Hahaha hopefully no o turn....
Investment [CONNECTIVITY] KVMRT 3 MRT CIRCLE LINE, Speculations about the Orbital Line
Investment [CONNECTIVITY] KVMRT 3 MRT CIRCLE LINE, Speculations about the Orbital Line
|
|
Apr 13 2021, 11:09 PM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
112 posts Joined: May 2019 |
Hahaha hopefully no o turn....
|
|
|
|
|
|
Apr 14 2021, 10:30 PM
Return to original view | Post
#2
|
![]() ![]()
Junior Member
112 posts Joined: May 2019 |
As usual, I think nearby mrt Station will have PPR / high density residential area
|
|
|
Apr 26 2021, 08:22 PM
Return to original view | Post
#3
|
![]() ![]()
Junior Member
112 posts Joined: May 2019 |
Since Semarak is the depot, will they build the Semarak & ayer panas station first? I just went to Semarak for survey and found some sewage /water piping construction (by puncak Alam) is going on....
|
|
|
Apr 26 2021, 09:36 PM
Return to original view | Post
#4
|
![]() ![]()
Junior Member
112 posts Joined: May 2019 |
QUOTE(vinceleo @ Apr 26 2021, 09:32 PM) Hahaha sry typo..... Its Puncak Niaga Construction... Anyway, there is an empty plot if there is a mrt3 Station at Semarak /ayer panas![]() vinceleo liked this post
|
|
|
Apr 29 2021, 07:19 PM
Return to original view | IPv6 | Post
#5
|
![]() ![]()
Junior Member
112 posts Joined: May 2019 |
QUOTE(nexona88 @ Apr 29 2021, 06:41 PM) ![]() Actually the empty plot land is pretty big.... The picture I took is just a part of the orange circle. While the purple circle is a foodball field, which I think government will utilise it for mrt Station if needed... On the other hand, the red circle land can be utilised as well if mrt /gov demolish the few houses/Chinese temple there.... |
|
|
Apr 29 2021, 09:14 PM
Return to original view | IPv6 | Post
#6
|
![]() ![]()
Junior Member
112 posts Joined: May 2019 |
QUOTE(nexona88 @ Apr 29 2021, 08:38 PM) Yeah.... Just not sure this will be ayer panas station or Semarak station... If this is really legit, then sky sanctuary master plan (by skyworld) will be huat & Heng. Since Semarak as the mrt3 depot, it will be under phase 1 and don't have to wait 10 years... |
|
|
Apr 30 2021, 08:36 AM
Return to original view | IPv6 | Post
#7
|
![]() ![]()
Junior Member
112 posts Joined: May 2019 |
|
| Change to: | 0.0192sec
0.57
7 queries
GZIP Disabled
Time is now: 11th December 2025 - 07:17 PM |