QUOTE(warface @ May 6 2019, 07:35 PM)
Investment [CONNECTIVITY] KVMRT 3 MRT CIRCLE LINE, Speculations about the Orbital Line
Investment [CONNECTIVITY] KVMRT 3 MRT CIRCLE LINE, Speculations about the Orbital Line
|
|
May 6 2019, 11:10 PM
Return to original view | Post
#21
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
|
|
|
May 9 2019, 01:13 AM
Return to original view | Post
#22
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
May 21 2019, 01:05 AM
Return to original view | Post
#23
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
Dec 24 2019, 04:53 PM
Return to original view | Post
#24
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
Sep 8 2020, 12:58 AM
Return to original view | Post
#25
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
mroys@lyn liked this post
|
|
|
Nov 6 2020, 08:39 PM
Return to original view | Post
#26
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
|
|
|
Apr 3 2021, 02:46 PM
Return to original view | Post
#27
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
Source: https://www.thestar.com.my/news/nation/2021...by-pakatan-govt ![]() PETALING JAYA: Cabinet has given the green light to go ahead with the MRT Circle line or MRT3, which was suspended by the Pakatan Harapan government. Transport Minister Datuk Seri Wee Ka Siong said that Cabinet made the decision on this recently. The government has given the green light to MRT Corp as the project owner and developer to update the studies that have been done in 2018 before the suspension of the project by the previous government," he told reporters on Saturday (April 3) during an inspection of the Sri Damansara Sentral Station, which is part of the MRT Putrajaya line or MRT2. He added that MRT Corp hoped to kick start the project in the second half of the year. The Circle Line, was planned to provide a loop link to the integrated public transport system in the Klang Valley by 2025. The line would circumnavigate the city centre and included areas such as Ampang Jaya, KL City Centre, Jalan Bukit Bintang, Tun Razak Exchange, Mont’ Kiara and Sentul. esyap liked this post
|
|
|
Apr 4 2021, 09:25 PM
Return to original view | Post
#28
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
In widely shared "speculative" versions, which has neither been confirmed nor denied by MRT Corp, the Circle Line will have stations at Bukit Kiara (interchange with Kajang MRT), INTAN-National Science Centre, Sri Hartamas, Mon't Kiara, Jalan Duta, Matrade, Segambut Tengah (interchange with KTMB), Sentul Barat (interchange with the currently under construction Putrajaya MRT Line), Sentul Timur (interchange with the Ampang LRT line), Setiawangsa (interchange with Kelana Jaya LRT line), Pandan Indah (interchange with Ampang LRT), Taman Midah (interchange with Kajang MRT), Salak Selatan (interchange with Sri Petaling LRT), Bandar Malaysia South (interchange with Putrajaya MRT), MidValley (interchange with KTMB), Kerinchi (interchange with Kelana Jaya LRT), and Universiti Malaya Medical Centre, among others. Source: https://www.thestar.com.my/news/nation/2021...by-pakatan-govt vinceleo liked this post
|
|
|
Sep 6 2021, 12:54 AM
Return to original view | IPv6 | Post
#29
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
![]() QUOTE(EmoGuy91 @ Sep 1 2021, 10:25 PM) Sos from SSC and Malaysian Land Public Transport Fans (MLPTF) FB group: This post has been edited by AskarPerang: Sep 6 2021, 12:54 AMS01 - Bukit Kiara (Interchange with Line 9 MRT Kajang Line) S01A - Pusat Sains Negara (Provisional Station) S02 - Sri Hartamas S03 - Mont Kiara S04 - Dutamas S05 - Taman Sri Sinar S06 - MATRADE S07 - Jalan Kuching (Interchange with Line 2 KTM Port Klang Line) S08 - Titiwangsa (Interchange with Line 3 & 4 LRT Ampang & Sri Petaling Line, Line 8 KL Monorail, Line 12 MRT Putrajaya Line) S09 - Kampung Puah S10 - Jalan Langkawi S11 - Danau Kota S12 - Setapak S13 - Rejang S14 - Setiawangsa (Interchange with Line 5 LRT Kelana Jaya Line) S15 - AU S16 - Hillview S17 - Ampang Point S18 - Desa Pandan S19 - Pandan Indah (Interchange with Line 3 LRT Ampang Line) S20 - Taman Kencana S21 - Taman Cheras S22 - Taman Midah (Interchange with Line 9 MRT Kajang Line) S23 - HCTM/HUKM S24 - Sri Permaisuri S25 - Salak Selatan (Interchange with Line 4 Sri Petaling Line) S25A - (Provisional Station) S26 - Salak Jaya/Kuchai (Interchange with Line 12 MRT Putrajaya Line) S27 - Jalan Klang Lama S28 - Pantai (Interchange with Line 2 KTM Port Klang Line) S29 - Pantai Permai S30 - Gasing (Interchange with Line 5 LRT Kelana Jaya Line) S31 - PPUM Currently they're conducting survey for EIA and SIA report. ![]() ![]() |
|
|
Oct 29 2021, 02:51 PM
Return to original view | Post
#30
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
Dec 31 2021, 07:09 PM
Return to original view | IPv6 | Post
#31
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
Mar 15 2022, 08:50 PM
Return to original view | IPv6 | Post
#32
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
Mar 21 2022, 06:33 PM
Return to original view | IPv6 | Post
#33
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
QUOTE(Cincailah @ Mar 21 2022, 06:30 PM) I would surprise for the mont kiara station, these area full of highrise, how they going to build the track thru all the highrise, some saying it might be underground but i curious it won't affected the highrise foundation structure? Interesting. The proposed Mont Kiara MRT3 station is underground. |
|
|
|
|
|
Mar 27 2022, 12:57 PM
Return to original view | IPv6 | Post
#34
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
QUOTE(contestchris @ Mar 24 2022, 03:33 PM) Where exactly are they going to build S08 Jalan Kuching? Nope. It is not interchange at Segambut KTM station. It is supposed to be connected to the KTM Segambut station as an interchange station, but when I check on Google Maps, the proposed location is close to the Putramas 3 condo. That's a rather far distance from the KTM station. https://www.google.com/maps/place/MRT3+Jala...3;4d101.6768509 It will be a new station. KTM/MRT3 Jalan Kuching station. |
|
|
Mar 28 2022, 04:47 PM
Return to original view | Post
#35
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
Jan 26 2023, 10:23 PM
Return to original view | IPv6 | Post
#36
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
A.B.D. liked this post
|
|
|
Jul 5 2024, 02:47 PM
Return to original view | Post
#37
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
|
|
|
Sep 8 2024, 11:41 AM
Return to original view | Post
#38
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
mroys@lyn liked this post
|
|
|
Sep 2 2025, 10:18 AM
Return to original view | Post
#39
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
23,688 posts Joined: Aug 2007 From: Outer Space |
Ckmwpy0370, bee002, and 1 other liked this post
|
| Change to: | 0.0399sec
0.42
7 queries
GZIP Disabled
Time is now: 14th December 2025 - 03:17 PM |