Investment [CONNECTIVITY] KVMRT 2 SG BULOH-PUTRAJAYA LINE, And also news about Circle Line
Investment [CONNECTIVITY] KVMRT 2 SG BULOH-PUTRAJAYA LINE, And also news about Circle Line
|
|
Mar 11 2014, 10:15 PM
Return to original view | Post
#1
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
|
|
|
|
|
|
Mar 13 2014, 05:14 PM
Return to original view | Post
#2
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
Actually there is a link between the MRT station @ precint 14 to Putrajaya sentral. That plan have been approved long time ago since Tun Mahathir and it is under Putrajaya Corporation. Some of the track and under ground station have been constructed. Just to Share
This is the route for Putrajaya Monorail. ![]() This is the master plan for Putrajaya |
|
|
Apr 29 2014, 09:59 PM
Return to original view | Post
#3
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
Pls dont put religion n race issue In discussion lah.
Not all Muslim friend don like dog Some of them also feed dog n got guard dog at house. Army, police n karstam also got dog le. This post has been edited by tangent88: Apr 29 2014, 09:59 PM |
|
|
May 21 2014, 05:24 PM
Return to original view | Post
#4
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
QUOTE(gsw8895 @ May 21 2014, 02:58 PM) become PJ ? PJ full with british colonial style single storey house..it looks lot older than Cheras ...infra wise only have putra line... should compare in life style and household income. Building sure will be difference coz was built in difference year.This post has been edited by tangent88: May 21 2014, 05:30 PM |
|
|
Oct 11 2014, 02:59 PM
Return to original view | Post
#5
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
What a shock when PM announced that mrt2 as selayang putrajaya line. It really a good news to selayang residents.
So pity kepong kaki mrt tiada but got incinerator. believe most of the kepong people already heart break lo.... This post has been edited by tangent88: Oct 11 2014, 02:59 PM |
|
|
Oct 13 2014, 11:56 AM
Return to original view | Post
#6
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
Maybe our Gov have seem something far beyond our naked eye.
another brand new depot gonna to be build in selayang for future mrt Line 4, 5, 6, 7.... Good opportunity to make money & raise our GDP lol... |
|
|
|
|
|
Dec 9 2014, 12:59 PM
Return to original view | Post
#7
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
QUOTE(johnchew91 @ Dec 9 2014, 12:48 PM) Recently there are some ground work construction in front of Kepong Jusco, zKepong Carefour (Aeon Big) and Public Bank (Taman Rimbunan).. whole stretch of the jalan kepong main road.. Not sure whether it is related to the MRT2 or not.. Will upload pictures of it soon.. that is the kepong bus hub. |
|
|
Dec 9 2014, 06:16 PM
Return to original view | Post
#8
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
QUOTE(johnchew91 @ Dec 9 2014, 05:27 PM) Just now I went and ask (geh poh) the workers of the ground works.. the rest i not sure is it SI data collection.In front of the Kepong Jusco, they gonna build a pedestrian bridge fly over to the Kepong jusco.. Then I go over another ground works (yellow boxes) to geh poh again.. the workers said they are appointed for researching/collecting data of the land for MRT2 Right in front of the public bank kepong have 31 checkpoints.. They drill 80m - 100m into the ground and decide which point is suitable to build the piller/station of MRT2.. If you guys passed by Kepong, you might see some ground works as I drawn in the image below.. they moved from point to point.. at the moment is in front of the public bank kepong.. I live in Kepong, so I'm quite excited about this [attachmentid=4252130] [attachmentid=4252133] The one in front jusco cannot be is constructing a pedestrian bridge. Bored pile machine is at site. Must be a huge structure. Pedestrian bridge normal driven R.C pile enough. What i found is few teams of worker is doing SI data collection nearby the Kepong sentral but not sure is for MRT or Duke Highway. For my understanding Duke SI should be completed before the construction has started. Coz i found some caisson pile at jln bukit maluri & junction at LDP is carry-on. so my guessing is high change for MRT. This post has been edited by tangent88: Dec 9 2014, 06:21 PM |
|
|
Feb 12 2015, 10:46 AM
Return to original view | Post
#9
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
Wat a shock..
mean there are chances that MRT2 will not pass by cheras and the mines. the only confirm are Sg Buloh, Serdang n Putrajaya Sentral. |
|
|
Feb 12 2015, 02:14 PM
Return to original view | Post
#10
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
QUOTE(HELLO HELLO @ Feb 12 2015, 12:59 PM) but some permanent structure for mrt2 cheras connaught station already builded during mrt1 construction. macam mana ini. so far the how the interchange at cheras connaught station gonna be still a question mark.now the progress in cheras connaught station is mainly at the superstructure for rail & station. The multilevel parking still not start yet. so my opinion still got chances to change. As previous post it may from TRX to Sg besi, kuchai lama, Bkt Jalil, serdang & putrajaya sentral. |
|
|
Apr 8 2015, 08:57 AM
Return to original view | IPv6 | Post
#11
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
QUOTE(youngmasterho @ Apr 8 2015, 08:32 AM) i'm very much interested in knowing how will they build from serdang (serdang raya, perhaps?) to taman universiti indah? not much reserved land to be acquired...or could i be wrong? local serdang people will know how from serdang raya to tmn university without passing serdang main road.So there are plenty empty land in bukit serdang so worry. |
|
|
Apr 20 2015, 04:11 PM
Return to original view | IPv6 | Post
#12
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
Northern Elevated Segment (Damansara Damai – to Jalan Ipoh)
17. The SSP Line starts just after the KTM Sg Buloh Station, crosses over to the south of Jalan Kuala Selangor towards Damansara Damai where Station S01 is proposed. The line continues along Jalan Kuala Selangor, passing by Prima Damansara and Bandar Sri Damansara to the proposed Station S02 near Wisma ING and 8trium. 18. The line runs crosses to the north of Jalan Kuala Selangor after Damansara Avenue to proposed Station 03 near the PJU 9 Sri Damansara. The line continues along Persiaran Dagang towards proposed Station 04 which will be an interchange station with KTM Komuter. After crossing KTMB tracks and Selayang-Kepong Highway, the line moves along Jalan Kepong before reaching proposed Station 05 near AEON Metro Prima and then Station 06 further up Jalan Kepong. 19. The line then travels parallel to Jalan Kepong as it heads towards the proposed Station S07 and Station S08. After that, the line crosses Jalan Kuching and KTMB Railway tracks towards the proposed Station S09, another interchange station with KTM. The line then swings towards the south and travel towards Jalan Ipoh to Station S10 near Taman Rainbow. The line continues along Jalan Ipoh and runs underneath the DUKE before reaching the proposed Station S11 near Kompleks Mutiara. |
|
|
Apr 20 2015, 04:11 PM
Return to original view | IPv6 | Post
#13
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
Underground Segment (Jalan Ipoh – Bandar Malaysia South)
20. The underground section starts at Jalan Ipoh where there will be Station S12. The line then veers away from Jalan Ipoh near SK Sentul Utama towards the proposed Station S13, an interchange station with the LRT and KL Monorail at Titiwangsa. 21. The line then traverses close to the Pekeliling Mosque, Istana Budaya and Hospital KL where Station S14 is proposed. The line then continues under Jalan Tun Razak and HKL Quarters Complex, heading towards Jalan Raja Muda Abdul Aziz in Kampong Bharu where Station S15 is proposed near Setia Sky Residences. 22. The line then connects to the proposed Station S16, another interchange station with LRT below IMC Parkville Development and Ampang Park Shopping Centre, near Megan Avenue 1. Station S17 near KLCC and Station S18 at Jalan Conlay are the next destinations. 23. Then the alignment continues south and crosses Jalan Bukit Bintang towards Station S19 at the Tun Razak Exchange (TRX) development, where there will be an interchange with the SBK Line (currently under construction). The line veers right and goes below the Maju Expressway, Jalan Tun Razak and the SMART Tunnel. It continues south towards the Jabatan Kerja Raya workshop where Station S20 will be located. It will interchange with the existing Chan Sow Lin LRT Station. 24. After Station S20, the alignment heads south along Jalan Chan Sow Lin, passes Percetakan Nasional Berhad Malaysia and Chan Sow Lin industrial area, and heads towards the launch shaft area at the north of the Pengkalan Tentera DiRaja Udara Malaysia base (TUDM) where Station S21 is proposed. The line continues south within the TUDM base until the proposed Station S22, where there will be an interchange with the proposed High Speed Rail (HSR). |
|
|
|
|
|
Apr 20 2015, 04:12 PM
Return to original view | IPv6 | Post
#14
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
Southern Elevated Segment 1 (Bandar Malaysia South – UPM)
25. After Station S22, the line will run below the East West Highway and along Kuala Lumpur-Seremban Expressway towards the Kuchai Lama industrial area where Station S23 is proposed. The line veers left and continues south, crossing the Maju Expressway and Sg Besi Highway besides Kampung Baru Salak South and continues parallel to the Sg Besi Highway and then crosses to SK Salak South towards Taman Naga Emas and Institute Sosial Malaysia where Station S24 is proposed. From Station S24, the line continues south towards Pekan Sg Besi where Station S25 is proposed close to the existing LRT Station. 26. The line then crosses to the west of KTM Komuter and ERL as it moves south and crosses the Bukit Jalil Highway and the Kuala Lumpur Seremban Expressway until the proposed Station S26 opposite the Serdang Raya Plaza. It then traverses the commercial area between Kuala Lumpur Seremban Expressway and Jalan Utama to arrive at the proposed Station S27 at the end of Jalan Utama. 27. On its way to proposed Station S28 near Balai Bomba dan Penyelamat Serdang, the line will cross Jalan Utama, Jalan Besar and Sg Kuyoh before swinging into Jalan Raya Satu in Seri Kembangan. The line continues along Jalan Raya Satu and Jalan Raya Tiga as it passes the Kawasan Perindustrian Seri Kembangan before it reaches the proposed Station S29 which is located within the Universiti Putra Malaysia (UPM) land. |
|
|
Apr 20 2015, 04:12 PM
Return to original view | IPv6 | Post
#15
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
Southern Elevated Segment 2 (UPM – Putrajaya)
28. After Station S29, the line travels along the MARDI compound and splits towards the proposed Serdang Depot. The line then goes to the proposed Station S30, west of Institut Latihan Perkembangan Pertanian Selangor before travelling along Jalan Putra Permai and passing Taman Equine and Taman Pinggiran Putra to reach the proposed Station S31. 29. The line then continues along Jalan Putra Permai, passing Pusat Bandar Putra Permai, Kompleks Pasar Borong Selangor and Giant Hypermarket before it reaches Station S32 near The Atmosphere. After moving through D‟Alpinia and 16 Sierra, the line reaches the proposed Station S33. 30. At the end of Persiaran Sierra Utama, the line crosses Maju Expressway towards Cyberjaya area and follows Persiaran Apec where Station S34 is proposed near the Sky Park. After this station, the line continues along Persiaran Apec, passes Limkokwing University before Station S35. The line then traverses towards Station S36 (terminal station) which is also an interchange station with the ERL and the proposed HSR. |
|
|
Apr 20 2015, 04:14 PM
Return to original view | IPv6 | Post
#16
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
|
|
|
Apr 22 2015, 10:43 AM
Return to original view | IPv6 | Post
#17
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
QUOTE(elmond @ Apr 22 2015, 09:38 AM) built a suspension pedestrian walk way is easy, the headache part is who to pay for the maintenance? resident in one south or developer?maintenance free walkway is the concrete type which we always see but it limit to 30m. |
|
|
Apr 22 2015, 05:12 PM
Return to original view | IPv6 | Post
#18
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
|
|
|
Apr 27 2015, 10:16 PM
Return to original view | Post
#19
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
QUOTE(fongozic @ Apr 27 2015, 09:25 PM) resident protest on MRT2 at Sri damansara utara By fongozic.http://www.nanyang.com/node/697198?tid=511 (chinese news ) |
|
|
Sep 18 2016, 11:14 AM
Return to original view | Post
#20
|
![]() ![]() ![]()
Junior Member
438 posts Joined: Apr 2013 |
|
| Change to: | 0.0642sec
0.58
7 queries
GZIP Disabled
Time is now: 12th December 2025 - 04:30 AM |