30 PM

Look at all my stars!!
*******
Senior Member
3,665 posts

Joined: Aug 2014
QUOTE(New Klang @ May 6 2015, 05:13 PM)
Good prospect growth of Elmina, Denai Alam and RRI depend on DASH.
*
So isn't that a selfish reason for wanting DASH.? Isn't it the same as my selfish reason for not wanting DASH to cut right across the front of my family's condo?

blush.gif
rosebud_luna
post May 6 2015, 05:45 PM

New Member
*
Junior Member
38 posts

Joined: Mar 2014
QUOTE(corleone74 @ May 6 2015, 05:30 PM)
So isn't that a selfish reason for wanting DASH.? Isn't it the same as my selfish reason for not wanting DASH to cut right across the front of my family's condo?

blush.gif
*
habis kalau ada rumah, tak perlu ada highway untuk jalan keluar rumah?
salah siapa buat rumah jauh-jauh tapi tak ada access dan depending dekat jalan heavy traffic?
same concept kalau DP resident tak ada highway untuk keluar rumah.
cuma DASH need to realign. tak payah sampai cancel menyusahkan resident tempat lain
be fair and square
LTG
post May 6 2015, 05:56 PM

Regular
******
Senior Member
1,780 posts

Joined: Jul 2008
dash is needed ,,kd so jam now
godlikexioo
post May 6 2015, 06:08 PM

Enthusiast
*****
Senior Member
745 posts

Joined: Dec 2013
Sekiranya, tak melalui DP apa kaitan penduduk DP minta prolintas mengemukakan EIA & TIA baru? Gila betul ini SNTD ingat meraka siape? Kerajaan Tampatan ge?

People talking above benefits for populatik up to million.
This SNTD talking their own benefit which only got 10k population. Cheah...
Asvita
post May 6 2015, 06:47 PM

Getting Started
**
Junior Member
77 posts

Joined: Apr 2011

We will not accept any redesign for DASH, say residents


May 5): The Say No To DASH Damansara Group (SNTD) has reiterated that the residents did not want the Damansara Shah Alam Highway (DASH) to go through the Damansara Perdana neighbourhood in Petaling Jaya.

Its spokesman Alvin Chia said in a statement that the residents had made it clear that they would not accept any redesign of the proposed highway.

Instead, the residents want a permanet removal of DASH from the Petaling Jaya Local Draft Plan 2 where Damansara Perdana was concerned.

"(We want) the full expulsion and removal of all mention of the DASH expressway from the Selangor State Structural Draft Plan 2035 until there is an agreement on the final alignment by the residents of the affected Damansara segment," Chia said.

SNTD also urged the Department of Environment Selangor to void the extended Environmental Impact Assessment (EIA) for the project.

Chia said the concessionaire company (Prolintas) should submit a new independent EIA
and Traffic Impact Assessment (TIA) that excludes Damansara Perdana from the entire DASH project.

"(We want) the concessionaire company (Prolintas) to fulfil the three pre-conditions set by the Selangor government for highway construction namely making the entire agreement signed by the concession company public, stating the toll rate, proposed rate hike as well as rate of returns accrued throughout the entire lifetime of the project, and to show clear evidence that this project will bring substantial benefit not to the consumers of the highway, but to the residents living in the area.

"These measures, once performed will be consistent with the Selangor government’s stance of good governance, transparency and accountability.

"This will result in a more consultative, inclusive and people-centric government. Elected representatives, councillors and civil servants are elected to represent the people’s interests and hence, to listen to the rakyat they serve," Chia said. – The Malaysian Insider
godlikexioo
post May 6 2015, 07:11 PM

Enthusiast
*****
Senior Member
745 posts

Joined: Dec 2013
QUOTE(Asvita @ May 6 2015, 06:47 PM)
We will not accept any redesign for DASH, say residents


Its spokesman Alvin Chia said in a statement that the residents had made it clear that they would not accept any redesign of the proposed highway.

Instead, the residents want a permanet removal of DASH from the Petaling Jaya Local Draft Plan 2 where Damansara Perdana was concerned.

tak bagi ruang utk perbincangan[B[COLOR=red]]


SNTD also urged the Department of Environment Selangor to void the extended Environmental Impact Assessment (EIA) for the project.

bagi arahan kpd agensi kerajaan lagi.[cool.gif[COLOR=red]

Chia said the concessionaire company (Prolintas) should submit a new independent EIA
and Traffic Impact Assessment (TIA) that excludes Damansara Perdana from the entire DASH project.

Apa kaitan dgn mereka sekira DASH tak melalui DP?[cool.gif[COLOR=red]

"(We want) the concessionaire company (Prolintas) to fulfil the three pre-conditions set by the Selangor government for highway construction namely making the entire agreement signed by the concession company public, stating the toll rate, proposed rate hike as well as rate of returns accrued throughout the entire lifetime of the project, and to show clear evidence that this project will bring substantial benefit not to the consumers of the highway, but to the residents living in the area.

Sememang suara kerajaan, tak mematuhi syarat ditetap akan kenal balas?[cool.gif[COLOR=red]

"These measures, once performed will be consistent with the Selangor government’s stance of good governance, transparency and accountability.

"This will result in a more consultative, inclusive and people-centric government. Elected representatives, councillors and civil servants are elected to represent the people’s interests and hence, to listen to the rakyat they serve," Chia said. – The Malaysian Insider

Suara cam org politik lagi. Nak I bagi undi kenal ikut[COLOR=red] cara saya.[cool.gif

*
This post has been edited by godlikexioo: May 6 2015, 07:15 PM
godlikexioo
post May 6 2015, 07:20 PM

Enthusiast
*****
Senior Member
745 posts

Joined: Dec 2013
We will not accept any redesign for DASH, say residents


Its spokesman Alvin Chia said in a statement that the residents had made it clear that they would not accept any redesign of the proposed highway.

Instead, the residents want a permanet removal of DASH from the Petaling Jaya Local Draft Plan 2 where Damansara Perdana was concerned.

tak bagi ruang utk perbincangan


SNTD also urged the Department of Environment Selangor to void the extended Environmental Impact Assessment (EIA) for the project.

bagi arahan kpd agensi kerajaan lagi

Chia said the concessionaire company (Prolintas) should submit a new independent EIA
and Traffic Impact Assessment (TIA) that excludes Damansara Perdana from the entire DASH project.

Apa kaitan dgn mereka sekiranya DASH tak melalui DP?

"(We want) the concessionaire company (Prolintas) to fulfil the three pre-conditions set by the Selangor government for highway construction namely making the entire agreement signed by the concession company public, stating the toll rate, proposed rate hike as well as rate of returns accrued throughout the entire lifetime of the project, and to show clear evidence that this project will bring substantial benefit not to the consumers of the highway, but to the residents living in the area.

Sememang cam suara kerajaan, tak mematuhi syarat ditetap akan kenal balas?

"These measures, once performed will be consistent with the Selangor government’s stance of good governance, transparency and accountability.

"This will result in a more consultative, inclusive and people-centric government. Elected representatives, councillors and civil servants are elected to represent the people’s interests and hence, to listen to the rakyat they serve," Chia said. – The Malaysian Insider

Suara cam org politik lagi. Nak I bagi undi kenal ikut cara saya.

This post has been edited by godlikexioo: May 6 2015, 09:03 PM
mroys@lyn
post May 6 2015, 07:24 PM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
QUOTE(corleone74 @ May 6 2015, 05:30 PM)
So isn't that a selfish reason for wanting DASH.? Isn't it the same as my selfish reason for not wanting DASH to cut right across the front of my family's condo?

blush.gif
*
DASH is using the road reserved in front of their condo; not acquiring their land or unit. sharing (road reserved) is selfish???
robert82
post May 6 2015, 07:27 PM

Regular
******
Senior Member
1,924 posts

Joined: Jan 2011
Time to setup SAY Yes to DASH Damansara Group (SYTD)
brother love
post May 6 2015, 09:55 PM

Regular
******
Senior Member
1,227 posts

Joined: Jun 2010


I think many PR voters r kicking themselves after the cancellation of KIDEX and nw pobably DASH ...the Star paper used to play champion and highlight the "say no to kidex" protesters...how on earth the new MB justify his decision reason protect interest of the rakyat But he must remeber the majority wants and needs both kidex and dash except for those selfish few who happned to lived near...funny they have no poblem using other highways that oso cut across residential areas
SUSNew Klang
post May 6 2015, 10:08 PM

Look at all my stars!!
*******
Senior Member
4,998 posts

Joined: Dec 2010
I think most residents welcome improvements on the haphazard route design.
LMN9997
post May 7 2015, 04:37 PM

Getting Started
**
Junior Member
137 posts

Joined: Nov 2014
SNTD = JUAL IKAN!

51 Pages « < 17 18 19 20 21 > » Top
 

Change to:
| Lo-Fi Version
0.0254sec    1.10    6 queries    GZIP Disabled
Time is now: 18th December 2025 - 07:16 PM